Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m
Line 28: Line 28:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
 +
|[[image:Main Page Apr 27, 2018.jpg|center|400px|thumb|''' <center>  [https://alberici.com/ Alberici Constructors] employees work with the massive, newly-arrived girders for the [http://www.modot.org/stlouis/major_projects/Route47MissouriRiverBridge/ Rte. 47 Missouri River Bridge] at Washington, MO.  The almost $63 million bridge will have two 12-ft. lanes and 10-ft. shoulders on the inside and outside as well as decorative lighting, railing details and decorative columns.  The new bridge will be open by late 2018 and all construction is expected to be completed by the summer of 2019.      </center>''']]
 +
|- 
 
|[[image:Main Page Apr 6, 2018.jpg|center|400px|thumb|''' <center>  All four lanes of [http://www.modot.org/southwest/Online%20Public%20Meeting/ChestnutRROverpass.htm Chestnut Expwy. west of Rte. 65] in Springfield are now open. Lane closings are expected for the next couple of weeks as the project is finished.      </center>''']]
 
|[[image:Main Page Apr 6, 2018.jpg|center|400px|thumb|''' <center>  All four lanes of [http://www.modot.org/southwest/Online%20Public%20Meeting/ChestnutRROverpass.htm Chestnut Expwy. west of Rte. 65] in Springfield are now open. Lane closings are expected for the next couple of weeks as the project is finished.      </center>''']]
 
|-
 
|-
Line 37: Line 39:
 
|-
 
|-
 
|[[image:Main Page Apr 6c, 2018.jpg|center|400px]]
 
|[[image:Main Page Apr 6c, 2018.jpg|center|400px]]
|-
 
|[[image:Main Page Apr 2, 2018.jpg|center|400px|thumb|''' <center>  MoDOT is repairing [http://www.modot.org/kansascity/major_projects/I_470_Bridges.htm 15 bridges along I-470 from Blue Ridge Blvd. to I-70].  Crews are progressing well on the Cedar Cr. Bridge in Lee’s Summit.      </center>''']]
 
 
|}
 
|}
  
Line 76: Line 76:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[102.2 Contractor Performance Rating System#102.2.7 Performance Discussion|EPG 102.2.7 Performance Discussion]]'''
 +
 +
4/27/18: Guidance for when certified mail is necessary for the Contractor Performance Rating has been updated.
 +
 
'''[[751.50 Standard Detailing Notes#(E2.27)|EPG 751.50 Standard Detailing Notes]]'''
 
'''[[751.50 Standard Detailing Notes#(E2.27)|EPG 751.50 Standard Detailing Notes]]'''
  
Line 169: Line 173:
  
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.89 Radar Speed Advisory Assembly|EPG 616.6.89 Radar Speed Advisory Assembly]]'''
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.89 Radar Speed Advisory Assembly|EPG 616.6.89 Radar Speed Advisory Assembly]]'''
 
2/9/18: Expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
 
 
'''Revised Galvanized Pile Requirements'''
 
 
2/9/18: In [[:Category:702 Load-Bearing Piles|EPG 702 Load-Bearing Piles]], [[751.1 Preliminary Design#751.1.2 Bridges/Boxes|EPG 751.1.2 Bridges/Boxes]], [[751.36 Driven Piles|EPG 751.36 Driven Piles]], [[751.50 Standard Detailing Notes#E2. Foundation Data Table|EPG 751.50 E2]], [[751.50 Standard Detailing Notes#G. Substructure Notes|EPG 751.50 G]], the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50). 
 

Revision as of 11:18, 27 April 2018

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Alberici Constructors employees work with the massive, newly-arrived girders for the Rte. 47 Missouri River Bridge at Washington, MO. The almost $63 million bridge will have two 12-ft. lanes and 10-ft. shoulders on the inside and outside as well as decorative lighting, railing details and decorative columns. The new bridge will be open by late 2018 and all construction is expected to be completed by the summer of 2019.
All four lanes of Chestnut Expwy. west of Rte. 65 in Springfield are now open. Lane closings are expected for the next couple of weeks as the project is finished.
Main Page Apr 6a, 2018.jpg
Sliding the eastbound I-64/I-55 bridge (the Poplar St. Bridge) 9 ft. to the south across the Mississippi River to add an extra lane to the eastbound lanes.
Main Page Apr 6b, 2018.gif
Main Page Apr 6c, 2018.jpg

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late April, the numbers of hits are:
20. EPG 136 169655  10. EPG 751.5 239528
19. EPG 134 178642  9. EPG 616.23 274228
18. EPG 751.40 179664  8. EPG 600 277931
17. EPG 136.4 179783  7. EPG 100 326788
16. EPG 620.2 189377  6. EPG 700 344132
15. EPG 903 198004  5. EPG 900 363048
14. EPG 200 206343  4. EPG 101 390286
13. EPG 751.50 208863  3. EPG 136.12 392493
12. EPG 136.9 218473  2. EPG 751 456443
11. EPG 616 223196  1. EPG Main Page 3115381

EPG 102.2.7 Performance Discussion

4/27/18: Guidance for when certified mail is necessary for the Contractor Performance Rating has been updated.

