Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.6.2.17)
m
(48 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
'''[[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]]'''
+
'''[[media:403 Guidance for Asphalt Cement Price Index Adjustments May 22 2020.docx|Guidance for Asphalt Cement Price Index Adjustments]], [[media:409 FY2021 Contract Seal Coat Guidelines b.docx|Contract Seal Coat Guidelines]] and [[media:409 FY May 21 2021 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]]'''
  
1/30/20: Excavation guidance has been updated to address Integral End Bents, remove Semi-Deep abutments and address effects of skew.  
+
5/21/20: In [[:Category:403 Asphaltic Concrete Pavement|EPG 403 Asphaltic Concrete Pavement]], [[:Category:409 Seal Coat|EPG 409 Seal Coat]], [[413.3 Ultrathin Bonded Asphalt Wearing Surface|EPG 413.3 Ultrathin Bonded Asphalt Wearing Surface]] and other articles, this document has been updated to include CMS signs for Seal Coat projects.  In EPG 409, the [[media:409 FY2021 Contract Seal Coat Guidelines b.docx|Contract Seal Coat Guidelines]] and [[media:409 FY May 21 2021 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]] were also updated for the CMS signs.
  
'''Nominal Acquisition Payment (NAP)'''
+
'''[[751.50 Standard Detailing Notes#Use for all LRFD bridge final designs initiated|LRFD Design Specifications Update]]'''  
  
1/28/20: Guidance in [[236.6 Appraisal and Appraisal Review#D. Nominal Acquisition Payment (NAP)|EPG 236.6.3.3 Waiver Valuation]] was revised to state that NAP forms are now to be approved by the Asst. to the State Design Engineer prior to use.
+
5/19/20: LRFD design specification notes were updated to reflect the required use of new or previous AASHTO releases.
  
'''[[121.6 STIP Amendments|EPG 121.6 STIP Amendments]]'''
+
'''New QRG'''
  
1/28/20: Guidance has been updated to reflect current practices.
+
5/15/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Payment_Estimate_Exception_Override.doc AWP CO Contract Payment Estimate Exception Override] is now available.
  
'''New QRG'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.2.2 Flags and Advance Warning Rail System on Signs|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
  
1/22/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Retroactively_Update_Materials_Conversion_Factor.docx AWP MA Retroactively Updating Materials Conversion Factor] QRG is now available in [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101 Standard Forms]].
+
5/15/20: Guidance has been updated because flags now shall be used on the ROAD/BRIDGE WORK AHEAD signs during short durations projects in daytime hours. Revised the photo of the sign and AWRS assemble without the flags.
  
'''New QRG'''  
+
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
  
1/17/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_CM_Test_Equipment.doc AWP CM Test Equipment] QRG is now available in [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101 Standard Forms]].  
+
5/12/20: Numerous notes, especially [[751.50 Standard Detailing Notes#H10. Barriers – Type A, B, C, D and H|H10 notes]], have been revised to apply to all barriers.
  
'''[[media:110.2 Storm Water Permit 2020.pdf|Storm Water Permit Sign]]'''
+
'''Accessible Pedestrian Signals'''  
  
1/17/20: This MoDNR stormwater permit sign has been updated in [[:Category:110 State and Federal Wage Rates and Other Requirements#Storm Water Permit|EPG 110.2 Additional Posters for Federal-Aid and State-Aid Projects]].
+
5/7/20: [[642.4 Impact of the Project Category on ADA|EPG 642.4 Impact of the Project Category on ADA]], [[902.4 Signal Installations and Equipment|EPG 902.4 Signal Installations and Equipment]] and [[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)#902.5.9 Provisions for Pedestrians (MUTCD Section 4D.03)|EPG 902.5.9 Provisions for Pedestrians]] were updated for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades.  This updated guidance also applies to new construction projects.
  
'''Partial Depth Pavement Repairs'''
+
'''[[413.1 Micro-Surfacing|EPG 413.1 Micro-Surfacing]]'''
  
1/16/20: Guidance for the selection of different partial depth repairs has been clarified. [[:Category:613 Pavement Repair#613.1.2 Class A Partial Depth Pavement Repairs (Sec 613.20)|Class A]] and [[:Category:613 Pavement Repair#613.1.3 Class B Partial Depth Pavement Repairs (Sec 613.30)|Class B]] repair guidance was modified while new guidance for [[:Category:613 Pavement Repair#613.1.4 Class C Partial Depth Pavement Repairs (Sec 613.35)|Class C]] repairs was added.
+
5/7/20: Guidance for single pass and double pass micro-surfacing was expanded. Guidance for micro-surfacing grade selection and surface preparation was also expanded. New guidance for post construction and the method of measurement and basis of payment is now available.  
  
