Main Page

From Engineering_Policy_Guide
Revision as of 15:58, 30 December 2008 by Mastes (talk | contribs) (correct spelling of "asphaltic")
Jump to navigation Jump to search
Engineering Policy Guide.jpg
NEW ENGINEERING POLICY GUIDE
RECENT POLICY CHANGES IN THE EPG
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. The same innovative concepts such as practical design and design-build that were used to deliver those commitments, have made MoDOT a leader in the transportation industry. These forward thinking, innovative concepts were continued with the decision to incorporate all MoDOT's engineering manuals under a single cover.

MoDOT is proud to present the new ENGINEERING POLICY GUIDE. This document is the result of a yearlong effort to combine the Right of Way, Design, Bridge, Construction, Traffic and Maintenance Manuals; providing a single reference for all engineering guidance.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software used to deliver the new manual. A small HELP ARTICLE is included to assist you with some helpful hints on how to use the manual as well as other points of interest. This HELP ARTICLE will be expanded as questions arise. You will find this format easy to navigate and more pleasing to read.

Modified Bridge Approach Slab

12/30/08: Guidance concerning the use of bridge approach slabs has been changed. Bridge approach slabs are still not used on minor roadways with asphaltic pavement; however, a modified bridge approach slab is used on minor roadways with concrete pavement.

Class 3 Excavation

12/24/08: Minor revisions were made to 206 Excavation for Structures to clarify that no direct payment is made for excavation and backfilling for crossroad pipe culvert installation.

New flashing yellow arrow guidance

12/19/08: New flashing yellow arrow guidance has been provided, primarily in 902.5.2.2 Left Turn Phasing, 902.6.5.2.6 Flashing Yellow Arrow ,902.11.28 Guidelines for Optional Use of the Flashing Yellow Arrow at Signalized Intersections and 903.5.41 TRAFFIC SIGNAL Signs articles.

Type D and E Crashworthy End Terminals

12/19/08: New guidance for Type D and E crashworthy end terminals is available in 606.1.3.2 Approved Crashworthy End Terminals.

Temporary Traffic Barriers

12/19/08: Contractors may now provide any temporary traffic barrier that meets NCHRP 350 criteria and has FHWA approval.

Construction Inspection Guidance for Records to be Maintained

12/04/2008: Guidance for archiving change orders has been modified. Change order copies that contain original signatures will now reside in the Resident Engineer's project file.

Typical Detour Figure

11/3/08: The typical detour figure, sheet 2 of 4, has been revised to clarify payment of detour signs.

616.13.2 Temporary One-Lane, Two-Way Operations

10/28/08: Contractors may opt to use portable flagger device control in lieu of current flagger control options for 2-lane highways.

Operator’s Guide for Anti-Icing

10/28/08: Printable versions (pdfs) of the tables in 133.5 Operator’s Guide for Anti-Icing are now available.

LETS

10/2/08: The Local Exchange of Transportation Services (LETS) article has been updated.

Typical Applications for Traffic Control

9/25/08: Printable versions (pdfs) of Typical Applications for Traffic Control are now available in 616.23 Traffic Control for Field Operations.

Labor Compliance

9/23/08: Guidance for conducting payroll reviews and wage rate interviews in 135.5 Labor Compliance has been rewritten to more clearly explain the requirements.

Highway Safety Plan and Performance Plan

8/27/08: 132.4 Highway Safety Plan and Performance Plan describes how Missouri’s Section 402 State and Community Highway Safety Program grant will be used to promote highway safety.

2008 Roadway Visibility Direction

8/20/08: The provisions of the 2008 Roadway Visibility Direction have been fully incorporated into 620 Pavement Marking in 620.1 General (MUTCD Chapter 3A) and 620.2 Pavement and Curb Markings (MUTCD Chapter 3B).

Contract Plans Addendum Process

8/20/08: New guidance, 237.9.6 Electronic Plans PS&E Submittal Guidelines and 103.1.6.6.1 Identification of Revisions in Addendums, for districts on how to show changes within an addendum to eliminate confusion when the contractors receive revised plans.

Increased spacing between FRESH OIL/LOOSE GRAVEL and NO CENTER LINE STRIPE signs

8/20/08: In 616.23.2.5.7 Pavement Markings, the distance between NO CENTER STRIPE and FRESH OIL/LOOSE GRAVEL signs was increased to two miles to reduce costs while providing acceptable service.

616.14.8 Significant Projects Definition

8/20/08: The definition of a significant project was amended to reduce the burden on district staff by eliminating the TMP requirement on projects with minor impacts to traffic.

Railroad Crossing Median Islands

8/11/08: This new section provides guidance for the use of median islands in conjunction with automated warning signals and gates at railroad crossings on low speed two lane roadways. These islands are required for the establishment of "Quiet Zones".

Inspections Based on Non-MoDOT Specifications

8/8/08: This new article provides guidance for MoDOT inspectors using non-MoDOT specifications during inspections or while administering contracts.

Changeable Message Signs (CMS)

7/30/08: Changeable Message Sign guidance was simplified so that guidance for non-temporary traffic control for CMSs along freeways and expressways now defers to Dynamic Message Sign guidance.