EPG 751.50 Standard Detailing Notes

4/25/18: A new standard detailing note about deviations in galvanized pile penetration is now available.

EPG 903.4.6 Span, Cantilever and Butterfly Box Trusses

4/16/18: Guidance about drilled shaft footings has been clarified. MoDOT may be the designer of the footing and if not, others will have to submit signed and sealed drawings.

EPG 751.50 Standard Detailing Notes

4/13/18: In EPG 751.50 D. Temporary Bridge, revisions include a new clarifying note D1.5 and replacing an archaic option in D1.21 with the current option. In EPG 751.50 H9. Thrie Beam and Other Rail Types, revisions include the new H9.29 for two thrie beam standard drawings.

EPG 751.8.3.4 Wing Walls on Rock

4/11/18: New guidance for culvert wing walls on rock is now available.

Inclusion of DOL Wage Rates In Contracts

4/10/2018: In EPG 110.1 Wage Rates, guidance about including the correct wage rate order from the Dept. of Labor on MoDOT projects was updated.

Special Watersheds where MoDOT has been assigned a Wasteload Allocation

4/9/18: Guidance to go with the MDNR permit agreement has been added.

Project Bulletin Board Inspection Rate

4/5/18: The bulletin board inspection rate was revised from every two months to every three months.

EPG 749.5.3 Time of Concentration

4/5/18: Time of Concentration guidance was revised by providing an optional combination of Kirby-Hathaway and Kirpich equations and adding the optional low slope factor presented in new research.

Bridge Survey Report

4/4/18: The latest version of this form is now available.

EPG 237.13.5 Example Set of Electronic Design Data

4/3/18: This chart has been updated with current examples.

EPG 236.5.16.1 Fee Simple vs. Less Than Fee Simple Interest

4/2/18: Clarified guidance about the legal title of opinion for excess property appraised for $25,000 or less that includes any references to right of way in the acquisition deed.

Light Bar Guidance

4/2/18: In EPG 616.8 Typical Applications, light bar policy in TA-35 and TAs 35a-d was clarified by highlighting in a note that the light bar is optional. Also, Light Bar guidance in EPG 616.27 Fleet Lighting was updated.

Obtaining DBE Concurrence Electronically in eAgreements

3/28/18: DBE Concurrence may now be electronically obtained in eAgreements. MOU execution process, consultant contract and supplemental agreement guidance was updated.

EPG 751.2.2 Transient Loads

3/27/18: Wind pressure on vehicles, braking force and centrifugal force are assumed to act horizontally at the roadway surface, per AASHTO agenda.

Contract Leveling Course (CLC) and Seal Coat

3/27/18: The Contract Leveling Course and Seal Coat guidelines, pdf files, as well as their respective JSP packages were updated.

EPG 103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes

3/20/18: Guidance was updated for ProjectWise.

EPG 237.14 Electronic Design Data Delivery

3/16/18: EPG 237.14 has been completely rewritten and updated. Please carefully read and note the changes.

EPG 751.1.2.21 Substructure Type

3/9/18: Guidance for minimum galvanized penetration (elevation) was added for piles for retaining walls supported on piles and bridge end bents on piles with embankments supported by MSE walls.

TMA Light Bar

3/8/18: In EPG 612.1.3 MoDOT Protective Vehicle/TMA Guidelines, the TMA Light Bar is now temporarily optional and not required to be purchased for use. In EPG 616.8 Typical Applications, TA-35 MT and TAs 35a-35d MT were also updated with this information.

Tack Coat Estimate Factors

2/27/18: The tack coat estimate factors were updated in EPG 450 Bituminous Pavement Design.

EPG 146.2 DBE Subcontract

2/22/18: Clarified guidance regarding overruns and underruns as they relate to DBE participation.

DBE Concurrence and Executing Consultant Contracts

2/16/18: Guidance in EPG 134.2.4 MoDOT MOU Execution Process, EPG 134.4 Contract Approval, Execution and Distribution, EPG 134.5.2 Supplemental Agreements and EPG 153.8 Design now directs that DBE Concurrence must be requested prior to executing consultant contracts.

D-15 Material List

2/9/18: In 237.7 Equipment and Materials List, designers are now required to include the D-15 in the Electronic Deliverables.

EPG 616.6.89 Radar Speed Advisory Assembly