Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 106.20)
m (EPG 1048.2.7)
(35 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
'''[[106.20 Reporting#106.20.6 Material Transfer Reports|EPG 106.20.6 Material Transfer Reports]]'''
+
'''[[:Category:1048 Pavement Marking Material#1048.2.7.3 Acceptance|EPG 1048.2.7.3 Acceptance]]'''
  
7/14/20: Guidance was updated to reflect the change to AASHTOWare Project (AWP) from Sitemanager and further clarify the Material Transfer process.
+
10/22/20: Guidance has been updated to reflect the current process for how acrylic waterborne and high build acrylic waterborne traffic marking are accepted.
  
'''New QRG'''
+
'''Minimum Wall Thickness for CIP Piles and Limited Nominal Axial Resistance of CIP Piles Embedded and Tipped in Cohesionless Soils'''
  
7/10/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_Changing_Material_Code_Source_or_SampleType.docx AWP MA Sample Record Changing Material Code Source or Sample Type] is now available in [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101 Standard Forms, AASHTOWare Project Quick Reference Guides (QRGs)]].
+
10/19/20: Guidance in [[751.36 Driven Piles|EPG 751.36 Driven Piles]] (particularly in [[751.36 Driven Piles#751.36.2.2.2 Cast-In-Place (CIP) Pile|EPG 751.36.2.2.2 Cast-In-Place (CIP) Pile]], [[751.36 Driven Piles#751.36.5.7.1 Design Values for Individual HP Pile|EPG 751.36.5.7.1 Design Values for Individual HP Pile]], and [[751.36 Driven Piles#751.36.5.10 Pile Nominal Axial Compressive Resistance|EPG 751.36.5.10 Pile Nominal Axial Compressive Resistance]]) was updated to implement maximum axial loads in sands and clarified minimum nominal wall thickness requirements for CIP pile. Numerous standard detailing notes in [[751.50 Standard Detailing Notes#G. Substructure Notes|EPG 751.50, G. Substructure Notes]] for hooks of vertical bar requirements for column and CIP piles were also clarified.
  
'''[[902.19 Construction Inspection Guidelines for Sec 902#Signal Maintenance|EPG 902.19 Construction Inspection Guidelines for Sec 902]]
+
'''[[236.7 Negotiation#236.7.4.4 Agreement for Purchase of Real Estate|EPG 236.7.4.4 Agreement for Purchase of Real Estate, When Agreement for Purchase of Real Estate is Used]]'''
  
7/10/20: New signal maintenance guidance provides more details on the intent of Sec 902.2 and helps ensure consistent administration of contract signal work.
+
10/9/20: To reflect legal requirements, Tax Lien guidance was added.  
  
'''[[153.15 Maintenance|EPG 153.15 Maintenance]]'''
+
'''[[:Category:108 Prosecution and Progress#108.16 Project Dates|EPG 108.16 Project Dates]]'''
  
7/2/20: The signature requirements for 7 contracts were updated. Several archaic contracts were deleted.
+
9/30/20: EPG 108.16 has been rewritten to reflect the move to AWP.
  
'''Electronically Signed and Sealed Plan Sheets for Consultant Designed Projects'''
+
'''[[751.50 Standard Detailing Notes#(J1.21a)|Updated Standard Detailing Note]]'''
  
7/2/20: Guidance in [[237.9 Submission of Plans and Supporting Documents#If choosing to electronically sign|EPG 237.9.6 Consultant Designed Projects]] was updated to show the new security requirements associated with the upgrade of ProjectWise to Version 10.
+
9/28/20: Dowel requirements for inverted U-shape precast coping for large block (panel) MSE walls in Standard Note J1.21a were clarified.  
  
