Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 153.15)
m (EPG 134.2.4)
(42 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
'''[[153.15 Maintenance|EPG 153.15 Maintenance]]'''
+
'''[[:Category:134 Engineering Professional Services#134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts|EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts]]'''
  
7/2/20: The signature requirements for 7 contracts were updated. Several archaic contracts were deleted,
+
10/28/20: On-call consultant guidance has been updated.
  
'''Electronically Signed and Sealed Plan Sheets for Consultant Designed Projects'''
+
'''[[237.8 Contract Time#237.8.2 Liquidated Damages|EPG 237.8.2 Liquidated Damages]]'''
  
7/2/20: Guidance in [[237.9 Submission of Plans and Supporting Documents#If choosing to electronically sign|EPG 237.9.6 Consultant Designed Projects]] was updated to show the new security requirements associated with the upgrade of ProjectWise to Version 10.
+
10/26/20: Guidance was clarified to provide justification for higher liquidated damages.
  
'''[[:Category:903 Highway Signing|EPG 903 Highway Signing]]'''
+
'''[[:Category:1048 Pavement Marking Material#1048.2.7.3 Acceptance|EPG 1048.2.7.3 Acceptance]]'''
  
7/2/20: A large number of updates to current practices, including new guidance for consumable inventory and operational updates, are now available in [[:Category:903 Highway Signing|EPG 903 Highway Signing]], [[903.2 Extent of Signing|EPG 903.2 Extent of Signing]] and the newly re-titled [[903.3 Ground-Mounted Sign Supports|EPG 903.3 Ground-Mounted Sign Supports]] (formerly EPG 903.3 Post-Mounted Signing).
+
10/22/20: Guidance has been updated to reflect the current process for how acrylic waterborne and high build acrylic waterborne traffic marking are accepted.
  
'''[[153.14 Information Systems|EPG 153.14 Information Systems]]'''
+
'''Minimum Wall Thickness for CIP Piles and Limited Nominal Axial Resistance of CIP Piles Embedded and Tipped in Cohesionless Soils'''
  
7/1/20: The signature requirements for these agreements have been updated.
+
10/19/20: Guidance in [[751.36 Driven Piles|EPG 751.36 Driven Piles]] (particularly in [[751.36 Driven Piles#751.36.2.2.2 Cast-In-Place (CIP) Pile|EPG 751.36.2.2.2 Cast-In-Place (CIP) Pile]], [[751.36 Driven Piles#751.36.5.7.1 Design Values for Individual HP Pile|EPG 751.36.5.7.1 Design Values for Individual HP Pile]], and [[751.36 Driven Piles#751.36.5.10 Pile Nominal Axial Compressive Resistance|EPG 751.36.5.10 Pile Nominal Axial Compressive Resistance]]) was updated to implement maximum axial loads in sands and clarified minimum nominal wall thickness requirements for CIP pile. Numerous standard detailing notes in [[751.50 Standard Detailing Notes#G. Substructure Notes|EPG 751.50, G. Substructure Notes]] for hooks of vertical bar requirements for column and CIP piles were also clarified.
  
'''[[153.13 Human Resources|EPG 153.13 Human Resources]]'''
+
'''[[236.7 Negotiation#236.7.4.4 Agreement for Purchase of Real Estate|EPG 236.7.4.4 Agreement for Purchase of Real Estate, When Agreement for Purchase of Real Estate is Used]]'''
  
7/1/20: The signature requirements for HR04 and HR05 have been updated and clarified.
+
10/9/20: To reflect legal requirements, Tax Lien guidance was added.  
  
'''[[153.12 Highway Safety|EPG 153.12 Highway Safety]]'''
+
'''[[:Category:108 Prosecution and Progress#108.16 Project Dates|EPG 108.16 Project Dates]]'''
  
7/1/20: The drafting, review and signature requirements for these contracts have been updated and clarified.
+
9/30/20: EPG 108.16 has been rewritten to reflect the move to AWP.
  