'''[[236.16 Outdoor Advertising#The information provided|EPG 236.16.5.1 Application Process]]'''
+
'''RAI and RWPA System Requirements'''
  
1/15/20: Guidance was clarified.
+
5/1/20: Guidance for RAI and RWPA data entry and media upload requirements was clarified or added in [[236.3 Administration|EPG 236.3 Administration]], [[236.5 Property Management|EPG 236.5 Property Management]], [[236.6 Appraisal and Appraisal Review#236.6.1.1 Appraisal Reports Required|EPG 236.6.1.1 Appraisal Reports Required]], [[236.7 Negotiation|EPG 236.7 Negotiation]] and [[236.10 Right Of Way Condemnation#236.10.7.11 RWPA System Requirements for Condemnations|EPG 236.10.7.11 RWPA System Requirements for Condemnations]].
  
'''[[751.50 Standard Detailing Notes#(K1.5.1)|EPG 751.50 Standard Detailing Notes K1.5.1 and K1.5.2]]'''
+
'''[[751.10 General Superstructure#751.10.1.14 Girder Haunch Reinforcement|EPG 751.10.1.14 Girder Haunch Reinforcement]] and [[751.22 P/S Concrete I Girders#751.22.3.6.1 Reinforcing Steel Details|EPG 751.22.3.6.1 Reinforcing Steel Details]]'''
  
1/14/20: Note K1.5 is now split into two notes, one for use with major roads and one for minor roads.  
+
4/30/20: Guidance about hairpin bar and projecting girder reinforcement height adjustment requirements for P/S girder excessive haunch has been clarified.  The [[751.50 Standard Detailing Notes#Place notes H2c6.10 thru H2c6.14|Standard Detailing Note H2c6.10]] was also revised to reflect this clarification.  
  
'''New Scenic Byways Article
+
'''[[:Category:108 Prosecution and Progress#Professional Service Contract Labor|EPG 108.1.4, Professional Service Contract Labor]]'''
  
1/13/20: Guidance reflecting established practice is presented in the new article, [[236.18 Scenic Byways|EPG 236.18 Scenic Byways]].
+
4/28/20: New guidance is now available for the relatively rare occurrence of professional service contract labor.
  
'''MoDOT's Storm Water Pollution Prevention Plan (SWPPP)'''
+
'''[[237.8 Contract Time#Contract Administrative Costs|EPG 237.8.2 Liquidation Damages]]'''
  
1/10/20: [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]] has been updated along with supporting guidance such as [[806.5 Site Inspections and BMP Repair|EPG 806.5 Site Inspections and BMP Repair]] to reflect the issuance of MoDOT's new State Operating Permit from DNR. Related new guidance includes [[237.2 Title Sheet#237.2.8 Estimated Area of Disturbance|EPG 237.2.8 Estimated Area of Disturbance]] and [[237.4 Plan-Profile Sheets#237.4.12 Erosion and Sediment Control Sheets|EPG 237.4.12 Erosion and Sediment Control Sheets]].
+
4/27/20: The "Contract Administrative Costs" table has been updated.
  
'''Use of Hyphens in Structural Detailing'''
+
'''New QRG'''
  
1/7/20: Guidance in [[751.5 Structural Detailing Guidelines#When dimensions and quantities|EPG 751.5.1.3.4 Plurality]] and [[751.5 Structural Detailing Guidelines#751.5.1.3.6 Punctuation|EPG 751.5.1.3.6 Punctuation]] was updated for the uniform use of hyphens.
+
11/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_CO_DailyWorkReport_Deleting_Postings_and_Acceptance_Records.doc AWP CO Daily Work Report, Deleting DWR Postings and Acceptance Records QRG] is now available.  
  
'''[[751.35 Concrete Pile Cap Integral End Bents#(d)|EPG 751.35.4.3 Wing Reinforcement]]'''
+
'''[[236.17 Junkyards|EPG 236.17 Junkyards]]'''
  
12/19/19: H bar development lengths in end bent wings were slightly modified for rounding and for large skews.
+
4/22/20: Guidance has been clarified and updated.
  