'''[[:Category:903 Highway Signing|EPG 903 Highway Signing]]'''
+
'''[[751.50 Standard Detailing Notes#(H7.8.2) Use note|New Standard Detailing Note]]'''
  
7/2/20: A large number of updates to current practices, including new guidance for consumable inventory and operational updates, are now available in [[:Category:903 Highway Signing|EPG 903 Highway Signing]], [[903.2 Extent of Signing|EPG 903.2 Extent of Signing]] and the newly re-titled [[903.3 Ground-Mounted Sign Supports|EPG 903.3 Ground-Mounted Sign Supports]] (formerly EPG 903.3 Post-Mounted Signing).
+
9/23/20: New Note H7.8.2 is available when requiring epoxy-mastic primer coating on galvanized drain support brackets that come in contact with weathering steel beams/girders.
  
'''[[153.14 Information Systems|EPG 153.14 Information Systems]]'''
+
'''[[237.5 Special Provisions|EPG 237.5 Special Provisions]]'''
  
7/1/20: The signature requirements for these agreements have been updated.
+
9/22/20: Guidance has been clarified and updated to current practice.
  
'''[[153.13 Human Resources|EPG 153.13 Human Resources]]'''
+
'''[[127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities|EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities]]'''
  
7/1/20: The signature requirements for HR04 and HR05 have been updated and clarified.
+
9/16/20: Guidance has been updated to reflect current practice.
  
'''[[153.12 Highway Safety|EPG 153.12 Highway Safety]]'''
+
'''[[751.36 Driven Piles#751.36.5.8 Additional Provisions for Pile Cap Footings|EPG 751.36.5.8 Additional Provisions for Pile Cap Footings]]'''
  
7/1/20: The drafting, review and signature requirements for these contracts have been updated and clarified.
+
9/16/20: Guidance has been updated to clarify pile uplift design requirements for pile cap footing and to implement DSB-16-02 requirements.
  
'''[[:Category:134 Engineering Professional Services#134.3.2 Fixed Fee Review|EPG 134.3.2 Fixed Fee Review]]'''
+
'''[[:Category:203 Roadway and Drainage Excavation, Embankment and Compaction#203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)|EPG 203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)]]'''
  
6/25/20: Clarified guidance about fixed fees and the on-call master agreements.
+
9/16/20: Contractor-furnished borrow guidance has been updated to current practice.
  
'''[[:Category:134 Engineering Professional Services#Consultant invoices for projects|EPG 134.5.1 Invoicing]]'''
+
'''[[127.2 Historic Preservation and Cultural Resources|EPG 127.2 Historic Preservation and Cultural Resources]]'''
  
6/24/20: Additional contact guidance is now available.
+
9/11/20: Guidance has been updated to reflect changes in the Section 106 processes that have incrementally occurred over the last few years.
  
'''[[153.18 Multimodal|EPG 153.18 Multimodal]]'''
+
'''[[147.3 Job Order Contracting (JOC)#147.3.11 Request to Subcontract Work (Form C-220)|EPG 147.3.11 Request to Subcontract Work (Form C-220)]]'''
  
6/23/20: A new eAgreement, MO21 Coronavirus Aid Relief and Economic Security Act Agreement, has been added to the listings.  
+
9/2/20: This new guidance provides clarification for the process.
  
'''[[media: 703.2.12 PODI Bridge Deck Pour Checklist.pdf|PODI Bridge Deck Pour Checklist]]'''
+
'''[[:Category:109 Measurement and Payment#Erosion Control Change Orders|EPG 109.12 Change Orders, Non-major change orders (Change Order level 2)]]'''
  
6/23/20: The new, FHWA-based "PODI Bridfe Deck Pour Checklist" fillable form replaces the former textual guidance of [[:Category:703 Concrete Masonry Construction#703.2.12 Checklist|EPG 703.2.12 Checklist]].  The form is also available in [[:Category:101 Standard Forms#Construction and Materials|EPG 101 Standard Forms, Construction and Materials]].
+
8/20/20: Guidance has been updated to current Environmental Change Orders instructions.
  
