Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.10, EPG 751.22)
m (EPG 751.50)
Line 69: Line 69:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[751.50 Standard Detailing Notes#J1.20a|Standard Detailing Note J1.20a]]'''
 +
 +
11/22/16: The shop drawing requirements in this note were clarified.
 +
 
'''Hairpin Bars'''
 
'''Hairpin Bars'''
  
Line 166: Line 170:
  
 
'''[[:Category:703 Concrete Masonry Construction#703.2.7 Machine Finishing|EPG 703.2.7 Machine Finishing]]'''
 
'''[[:Category:703 Concrete Masonry Construction#703.2.7 Machine Finishing|EPG 703.2.7 Machine Finishing]]'''
 
8/25/16: Guidance for the use of a vibratory screed was expanded and clarified.
 
 
'''[[:Category:401 Bituminous Base and Pavement#401.2.3 Job Mix Formula (Sec 401.4)|EPG 401.2.3 Job Mix Formula]] and [[460.3 Plant Inspection#460.3.13 Asphalt Binder Sampling|EPG 460.3.13 Asphalt Binder Sampling]]'''
 

Revision as of 14:31, 22 November 2016

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Demolition of the old Platte Purchase Bridge is underway. The new US 69 Missouri River Bridge, which is replacing it, is partially open.
Clarkson Construction Company crews pour concrete for the new Grand Ave. bridge over I-670 in downtown Kansas City. The project is expected to reopen Grand Ave. to traffic by Dec. 1.
The Rte. 50/63 Lafayette Interchange was dedicated in a ribbon-cutting ceremony with Boys & Girls Club of Jefferson City, Lincoln Univ. (MO) Army ROTC, Lincoln Univ. (MO), Jefferson City Public Schools, Quinn Chapel AME Church Jefferson City, Mo., Sen. Mike Kehoe, City of Jefferson, Missouri, Central Dist. Engineer David Silvester and many others.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late November, the numbers of hits are:
20. EPG 136, 145268 10. EPG 616, 196381
19. EPG 134, 148967 9. EPG 600, 231615
18. EPG 751.40, 151818 8. EPG 616.23, 253118
17. EPG 136.4, 160856 7. EPG 100, 282808
16. EPG 751.50, 160932 6. EPG 700, 291843
15. EPG 620.2, 167819 5. EPG 101, 305208
14. EPG 903, 171951 4. EPG 900, 315911
13. EPG 200, 176369 3. EPG 136.12, 340900
12. EPG 136.9, 185929 2. EPG 751, 394799
11. EPG 751.5, 189736 1. EPG Main Page, 2563328

Standard Detailing Note J1.20a

11/22/16: The shop drawing requirements in this note were clarified.

Hairpin Bars

11/22/16: Hairpin guidance in EPG 751.10.1.14 Girder Haunch Reinforcement was expanded and clarified, especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.

Girder Reinforcement

11/22/16: In EPG 751.22 P/S Concrete I Girders, guidance for shear reinforcement was updated to current practice. Guidance for A1 reinforcement was revised to not use the WWR located in the flange of NU girders.

MoDOT and the Environment

11/10/16: Guidance in EPG 127.9 Floodplain Management and the Regulatory Floodway, EPG 127.11 Farmland Conversion and EPG 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties was updated to reflect new processes and forms.

New QRGs

11/9/16: The Land Disturbance QRG was replaced with three new Land Disturbance QRGs.

EPG 236.6.2 Scope of Assignment

11/9/16: Guidance was updated to reflect current practices. "Scope of Assignment for Simple Assignment or Experienced Staff and Fee" was removed.

EPG 106.16 Special Designs

11/8/16: Guidance for handling drawings from suppliers was expanded.

EPG 643.2.16.1 Buy America Guidelines for Utilities

11/1/16: Guidance has reverted to the previous, more relaxed, FHWA interpretation of Buy America.

Title Datum and Allied Services

11/1/16: Guidance in EPG 236.4.4.5 Agreements Between Commission and Abstractor or Title Companies and EPG 236.4.4.7 Procedure for Obtaining Title Services updated the agreements between Commission and abstractor or title companies to be current with business practices.

EPG 616.16 Law Enforcement Services

11/1/16: Guidance provided for incorporating law enforcement into contractor projects and maintenance operation work zones.

EPG 153 Agreements and Contracts

10/26/16: Guidance has been updated due to implementation of eAgreements.

EPG 751.50, H3. Bearings and I1.51

10/25/16: Notes H3.29.1, H3.49.1 and I1.51 were revised.

EPG 236.5.21.5 Full Disclosure Clause

9/29/16: The full disclosure clause was updated to reflect how MoDOT currently handles property conveyances.

EPG 751.5.1.4 Contract Addendums and Construction Changes

9/29/16: Guidance for change orders to bridge plans has been revised.

EPG 751.36.2 Steel Pile

9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified.

Value Engineering

9/23/16: EPG 130.1 Discussion was updated to reflect the tracker identified goal. A new workbook is available for a district-led Value Analysis.

Preliminary Design of a Bridge

9/23/16: EPG 751.1.1 Overview has been updated to reflect current practice.

EPG 751.10.1.11 Slab Elevations

9/23/16: Guidance is now coordinated with MicroStation cells.

EPG 237.2.8 Utility Information Note

9/23/16: The note required to be placed on the title sheet has been expanded.

EPG 109.1 Measurement of Quantities

9/22/16: Guidance about measuring quantities was clarified.

EPG 903.2.12 Quantity Computations and EPG 903.3 Post-Mounted Signing

9/15/16: Revisions have brought these articles' guidance into conformance with various recent standard plan and policy changes.

EPG 110.3 Prevailing Wages and Records

9/14/16: Guidance has been updated to comply with the e-Construction JSP. For instance, #6a now reminds payroll checkers to consider overtime rules and #7c clarifies how to handle subsistence withholdings made by contractors.

EPG 131.1 Design Exception Process

9/6/16: Federal rules have reduced the controlling criteria to 10, reducing the instances in which federal approval is required on federal involvement projects. The expectations for documentation have also been updated.

EPG 907.1 Safety Program Guidelines

8/26/16: New guidance for safety funds is now available. Also, the article was generally restructured and clarified.

EPG 127.7 Threatened and Endangered Species

8/25/16: This article was updated and clarified, including the addition of new info on migratory birds.

EPG 703.2.7 Machine Finishing