'''[[:Category:134 Engineering Professional Services#134.3.2 Fixed Fee Review|EPG 134.3.2 Fixed Fee Review]]'''
+
'''[[751.50 Standard Detailing Notes#(J1.21a)|Updated Standard Detailing Note]]'''
  
6/25/20: Clarified guidance about fixed fees and the on-call master agreements.
+
9/28/20: Dowel requirements for inverted U-shape precast coping for large block (panel) MSE walls in Standard Note J1.21a were clarified.  
  
'''[[:Category:134 Engineering Professional Services#Consultant invoices for projects|EPG 134.5.1 Invoicing]]'''
+
'''[[751.50 Standard Detailing Notes#(H7.8.2) Use note|New Standard Detailing Note]]'''
  
6/24/20: Additional contact guidance is now available.
+
9/23/20: New Note H7.8.2 is available when requiring epoxy-mastic primer coating on galvanized drain support brackets that come in contact with weathering steel beams/girders.
  
'''[[153.18 Multimodal|EPG 153.18 Multimodal]]'''
+
'''[[237.5 Special Provisions|EPG 237.5 Special Provisions]]'''
  
6/23/20: A new eAgreement, MO21 Coronavirus Aid Relief and Economic Security Act Agreement, has been added to the listings.  
+
9/22/20: Guidance has been clarified and updated to current practice.
  
'''[[media: 703.2.12 PODI Bridge Deck Pour Checklist.pdf|PODI Bridge Deck Pour Checklist]]'''
+
'''[[127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities|EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities]]'''
  
6/23/20: The new, FHWA-based "PODI Bridfe Deck Pour Checklist" fillable form replaces the former textual guidance of [[:Category:703 Concrete Masonry Construction#703.2.12 Checklist|EPG 703.2.12 Checklist]].  The form is also available in [[:Category:101 Standard Forms#Construction and Materials|EPG 101 Standard Forms, Construction and Materials]].
+
9/16/20: Guidance has been updated to reflect current practice.
  
'''[[:Category:105 Control of Work#105.9.14 Project Diaries|EPG 105.9.14 Project Diaries]]'''
+
'''[[751.36 Driven Piles#751.36.5.8 Additional Provisions for Pile Cap Footings|EPG 751.36.5.8 Additional Provisions for Pile Cap Footings]]'''
  
6/19/20: Guidance has been updated to current AASHTOWARE procedures.
+
9/16/20: Guidance has been updated to clarify pile uplift design requirements for pile cap footing and to implement DSB-16-02 requirements.
  
'''[[237.9 Submission of Plans and Supporting Documents#237.9.3.6 Finalizing the PS&E for Advertisement|EPG 237.9.3.6 Finalizing the PS&E for Advertisement]] and [[237.9 Submission of Plans and Supporting Documents#237.9.3.7 Posting Projects for Advertisement|EPG 237.9.3.7 Posting Projects for Advertisement]]'''
+
'''[[:Category:203 Roadway and Drainage Excavation, Embankment and Compaction#203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)|EPG 203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)]]'''
  
6/18/20: Guidance has been updated since proposals are not advertised anymore. The proposal is now split into a Bid Book, Roadway JSPs, and Bridge JSPs and each is advertised. 
+
9/16/20: Contractor-furnished borrow guidance has been updated to current practice.
  
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)#When a DBE is a prime|EPG 146.3.1 DBE Subcontract – Performing Work Onsite]]'''
+
'''[[127.2 Historic Preservation and Cultural Resources|EPG 127.2 Historic Preservation and Cultural Resources]]'''
  
6/17/20: New guidance clarified that when a DBE is a prime contractor, a CUF should be performed on the DBE firm as well as any other DBE firms being utilized. The CUF review should be conducted on the prime DBE every 60 days until the project is completed.  
+
9/11/20: Guidance has been updated to reflect changes in the Section 106 processes that have incrementally occurred over the last few years.
  