'''[[:Category:105 Control of Work#105.9.14 Project Diaries|EPG 105.9.14 Project Diaries]]'''
+
'''Bolt Specs and Welding Inspection'''
  
6/19/20: Guidance has been updated to current AASHTOWARE procedures.
+
8/18/20: Bolt specs have been corrected to the latest ASTM and welding inspection procedures have been clarified in numerous articles including  [[:Category:712 Structural Steel Construction#712.1.5 High Strength Bolts (Sec 712.7)|EPG 712.1.5 High Strength Bolts]], [[751.14 Steel Superstructure|EPG 751.14 Steel Superstructure]] and [[751.50 Standard Detailing Notes#H3f. Pot Bearing Pad Assembly|EPG 751.50, H3f. Pot Bearing Pad Assembly]] and new guidance in [[:Category:1080 Structural Steel Fabrication#1080.2 Fabrication Inspection Shipment Release (FISR)|EPG 1080.2 Fabrication Inspection Shipment Releases (FISRs)]].
  
'''[[237.9 Submission of Plans and Supporting Documents#237.9.3.6 Finalizing the PS&E for Advertisement|EPG 237.9.3.6 Finalizing the PS&E for Advertisement]] and [[237.9 Submission of Plans and Supporting Documents#237.9.3.7 Posting Projects for Advertisement|EPG 237.9.3.7 Posting Projects for Advertisement]]'''
+
'''[[153.5 Bridge|EPG 153.5 Bridge]]'''
  
6/18/20: Guidance has been updated since proposals are not advertised anymore.  The proposal is now split into a Bid Book, Roadway JSPs, and Bridge JSPs and each is advertised.   
+
8/13/20: The list of agreements were revised to include a column with applicable MHTC policiesArchaic contracts were deleted.
  
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)#When a DBE is a prime|EPG 146.3.1 DBE Subcontract – Performing Work Onsite]]'''
+
'''[[127.9 Floodplain Management#127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification|EPG 127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification]]'''
  
6/17/20: New guidance clarified that when a DBE is a prime contractor, a CUF should be performed on the DBE firm as well as any other DBE firms being utilized. The CUF review should be conducted on the prime DBE every 60 days until the project is completed.  
+
8/13/20: Brief, new guidance has been added to make CFR requirements more apparent.
  
'''New QRG'''
+
'''[[153.7 Customer Relations|EPG 153.7 Customer Relations]] and [[153.22 Utility|EPG 153.22 Utility]]'''
  
6/11/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_IAS_Lab_Audit.doc AWP MA I.A.S. Lab Audit] is now available.
+
8/12/20: The signature requirements for contracts have been updated.
  
'''[[751.12 Barriers, Curbs and Fences|EPG 751.12 Barriers, Curbs and Fences]]'''
+
'''[[236.16 Outdoor Advertising#Digital Upgrade Request|EPG 236.16.12 Digital Sign Upgrade Process]]'''
  
6/9/20: EPG 751.12 Protective Barriers was retitled EPG 751.12 Barriers, Curbs and Fences. Most of the article's contents was updated with guidance for new Type H barrierType D barrier is now the standard barrier for most bridges.
+
8/12/20: Guidance for the request process was clarifiedOwners were informed that the request may be denied if they do not provide the necessary documentation.
  
'''[[153.21 Transportation Planning|EPG 153.21 Transportation Planning]]'''  
+
'''[[:Category:503 Bridge Approach Slabs#Bridge Approach Slab (Minor Road) Sub-class Requirements|EPG 503.2 New and Replacement Bridges on Minor Roads]]'''
  
6/5/20: New eAgreement, TP06 Planning Consolidated Grant and Surface Transportation Block Grant Program Agreement, has been added to the listings.  
+
8/7/20: Guidance was updated to reflect current practice concerning asphalt type. Asphalt designation for minor roads is now shown on roadway plans.
  
'''[[:Category:174 Maintenance Management System (MMS)|EPG 174 Maintenance Management System (MMS)]]'''
+
'''[[236.14 Change in Route Status Report#236.14.8 Change in Route Marking|EPG 236.14.8 Change in Route Marking]]'''
  
6/2/20: This new article is a high-level introduction to MMS and provides users with access to the web-based program.
+
8/3/20: Guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.  
  