'''[[:Category:409 Seal Coat#409.2.8 Method of Measurement|EPG 409.2.8 Method of Measurement]]'''
+
'''[[:Category:134 Engineering Professional Services|EPG 134 Engineering Professional Services]]'''
  
12/19/19: This new guidance clarifies the method of measurement for seal coat.
+
4/17/20: The process for consultant agreements has been streamlined and other guidance has been clarified.
  
'''[[236.3 Administration#236.3.12 Consultant Right of Way Acquisition and Relocation Services (RWRS)|EPG 236.3.12 Consultant Right of Way Acquisition and Relocation Services (RWRS)]]'''
+
'''Reinforcement of Concrete Pile Cap Intermediate Bents and Concrete Pile Cap Integral End Bents'''
  
12/19/19: This new guidance documents the established practice of initiating consultant right of way acquisition and relocations services.
+
4/17/20: Guidance was clarified about additional flexure reinforcement requirements between piles for pile cap intermediate bents and integral end bents and skin reinforcement spacing requirements.  This guidance was updated primarily in [[751.32 Concrete Pile Cap Intermediate Bents#751.32.4.1 Typical Pile Cap Bent|EPG 751.32.4.1 Typical Pile Cap Bent and EPG 751.32.4.2 Encased Pile Cap Bent]] as well as [[751.35 Concrete Pile Cap Integral End Bents#751.35.4.1 Wide Flange Beams & Plate Girders|EPG 751.35.4.1 Wide Flange Beams & Plate Girders and EPG 751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders]].
  
'''[[103.1 Bid Opening and Award Process#103.1.2.1 Emergency Work Procurement Process|EPG 103.1.2.1 Emergency Work Procurement Process]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations|EPG 616.6.87 Temporary Rumble Strips]]'''
  
12/18/19: New Emergency Work Procurement Process guidance reflecting established practice is now available.
+
4/14/20: In Figures 616.6.87.1 and 616.6.87.2, the short-term Rumble Strip Placement spacing was updated.  For speed limits from 50-55 mph, the spacing is now 20 feet.  For speed limits from 60-70 mph, the spacing is now 35 feet.
  
'''[[LPA:136.4 Consultant Selection and Consultant Contract Management#A consulting engineering firm|EPG 136.4.1.6 Conflict of Interest]]'''
+
'''Bluebeam Revu'''
  
12/16/19: Clarified guidance by adding information pertaining to when a consultant acts as a city engineer.  
+
4/10/20: In [[:Category:239 Construction Inspection Guidelines for Final Plans|EPG 239 Construction Inspection Guidelines for Final Plans]], district construction staff can now easily access vital Bluebeam Revu resources to prepare final as-built plans. These resources include [[media:239 Creating Digital IDs in Bluebeam Revu.pdf|Creating Digital IDs in Bluebeam Revu]], [[media:239 Preparing As-Built Plans.pdf|Preparing As-Built (Final) Plans in Construction Using Bluebeam Revu]], [[media:239 Revu 2015 Training Manual.pdf|Bluebeam Revu Training Manual (2015)]] and [[media:239 Where to Save Stamps.pdf|Where to Save Stamps]].
  
'''[[237.14 Electronic Design Data Delivery|EPG 237.14 Electronic Design Data Delivery]]'''
+
'''Fracture Critical Member (FCM) Notes'''
  
12/13/19: Guidance has been updated to reflect the use of the latest design software version.
+
4/720: Fracture Critical Member (FCM) notes have been revised and moved from [https://epg.modot.org/index.php/751.5_Structural_Detailing_Guidelines#751.5.9.3.3_Fracture_Control_Plan_.28FCP.29 EPG 751.5.9.3.3] to [https://epg.modot.org/index.php/751.50_Standard_Detailing_Notes#A5._Miscellaneous EPG 751.50 A5.1] and [[751.50 Standard Detailing Notes#(H1.23)|EPG 751.50 H1.23]].
  
'''[[media:Form 806.8.2 dec 2019.pdf|Form 806.8.2, Project-Specific SWPPP Information]]'''  
+
'''[[127.29 Storm Water#127.29.8 MCM 6: Pollution Prevention/Good Housekeeping|EPG 127.29.8 MCM 6: Pollution Prevention/Good Housekeeping]]'''
  
12/13/19: This form (presented in [http://epg.modot.org/index.php/806.8_Storm_Water_Pollution_Prevention_Plan_(SWPPP)#806.8.1_Introduction_to_the_Storm_Water_Permit_and_Storm_Water_Polution_Prevention_Plan_.28SWPPP.29 EPG 806.8] and [http://epg.modot.org/index.php/Category:101_Standard_Forms#Design_Forms EPG 101]) now has a new page for REs/Inspectors to identify the BMPs that will be used on a project.
+
4/7/20: The guidance for the Facility Runoff Control Plan form has been expanded.
  