'''New QRG'''
+
'''[[147.3 Job Order Contracting (JOC)#147.3.11 Request to Subcontract Work (Form C-220)|EPG 147.3.11 Request to Subcontract Work (Form C-220)]]'''
  
6/11/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_IAS_Lab_Audit.doc AWP MA I.A.S. Lab Audit] is now available.
+
9/2/20: This new guidance provides clarification for the process.
  
'''[[751.12 Barriers, Curbs and Fences|EPG 751.12 Barriers, Curbs and Fences]]'''
+
'''[[:Category:109 Measurement and Payment#Erosion Control Change Orders|EPG 109.12 Change Orders, Non-major change orders (Change Order level 2)]]'''
  
6/9/20: EPG 751.12 Protective Barriers was retitled EPG 751.12 Barriers, Curbs and Fences. Most of the article's contents was updated with guidance for new Type H barrier.  Type D barrier is now the standard barrier for most bridges.
+
8/20/20: Guidance has been updated to current Environmental Change Orders instructions.
  
'''[[153.21 Transportation Planning|EPG 153.21 Transportation Planning]]'''  
+
'''Bolt Specs and Welding Inspection'''
  
6/5/20: New eAgreement, TP06 Planning Consolidated Grant and Surface Transportation Block Grant Program Agreement, has been added to the listings.  
+
8/18/20: Bolt specs have been corrected to the latest ASTM and welding inspection procedures have been clarified in numerous articles including  [[:Category:712 Structural Steel Construction#712.1.5 High Strength Bolts (Sec 712.7)|EPG 712.1.5 High Strength Bolts]], [[751.14 Steel Superstructure|EPG 751.14 Steel Superstructure]] and [[751.50 Standard Detailing Notes#H3f. Pot Bearing Pad Assembly|EPG 751.50, H3f. Pot Bearing Pad Assembly]] and new guidance in [[:Category:1080 Structural Steel Fabrication#1080.2 Fabrication Inspection Shipment Release (FISR)|EPG 1080.2 Fabrication Inspection Shipment Releases (FISRs)]].
  
'''[[:Category:174 Maintenance Management System (MMS)|EPG 174 Maintenance Management System (MMS)]]'''
+
'''[[153.5 Bridge|EPG 153.5 Bridge]]'''
  
6/2/20: This new article is a high-level introduction to MMS and provides users with access to the web-based program.   
+
8/13/20: The list of agreements were revised to include a column with applicable MHTC policiesArchaic contracts were deleted.
  
'''[[media:403 Guidance for Asphalt Cement Price Index Adjustments May 22 2020.docx|Guidance for Asphalt Cement Price Index Adjustments]], [[media:409 FY2021 Contract Seal Coat Guidelines b.docx|Contract Seal Coat Guidelines]] and [[media:409 FY May 21 2021 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]]'''
+
'''[[127.9 Floodplain Management#127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification|EPG 127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification]]'''
  
5/21/20: In [[:Category:403 Asphaltic Concrete Pavement|EPG 403 Asphaltic Concrete Pavement]], [[:Category:409 Seal Coat|EPG 409 Seal Coat]], [[413.3 Ultrathin Bonded Asphalt Wearing Surface|EPG 413.3 Ultrathin Bonded Asphalt Wearing Surface]] and other articles, this document has been updated to include CMS signs for Seal Coat projects.  In EPG 409, the [[media:409 FY2021 Contract Seal Coat Guidelines b.docx|Contract Seal Coat Guidelines]] and [[media:409 FY May 21 2021 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]] were also updated for the CMS signs.
+
8/13/20: Brief, new guidance has been added to make CFR requirements more apparent.
  
'''[[751.50 Standard Detailing Notes#Use for all LRFD bridge final designs initiated|LRFD Design Specifications Update]]'''  
+
'''[[153.7 Customer Relations|EPG 153.7 Customer Relations]] and [[153.22 Utility|EPG 153.22 Utility]]'''
  
5/19/20: LRFD design specification notes were updated to reflect the required use of new or previous AASHTO releases.
+
8/12/20: The signature requirements for contracts have been updated.
  
