'''Partial Depth Pavement Repairs'''
+
'''[[153.18 Multimodal#MO53|EPG 153.18 Multimodal]]'''
  
1/16/20: Guidance for the selection of different partial depth repairs has been clarified. [[:Category:613 Pavement Repair#613.1.2 Class A Partial Depth Pavement Repairs (Sec 613.20)|Class A]] and [[:Category:613 Pavement Repair#613.1.3 Class B Partial Depth Pavement Repairs (Sec 613.30)|Class B]] repair guidance was modified while new guidance for [[:Category:613 Pavement Repair#613.1.4 Class C Partial Depth Pavement Repairs (Sec 613.35)|Class C]] repairs was added.
+
11/24/20: Information is now available for the new template, MO53 Preliminary Engineering Master Agreement.
  
'''[[236.16 Outdoor Advertising#The information provided|EPG 236.16.5.1 Application Process]]'''
+
'''[[LPA:136.11 Local Public Agency Construction#136.11.13 Documentation Requirements|EPG 136.11.13 Documentation Requirements]]
  
1/15/20: Guidance was clarified.
+
11/23/20: MoDOT will no longer be approving specific software for use; the LPA must ensure the software chosen meets the outlined criteria.  Guidance about what should be documented in the construction diaries was clarified in [[LPA:136.11 Local Public Agency Construction#136.11.13.1 Project Diaries|EPG 136.11.13.1 Project Diaries]].
  
'''[[751.50 Standard Detailing Notes#(K1.5.1)|EPG 751.50 Standard Detailing Notes K1.5.1 and K1.5.2]]'''
+
'''[[751.50 Standard Detailing Notes#I4. Fiber Reinforced Polymer (FRP) Wrap - Bent Cap Shear Strengthening|EPG 751.50, I4. Fiber Reinforced Polymer (FRP) Wrap - Bent Cap Shear Strengthening]]'''
  
1/14/20: Note K1.5 is now split into two notes, one for use with major roads and one for minor roads.  
+
11/20/20: New standard notes for Standard Drawing RHB08 to clarify note regarding design force.
  
'''New Scenic Byways Article
+
'''[[147.3 Job Order Contracting (JOC)#147.3.6 Closing JOC Contracts|EPG 147.3.6 Closing JOC Contracts]]'''
  
1/13/20: Guidance reflecting established practice is presented in the new article, [[236.18 Scenic Byways|EPG 236.18 Scenic Byways]].
+
11/12/20: Clarified that a Materials Summary is not needed for Job Order Contracts.
  
'''MoDOT's Storm Water Pollution Prevention Plan (SWPPP)'''
+
'''Wing Lengths and C Bars'''
  
1/10/20: [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]] has been updated along with supporting guidance such as [[806.5 Site Inspections and BMP Repair|EPG 806.5 Site Inspections and BMP Repair]] to reflect the issuance of MoDOT's new State Operating Permit from DNR. Related new guidance includes [[237.2 Title Sheet#237.2.8 Estimated Area of Disturbance|EPG 237.2.8 Estimated Area of Disturbance]] and [[237.4 Plan-Profile Sheets#237.4.12 Erosion and Sediment Control Sheets|EPG 237.4.12 Erosion and Sediment Control Sheets]].
+
11/12/20: In [[751.1 Preliminary Design#751.1.2.2 Wing Lengths|EPG 751.1.2.2 Wing Lengths]], guidance was added to consider making short turned-back wings sufficiently long so that the Type D barrier end section does not require extensive. In [[751.12 Barriers, Railings, Curbs and Fences#751.12.1.2.1 Slip Forming|EPG 751.12.1.2.1 Slip Forming]], replaced guidance about determining C bars lengths with actual length of C bars.
  
'''Use of Hyphens in Structural Detailing'''
+
'''[[media:616.8.10 interim.pdf|Fig. 616.8.10 - TMA Flagger - Lane Closure on Two-Lane Highways Using TMA Flaggers - DE/CM/MT]]'''
  
1/7/20: Guidance in [[751.5 Structural Detailing Guidelines#When dimensions and quantities|EPG 751.5.1.3.4 Plurality]] and [[751.5 Structural Detailing Guidelines#751.5.1.3.6 Punctuation|EPG 751.5.1.3.6 Punctuation]] was updated for the uniform use of hyphens.
+
11/10/20: Interim guidance for TMA flagger operations is now available in [[616.8 Typical Applications (MUTCD 6H)|EPG 616.8 Typical Applications]].
  
'''[[751.35 Concrete Pile Cap Integral End Bents#(d)|EPG 751.35.4.3 Wing Reinforcement]]'''
+
'''[[751.5 Structural Detailing Guidelines|EPG 751.5 Structural Detailing Guidelines]]'''
  
12/19/19: H bar development lengths in end bent wings were slightly modified for rounding and for large skews.
+
11/9/20: Guidance has been added ([[751.5 Structural Detailing Guidelines#751.5.9.2.1.1 Reinforcing Callouts|EPG 751.5.9.2.1.1 Reinforcing Callouts]], for example) to standardize the format for reinforcing callouts.
  
'''[[:Category:409 Seal Coat#409.2.8 Method of Measurement|EPG 409.2.8 Method of Measurement]]'''
+
'''[[121.3 The Statewide Transportation Improvement Program (STIP)|EPG 121.3 The Statewide Transportation Improvement Program (STIP)]]'''
  
12/19/19: This new guidance clarifies the method of measurement for seal coat.
+
11/5/20: STIP information and the annual process to update the STIP were updated to current practice.
  
