Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (EPG 147.4)
Line 2: Line 2:
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 +
'''[[147.4 Fixed Price Variable Scope (FPVS) Contracting|EPG 147.4 Fixed Price Variable Scope Contracting]]'''
 +
 +
3/25/20: This new article provides guidance for the new contracting method, FPVS Contracting.
 +
 
'''[[153.19 Right of Way|EPG 153.19 Right of Way]]'''
 
'''[[153.19 Right of Way|EPG 153.19 Right of Way]]'''
  
Line 97: Line 101:
  
 
1/10/20: [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]] has been updated along with supporting guidance such as [[806.5 Site Inspections and BMP Repair|EPG 806.5 Site Inspections and BMP Repair]] to reflect the issuance of MoDOT's new State Operating Permit from DNR. Related new guidance includes [[237.2 Title Sheet#237.2.8 Estimated Area of Disturbance|EPG 237.2.8 Estimated Area of Disturbance]] and [[237.4 Plan-Profile Sheets#237.4.12 Erosion and Sediment Control Sheets|EPG 237.4.12 Erosion and Sediment Control Sheets]].
 
1/10/20: [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]] has been updated along with supporting guidance such as [[806.5 Site Inspections and BMP Repair|EPG 806.5 Site Inspections and BMP Repair]] to reflect the issuance of MoDOT's new State Operating Permit from DNR. Related new guidance includes [[237.2 Title Sheet#237.2.8 Estimated Area of Disturbance|EPG 237.2.8 Estimated Area of Disturbance]] and [[237.4 Plan-Profile Sheets#237.4.12 Erosion and Sediment Control Sheets|EPG 237.4.12 Erosion and Sediment Control Sheets]].
 
'''Use of Hyphens in Structural Detailing'''
 
 
1/7/20: Guidance in [[751.5 Structural Detailing Guidelines#When dimensions and quantities|EPG 751.5.1.3.4 Plurality]] and [[751.5 Structural Detailing Guidelines#751.5.1.3.6 Punctuation|EPG 751.5.1.3.6 Punctuation]] was updated for the uniform use of hyphens.
 

Revision as of 13:59, 25 March 2020

EPG 147.4 Fixed Price Variable Scope Contracting

3/25/20: This new article provides guidance for the new contracting method, FPVS Contracting.

EPG 153.19 Right of Way

3/24/20: New eAgreements, RW55 - RW60, has been added to the listings.

EPG 642 Pedestrian Facilities

3/20/20: Please closely read this article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.

EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities

3/16/20: Borrow practices have been clarified and new permit information has been provided.

DBE and Non-DBE Subcontractor Reporting Form

3/16/20: Guidance for this form is now available in EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting.

EPG 127.12 Air Quality

3/13/20: Guidance was clarified.

EPG 147.3.10 Guardrail and Guard Cable Repair

3/13/20: This new guidance assists JOC administrators to identify high priority repairs for guardrail and guard cable.

Preliminary Structure Guidance

3/9/20: Superstructure selection guidance has been updated throughout EPG 751.1.2.7 Structure Type Selection to EPG 751.1.2.17 Preliminary Cost Estimate. Pricing and bridge replacement information was updated.

EPG 127.26 Environmental Classification

3/4/20: The definitions of Categorical Exclusion, Environmental Assessment and Environmental Impact Statement were updated.

EPG 136.4.2.4.3 Using the LPA On-Call Consultant List

2/27/20: Two new categories (Environmental and Historic Preservation) have been added to the LPA on-call consultant guidance.

EPG 236.4.4 Title Services and Responsibility

2/26/20: Guidance now reflects the recent interim guidance for determining responsibilities for the ADA transition plan and other construction requirements. EPG 236.4.4 Title Datum and Allied Services was retitled "Title Services and Responsibility".

EPG 607.1 Fencing Applications

2/14/20: Guidance for installing Interstate highway fencing was revised to current practice.

Deck rehabilitation

2/6/20: Deck rehabilitation guidance has been updated to current methods. Pay items in EPG 751.6.1 Index of Quantities were updated for supplementary wearing surface material. Rehabilitation design guidance was expanded in EPG 751.1.3 Wearing Surfaces/Rehabs/Redecks/Widenings and EPG 751.40.2.2 Special Repair Zones through EPG 751.40.3.1 Wearing Surfaces and added in EPG 216 Removals for Bridge Structures. Standard detailing notes were updated to reflect these revisions. EPG 1039 was re-titled as “Polymer Products”.

EPG 109.14 Price Adjustment for Fuel

1/30/20: Guidance has been coordinated with established AWP/SM practices.

EPG 751.6.2.17 Excavation

1/30/20: Excavation guidance has been updated to address Integral End Bents, remove Semi-Deep abutments and address effects of skew.

Nominal Acquisition Payment (NAP)

1/28/20: Guidance in EPG 236.6.3.3 Waiver Valuation was revised to state that NAP forms are now to be approved by the Asst. to the State Design Engineer prior to use.

EPG 121.6 STIP Amendments

1/28/20: Guidance has been updated to reflect current practices.

New QRG

1/22/20: The new AWP MA Retroactively Updating Materials Conversion Factor QRG is now available in EPG 101 Standard Forms.

New QRG

1/17/20: The new AWP CM Test Equipment QRG is now available in EPG 101 Standard Forms.

Storm Water Permit Sign

1/17/20: This MoDNR stormwater permit sign has been updated in EPG 110.2 Additional Posters for Federal-Aid and State-Aid Projects.

Partial Depth Pavement Repairs

1/16/20: Guidance for the selection of different partial depth repairs has been clarified. Class A and Class B repair guidance was modified while new guidance for Class C repairs was added.

EPG 236.16.5.1 Application Process

1/15/20: Guidance was clarified.

EPG 751.50 Standard Detailing Notes K1.5.1 and K1.5.2

1/14/20: Note K1.5 is now split into two notes, one for use with major roads and one for minor roads.

New Scenic Byways Article

1/13/20: Guidance reflecting established practice is presented in the new article, EPG 236.18 Scenic Byways.

MoDOT's Storm Water Pollution Prevention Plan (SWPPP)

1/10/20: EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP) has been updated along with supporting guidance such as EPG 806.5 Site Inspections and BMP Repair to reflect the issuance of MoDOT's new State Operating Permit from DNR. Related new guidance includes EPG 237.2.8 Estimated Area of Disturbance and EPG 237.4.12 Erosion and Sediment Control Sheets.