'''New QRG'''
+
'''[[236.16 Outdoor Advertising#Digital Upgrade Request|EPG 236.16.12 Digital Sign Upgrade Process]]'''
  
5/15/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Payment_Estimate_Exception_Override.doc AWP CO Contract Payment Estimate Exception Override] is now available.
+
8/12/20: Guidance for the request process was clarified. Owners were informed that the request may be denied if they do not provide the necessary documentation.
  
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.2.2 Flags and Advance Warning Rail System on Signs|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
+
'''[[:Category:503 Bridge Approach Slabs#Bridge Approach Slab (Minor Road) Sub-class Requirements|EPG 503.2 New and Replacement Bridges on Minor Roads]]'''
  
5/15/20: Guidance has been updated because flags now shall be used on the ROAD/BRIDGE WORK AHEAD signs during short durations projects in daytime hours.  Revised the photo of the sign and AWRS assemble without the flags.
+
8/7/20: Guidance was updated to reflect current practice concerning asphalt type. Asphalt designation for minor roads is now shown on roadway plans.
  
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[236.14 Change in Route Status Report#236.14.8 Change in Route Marking|EPG 236.14.8 Change in Route Marking]]'''
  
5/12/20: Numerous notes, especially [[751.50 Standard Detailing Notes#H10. Barriers – Type A, B, C, D and H|H10 notes]], have been revised to apply to all barriers.
+
8/3/20: Guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.  
  
'''Accessible Pedestrian Signals'''  
+
'''[[153.18 Multimodal|EPG 153.18 Multimodal]]'''
  
5/7/20: [[642.4 Impact of the Project Category on ADA|EPG 642.4 Impact of the Project Category on ADA]], [[902.4 Signal Installations and Equipment|EPG 902.4 Signal Installations and Equipment]] and [[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)#902.5.9 Provisions for Pedestrians (MUTCD Section 4D.03)|EPG 902.5.9 Provisions for Pedestrians]] were updated for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades.  This updated guidance also applies to new construction projects.
+
8/3/20: The signature requirements for contracts have been updated.
  
'''[[413.1 Micro-Surfacing|EPG 413.1 Micro-Surfacing]]'''
+
'''[[153.16 Medical Board Employee Benefits|EPG 153.16 Medical Board Employee Benefits]]'''
  
5/7/20: Guidance for single pass and double pass micro-surfacing was expanded. Guidance for micro-surfacing grade selection and surface preparation was also expanded.  New guidance for post construction and the method of measurement and basis of payment is now available.  
+
7/31/20: The signature requirements for 3 contracts have been updated.
  
'''RAI and RWPA System Requirements'''
+
'''[[236.6 Appraisal and Appraisal Review#Duration of Approval of Fee Appraisers on the Roster of Approved Appraisers/Reviewers|EPG 236.6.5.3, Duration of Approval of Fee Appraisers on the Roster of Approved Appraisers/Reviewers]]'''
  
5/1/20: Guidance for RAI and RWPA data entry and media upload requirements was clarified or added in [[236.3 Administration|EPG 236.3 Administration]], [[236.5 Property Management|EPG 236.5 Property Management]], [[236.6 Appraisal and Appraisal Review#236.6.1.1 Appraisal Reports Required|EPG 236.6.1.1 Appraisal Reports Required]], [[236.7 Negotiation|EPG 236.7 Negotiation]] and [[236.10 Right Of Way Condemnation#236.10.7.11 RWPA System Requirements for Condemnations|EPG 236.10.7.11 RWPA System Requirements for Condemnations]].
+
7/30/20: Guidance about the renewal application process has been clarified.

Revision as of 08:23, 28 October 2020

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts

10/28/20: On-call consultant guidance has been updated.

EPG 237.8.2 Liquidated Damages

10/26/20: Guidance was clarified to provide justification for higher liquidated damages.

EPG 1048.2.7.3 Acceptance

10/22/20: Guidance has been updated to reflect the current process for how acrylic waterborne and high build acrylic waterborne traffic marking are accepted.