'''[[media:403 Guidance for Asphalt Cement Price Index Adjustments May 22 2020.docx|Guidance for Asphalt Cement Price Index Adjustments]], [[media:409 FY2021 Contract Seal Coat Guidelines b.docx|Contract Seal Coat Guidelines]] and [[media:409 FY May 21 2021 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]]'''
+
'''[[153.18 Multimodal|EPG 153.18 Multimodal]]'''
  
5/21/20: In [[:Category:403 Asphaltic Concrete Pavement|EPG 403 Asphaltic Concrete Pavement]], [[:Category:409 Seal Coat|EPG 409 Seal Coat]], [[413.3 Ultrathin Bonded Asphalt Wearing Surface|EPG 413.3 Ultrathin Bonded Asphalt Wearing Surface]] and other articles, this document has been updated to include CMS signs for Seal Coat projects.  In EPG 409, the [[media:409 FY2021 Contract Seal Coat Guidelines b.docx|Contract Seal Coat Guidelines]] and [[media:409 FY May 21 2021 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]] were also updated for the CMS signs.
+
8/3/20: The signature requirements for contracts have been updated.
  
'''[[751.50 Standard Detailing Notes#Use for all LRFD bridge final designs initiated|LRFD Design Specifications Update]]'''  
+
'''[[153.16 Medical Board Employee Benefits|EPG 153.16 Medical Board Employee Benefits]]'''
  
5/19/20: LRFD design specification notes were updated to reflect the required use of new or previous AASHTO releases.
+
7/31/20: The signature requirements for 3 contracts have been updated.
  
'''New QRG'''
+
'''[[236.6 Appraisal and Appraisal Review#Duration of Approval of Fee Appraisers on the Roster of Approved Appraisers/Reviewers|EPG 236.6.5.3, Duration of Approval of Fee Appraisers on the Roster of Approved Appraisers/Reviewers]]'''
  
5/15/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Payment_Estimate_Exception_Override.doc AWP CO Contract Payment Estimate Exception Override] is now available.
+
7/30/20: Guidance about the renewal application process has been clarified.
  
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.2.2 Flags and Advance Warning Rail System on Signs|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
+
'''[[903.5 Regulatory Signs#903.5.21 WRONG WAY Sign (R5-1a) (MUTCD Section 2B.38)|EPG 903.5.21 WRONG WAY Sign (R5-1a)]]'''
  
5/15/20: Guidance has been updated because flags now shall be used on the ROAD/BRIDGE WORK AHEAD signs during short durations projects in daytime hours. Revised the photo of the sign and AWRS assemble without the flags.
+
7/30/20: Fig. 903.5.21.1, Example of Application of Regulatory Signing and Pavement Markings at an Exit Ramp Termination to Deter Wrong-Way Entry, was updated to reflect current practice.
  
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[237.4 Plan-Profile Sheets#237.4.8 Reference Point Sheet|EPG 237.4.8 Reference Point Sheet]] and [[237.4 Plan-Profile Sheets#237.4.9 Coordinate Point Sheet|EPG 237.4.9 Coordinate Point Sheet]]'''
  
5/12/20: Numerous notes, especially [[751.50 Standard Detailing Notes#H10. Barriers – Type A, B, C, D and H|H10 notes]], have been revised to apply to all barriers.
+
7/29/20: It is now permissible to not show the State Plane Coordinates on the Coordinate Point Sheet and the Reference Point Sheet.

Revision as of 15:17, 22 October 2020

EPG 1048.2.7.3 Acceptance

10/22/20: Guidance has been updated to reflect the current process for how acrylic waterborne and high build acrylic waterborne traffic marking are accepted.

Minimum Wall Thickness for CIP Piles and Limited Nominal Axial Resistance of CIP Piles Embedded and Tipped in Cohesionless Soils

10/19/20: Guidance in EPG 751.36 Driven Piles (particularly in EPG 751.36.2.2.2 Cast-In-Place (CIP) Pile, EPG 751.36.5.7.1 Design Values for Individual HP Pile, and EPG 751.36.5.10 Pile Nominal Axial Compressive Resistance) was updated to implement maximum axial loads in sands and clarified minimum nominal wall thickness requirements for CIP pile. Numerous standard detailing notes in EPG 751.50, G. Substructure Notes for hooks of vertical bar requirements for column and CIP piles were also clarified.