'''[[237.14 Electronic Design Data Delivery#237.14.1 MoDOT and Consultant Electronic Design Data Requirements|EPG 237.14.1 MoDOT and Consultant Electronic Design Data Requirements]]'''
+
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
  
12/12/19: Electronic Design Data guidance was clarified.
+
4/6/20: Guidance was clarified and updated to current practice. Vegetation policies were updated to match traffic policies for work on right of way.
  
'''[[751.6 General Quantities#751.6.2.5 Concrete|EPG 751.6.2.5 Concrete]]'''
+
'''[[:Category:113 Construction Inspection Guidance for Contractor's Claims|EPG 113 Construction Inspection Guidance for Contractor's Claims]]'''
  
12/3/19: Guidance about rounding of concrete quantities for superstructure was clarified. Guidance was added to subtract concrete displaced by CIP piles.
+
4/2/20: The procedures for handling contractor claims has been updated.
  
'''Reinforcement Details'''
+
'''[[903.9 General Information Signs#903.9.9 City/County Limit Signs (I4, I5, I6 Series)|EPG 903.9.9 City/County Limit Signs (I4, I5, I6 Series)]]'''
  
12/2/19: Reinforcement details were updated in [[751.9 LFD Seismic#751.9.3.1.7 T- Joint Connections|EPG 751.9.3.1.7 T-Joint Connections]], [[751.31 Open Concrete Intermediate Bents#751.31.1.2 Rigid Frame- No Tie or Web Beam|EPG 751.31.1 and EPG 751.31.3]] and [[751.32 Concrete Pile Cap Intermediate Bents#751.32.4 Reinforcement|EPG 751.32.4 Reinforcement]] to be in accordance with new epoxy coated guidelines and with new development and splice length requirements. Alternate end bent reinforcement details for shallow structures were added in [[751.35 Concrete Pile Cap Integral End Bents#751.35.3.3 Prestressed Girder End Bent|EPG 751.35.3.3 through EPG 751.35.4.4]].      
+
4/1/20: Guidance was clarified for where inadequate space exists to install a city limits sign at the standard location.
  
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[153.8 Design#DE62|Design Division eAgreement Contracts]]'''
  
11/21/19: Guidance about underlined portions of notes was added.
+
3/31/20: New guidance is available for DE62 Stream Wetland Credit Purchase Agreement and DE66 TCF Bat Habitat Credit Purchase Agreement.
  
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)#When a DBE manufacturer|EPG 146.3.2.3 Commercially Useful Function (CUF)]]'''
+
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Course (CLC)]] and [[:Category:409 Seal Coat|Seal Coat]]'''  
  
11/19/19: The location for storing CUF documents was updated from the archaic V: drive to eProjects.
+
3/25/20: The Contract Leveling Course and Seal Coat guidelines, as well as their pdf files, were updated.  
  
'''[[751.11 Bearings#Taper|EPG 751.11.2.1 Elastomeric Bearings Taper]]'''
+
'''[[147.4 Fixed Price Variable Scope (FPVS) Contracting|EPG 147.4 Fixed Price Variable Scope Contracting]]'''
  
11/14/19: The illustrations have been revised to clarify the maximum allowed taper.
+
3/25/20: This new article provides guidance for the new contracting method, FPVS Contracting.

Revision as of 09:55, 22 May 2020

Guidance for Asphalt Cement Price Index Adjustments, Contract Seal Coat Guidelines and Contract Seal Coat pdf Plan Sheets

5/21/20: In EPG 403 Asphaltic Concrete Pavement, EPG 409 Seal Coat, EPG 413.3 Ultrathin Bonded Asphalt Wearing Surface and other articles, this document has been updated to include CMS signs for Seal Coat projects. In EPG 409, the Contract Seal Coat Guidelines and Contract Seal Coat pdf Plan Sheets were also updated for the CMS signs.

LRFD Design Specifications Update

5/19/20: LRFD design specification notes were updated to reflect the required use of new or previous AASHTO releases.

New QRG

5/15/20: The new AWP CO Contract Payment Estimate Exception Override is now available.

EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs

5/15/20: Guidance has been updated because flags now shall be used on the ROAD/BRIDGE WORK AHEAD signs during short durations projects in daytime hours. Revised the photo of the sign and AWRS assemble without the flags.