Minimum Wall Thickness for CIP Piles and Limited Nominal Axial Resistance of CIP Piles Embedded and Tipped in Cohesionless Soils

10/19/20: Guidance in EPG 751.36 Driven Piles (particularly in EPG 751.36.2.2.2 Cast-In-Place (CIP) Pile, EPG 751.36.5.7.1 Design Values for Individual HP Pile, and EPG 751.36.5.10 Pile Nominal Axial Compressive Resistance) was updated to implement maximum axial loads in sands and clarified minimum nominal wall thickness requirements for CIP pile. Numerous standard detailing notes in EPG 751.50, G. Substructure Notes for hooks of vertical bar requirements for column and CIP piles were also clarified.

EPG 236.7.4.4 Agreement for Purchase of Real Estate, When Agreement for Purchase of Real Estate is Used

10/9/20: To reflect legal requirements, Tax Lien guidance was added.

EPG 108.16 Project Dates

9/30/20: EPG 108.16 has been rewritten to reflect the move to AWP.

Updated Standard Detailing Note

9/28/20: Dowel requirements for inverted U-shape precast coping for large block (panel) MSE walls in Standard Note J1.21a were clarified.

New Standard Detailing Note

9/23/20: New Note H7.8.2 is available when requiring epoxy-mastic primer coating on galvanized drain support brackets that come in contact with weathering steel beams/girders.

EPG 237.5 Special Provisions

9/22/20: Guidance has been clarified and updated to current practice.

EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities

9/16/20: Guidance has been updated to reflect current practice.

EPG 751.36.5.8 Additional Provisions for Pile Cap Footings

9/16/20: Guidance has been updated to clarify pile uplift design requirements for pile cap footing and to implement DSB-16-02 requirements.

EPG 203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)

9/16/20: Contractor-furnished borrow guidance has been updated to current practice.

EPG 127.2 Historic Preservation and Cultural Resources

9/11/20: Guidance has been updated to reflect changes in the Section 106 processes that have incrementally occurred over the last few years.

EPG 147.3.11 Request to Subcontract Work (Form C-220)

9/2/20: This new guidance provides clarification for the process.

EPG 109.12 Change Orders, Non-major change orders (Change Order level 2)

8/20/20: Guidance has been updated to current Environmental Change Orders instructions.

Bolt Specs and Welding Inspection

8/18/20: Bolt specs have been corrected to the latest ASTM and welding inspection procedures have been clarified in numerous articles including EPG 712.1.5 High Strength Bolts, EPG 751.14 Steel Superstructure and EPG 751.50, H3f. Pot Bearing Pad Assembly and new guidance in EPG 1080.2 Fabrication Inspection Shipment Releases (FISRs).

EPG 153.5 Bridge

8/13/20: The list of agreements were revised to include a column with applicable MHTC policies. Archaic contracts were deleted.

EPG 127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification

8/13/20: Brief, new guidance has been added to make CFR requirements more apparent.

EPG 153.7 Customer Relations and EPG 153.22 Utility

8/12/20: The signature requirements for contracts have been updated.

EPG 236.16.12 Digital Sign Upgrade Process

8/12/20: Guidance for the request process was clarified. Owners were informed that the request may be denied if they do not provide the necessary documentation.

EPG 503.2 New and Replacement Bridges on Minor Roads

8/7/20: Guidance was updated to reflect current practice concerning asphalt type. Asphalt designation for minor roads is now shown on roadway plans.

EPG 236.14.8 Change in Route Marking

8/3/20: Guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.

EPG 153.18 Multimodal

8/3/20: The signature requirements for contracts have been updated.

EPG 153.16 Medical Board Employee Benefits

7/31/20: The signature requirements for 3 contracts have been updated.

EPG 236.6.5.3, Duration of Approval of Fee Appraisers on the Roster of Approved Appraisers/Reviewers

7/30/20: Guidance about the renewal application process has been clarified.