EPG 236.7.4.4 Agreement for Purchase of Real Estate, When Agreement for Purchase of Real Estate is Used

10/9/20: To reflect legal requirements, Tax Lien guidance was added.

EPG 108.16 Project Dates

9/30/20: EPG 108.16 has been rewritten to reflect the move to AWP.

Updated Standard Detailing Note

9/28/20: Dowel requirements for inverted U-shape precast coping for large block (panel) MSE walls in Standard Note J1.21a were clarified.

New Standard Detailing Note

9/23/20: New Note H7.8.2 is available when requiring epoxy-mastic primer coating on galvanized drain support brackets that come in contact with weathering steel beams/girders.

EPG 237.5 Special Provisions

9/22/20: Guidance has been clarified and updated to current practice.

EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities

9/16/20: Guidance has been updated to reflect current practice.

EPG 751.36.5.8 Additional Provisions for Pile Cap Footings

9/16/20: Guidance has been updated to clarify pile uplift design requirements for pile cap footing and to implement DSB-16-02 requirements.

EPG 203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)

9/16/20: Contractor-furnished borrow guidance has been updated to current practice.

EPG 127.2 Historic Preservation and Cultural Resources

9/11/20: Guidance has been updated to reflect changes in the Section 106 processes that have incrementally occurred over the last few years.

EPG 147.3.11 Request to Subcontract Work (Form C-220)

9/2/20: This new guidance provides clarification for the process.

EPG 109.12 Change Orders, Non-major change orders (Change Order level 2)

8/20/20: Guidance has been updated to current Environmental Change Orders instructions.

Bolt Specs and Welding Inspection

8/18/20: Bolt specs have been corrected to the latest ASTM and welding inspection procedures have been clarified in numerous articles including EPG 712.1.5 High Strength Bolts, EPG 751.14 Steel Superstructure and EPG 751.50, H3f. Pot Bearing Pad Assembly and new guidance in EPG 1080.2 Fabrication Inspection Shipment Releases (FISRs).

EPG 153.5 Bridge

8/13/20: The list of agreements were revised to include a column with applicable MHTC policies. Archaic contracts were deleted.

EPG 127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification

8/13/20: Brief, new guidance has been added to make CFR requirements more apparent.

EPG 153.7 Customer Relations and EPG 153.22 Utility

8/12/20: The signature requirements for contracts have been updated.

EPG 236.16.12 Digital Sign Upgrade Process

8/12/20: Guidance for the request process was clarified. Owners were informed that the request may be denied if they do not provide the necessary documentation.

EPG 503.2 New and Replacement Bridges on Minor Roads

8/7/20: Guidance was updated to reflect current practice concerning asphalt type. Asphalt designation for minor roads is now shown on roadway plans.

EPG 236.14.8 Change in Route Marking

8/3/20: Guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.

EPG 153.18 Multimodal

8/3/20: The signature requirements for contracts have been updated.

EPG 153.16 Medical Board Employee Benefits

7/31/20: The signature requirements for 3 contracts have been updated.

EPG 236.6.5.3, Duration of Approval of Fee Appraisers on the Roster of Approved Appraisers/Reviewers

7/30/20: Guidance about the renewal application process has been clarified.

EPG 903.5.21 WRONG WAY Sign (R5-1a)

7/30/20: Fig. 903.5.21.1, Example of Application of Regulatory Signing and Pavement Markings at an Exit Ramp Termination to Deter Wrong-Way Entry, was updated to reflect current practice.

EPG 237.4.8 Reference Point Sheet and EPG 237.4.9 Coordinate Point Sheet

7/29/20: It is now permissible to not show the State Plane Coordinates on the Coordinate Point Sheet and the Reference Point Sheet.