EPG 751.50 Standard Detailing Notes

5/12/20: Numerous notes, especially H10 notes, have been revised to apply to all barriers.

Accessible Pedestrian Signals

5/7/20: EPG 642.4 Impact of the Project Category on ADA, EPG 902.4 Signal Installations and Equipment and EPG 902.5.9 Provisions for Pedestrians were updated for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This updated guidance also applies to new construction projects.

EPG 413.1 Micro-Surfacing

5/7/20: Guidance for single pass and double pass micro-surfacing was expanded. Guidance for micro-surfacing grade selection and surface preparation was also expanded. New guidance for post construction and the method of measurement and basis of payment is now available.

RAI and RWPA System Requirements

5/1/20: Guidance for RAI and RWPA data entry and media upload requirements was clarified or added in EPG 236.3 Administration, EPG 236.5 Property Management, EPG 236.6.1.1 Appraisal Reports Required, EPG 236.7 Negotiation and EPG 236.10.7.11 RWPA System Requirements for Condemnations.

EPG 751.10.1.14 Girder Haunch Reinforcement and EPG 751.22.3.6.1 Reinforcing Steel Details

4/30/20: Guidance about hairpin bar and projecting girder reinforcement height adjustment requirements for P/S girder excessive haunch has been clarified. The Standard Detailing Note H2c6.10 was also revised to reflect this clarification.

EPG 108.1.4, Professional Service Contract Labor

4/28/20: New guidance is now available for the relatively rare occurrence of professional service contract labor.

EPG 237.8.2 Liquidation Damages

4/27/20: The "Contract Administrative Costs" table has been updated.

New QRG

11/14/19: The new AWP CO Daily Work Report, Deleting DWR Postings and Acceptance Records QRG is now available.

EPG 236.17 Junkyards

4/22/20: Guidance has been clarified and updated.

EPG 134 Engineering Professional Services

4/17/20: The process for consultant agreements has been streamlined and other guidance has been clarified.

Reinforcement of Concrete Pile Cap Intermediate Bents and Concrete Pile Cap Integral End Bents

4/17/20: Guidance was clarified about additional flexure reinforcement requirements between piles for pile cap intermediate bents and integral end bents and skin reinforcement spacing requirements. This guidance was updated primarily in EPG 751.32.4.1 Typical Pile Cap Bent and EPG 751.32.4.2 Encased Pile Cap Bent as well as EPG 751.35.4.1 Wide Flange Beams & Plate Girders and EPG 751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders.

EPG 616.6.87 Temporary Rumble Strips

4/14/20: In Figures 616.6.87.1 and 616.6.87.2, the short-term Rumble Strip Placement spacing was updated. For speed limits from 50-55 mph, the spacing is now 20 feet. For speed limits from 60-70 mph, the spacing is now 35 feet.

Bluebeam Revu

4/10/20: In EPG 239 Construction Inspection Guidelines for Final Plans, district construction staff can now easily access vital Bluebeam Revu resources to prepare final as-built plans. These resources include Creating Digital IDs in Bluebeam Revu, Preparing As-Built (Final) Plans in Construction Using Bluebeam Revu, Bluebeam Revu Training Manual (2015) and Where to Save Stamps.

Fracture Critical Member (FCM) Notes

4/720: Fracture Critical Member (FCM) notes have been revised and moved from EPG 751.5.9.3.3 to EPG 751.50 A5.1 and EPG 751.50 H1.23.

EPG 127.29.8 MCM 6: Pollution Prevention/Good Housekeeping

4/7/20: The guidance for the Facility Runoff Control Plan form has been expanded.

EPG 236.16 Outdoor Advertising

4/6/20: Guidance was clarified and updated to current practice. Vegetation policies were updated to match traffic policies for work on right of way.

EPG 113 Construction Inspection Guidance for Contractor's Claims

4/2/20: The procedures for handling contractor claims has been updated.

EPG 903.9.9 City/County Limit Signs (I4, I5, I6 Series)

4/1/20: Guidance was clarified for where inadequate space exists to install a city limits sign at the standard location.

Design Division eAgreement Contracts

3/31/20: New guidance is available for DE62 Stream Wetland Credit Purchase Agreement and DE66 TCF Bat Habitat Credit Purchase Agreement.

Contract Leveling Course (CLC) and Seal Coat

3/25/20: The Contract Leveling Course and Seal Coat guidelines, as well as their pdf files, were updated.

EPG 147.4 Fixed Price Variable Scope Contracting

3/25/20: This new article provides guidance for the new contracting method, FPVS Contracting.