'''[[236.3 Administration#236.3.12 Consultant Right of Way Acquisition and Relocation Services (RWRS)|EPG 236.3.12 Consultant Right of Way Acquisition and Relocation Services (RWRS)]]'''
+
'''[[751.50 Standard Detailing Notes#(A2.9)|Updated Standard Detailing Note]]'''
  
12/19/19: This new guidance documents the established practice of initiating consultant right of way acquisition and relocations services.
+
11/2/20: Verbiage in A2.9 was updated to match new Standard Plan wording.
  
'''[[103.1 Bid Opening and Award Process#103.1.2.1 Emergency Work Procurement Process|EPG 103.1.2.1 Emergency Work Procurement Process]]'''
+
'''[[:Category:129 Public Involvement|EPG 129 Public Involvement]] and [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.3.1 Categorical Exclusion|EPG 127.14.3.1 Categorical Exclusion]]'''
  
12/18/19: New Emergency Work Procurement Process guidance reflecting established practice is now available.
+
10/30/20: Updated Programmatic Categorical Exclusion (PCE) and “virtual” public involvement requirements to bring policy into compliance with the federal NEPA regulations. EPG 129 Public Involvement was generally re-written.
  
'''[[LPA:136.4 Consultant Selection and Consultant Contract Management#A consulting engineering firm|EPG 136.4.1.6 Conflict of Interest]]'''
+
'''[[751.1 Preliminary Design#751.1.2.22 Types of Piling|EPG 751.1.2.22 Types of Piling]] and [[751.24 LFD Retaining Walls#MSE Wall Construction:|EPG 751.24.2.1 Design, MSE Wall Construction: Pipe Pile Spacers Guidance]]'''
  
12/16/19: Clarified guidance by adding information pertaining to when a consultant acts as a city engineer.  
+
10/30/20: Guidance clarified pile spacer embedment requirements when rock is anticipated within a 5 - 10 ft. zone below the MSE wall leveling pad.
  
'''[[237.14 Electronic Design Data Delivery|EPG 237.14 Electronic Design Data Delivery]]'''
+
'''Sand Barrel Impact Attenuator Arrays'''
  
12/13/19: Guidance has been updated to reflect the use of the latest design software version.
+
10/29/20: Guidance in [[:Category:612 Impact Attenuators#612.2 Sand-Filled Impact Attenuators (Sand Barrels)|EPG 612.2 Sand-Filled Impact Attenuators (Sand Barrels)]] and [[:Category:612 Impact Attenuators#Sand-Filled Impact Attenuator Array|EPG 612.3 Construction Inspection Guidelines]] was updated to clarify how the sand barrel impact attenuator arrays are paid for and used in work zones.
  
'''[[media:Form 806.8.2 dec 2019.pdf|Form 806.8.2, Project-Specific SWPPP Information]]'''  
+
'''[[:Category:134 Engineering Professional Services#134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts|EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts]]'''
  
12/13/19: This form (presented in [http://epg.modot.org/index.php/806.8_Storm_Water_Pollution_Prevention_Plan_(SWPPP)#806.8.1_Introduction_to_the_Storm_Water_Permit_and_Storm_Water_Polution_Prevention_Plan_.28SWPPP.29 EPG 806.8] and [http://epg.modot.org/index.php/Category:101_Standard_Forms#Design_Forms EPG 101]) now has a new page for REs/Inspectors to identify the BMPs that will be used on a project.
+
10/28/20: On-call consultant guidance has been updated.
  
'''[[237.14 Electronic Design Data Delivery#237.14.1 MoDOT and Consultant Electronic Design Data Requirements|EPG 237.14.1 MoDOT and Consultant Electronic Design Data Requirements]]'''
+
'''[[237.8 Contract Time#237.8.2 Liquidated Damages|EPG 237.8.2 Liquidated Damages]]'''
  
12/12/19: Electronic Design Data guidance was clarified.
+
10/26/20: Guidance was clarified to provide justification for higher liquidated damages.
  
'''[[751.6 General Quantities#751.6.2.5 Concrete|EPG 751.6.2.5 Concrete]]'''
+
'''[[:Category:1048 Pavement Marking Material#1048.2.7.3 Acceptance|EPG 1048.2.7.3 Acceptance]]'''
  
12/3/19: Guidance about rounding of concrete quantities for superstructure was clarified. Guidance was added to subtract concrete displaced by CIP piles.
+
10/22/20: Guidance has been updated to reflect the current process for how acrylic waterborne and high build acrylic waterborne traffic marking are accepted.
  
'''Reinforcement Details'''
+
'''Minimum Wall Thickness for CIP Piles and Limited Nominal Axial Resistance of CIP Piles Embedded and Tipped in Cohesionless Soils'''
  
12/2/19: Reinforcement details were updated in [[751.9 LFD Seismic#751.9.3.1.7 T- Joint Connections|EPG 751.9.3.1.7 T-Joint Connections]], [[751.31 Open Concrete Intermediate Bents#751.31.1.2 Rigid Frame- No Tie or Web Beam|EPG 751.31.1 and EPG 751.31.3]] and [[751.32 Concrete Pile Cap Intermediate Bents#751.32.4 Reinforcement|EPG 751.32.4 Reinforcement]] to be in accordance with new epoxy coated guidelines and with new development and splice length requirements. Alternate end bent reinforcement details for shallow structures were added in [[751.35 Concrete Pile Cap Integral End Bents#751.35.3.3 Prestressed Girder End Bent|EPG 751.35.3.3 through EPG 751.35.4.4]].      
+
10/19/20: Guidance in [[751.36 Driven Piles|EPG 751.36 Driven Piles]] (particularly in [[751.36 Driven Piles#751.36.2.2.2 Cast-In-Place (CIP) Pile|EPG 751.36.2.2.2 Cast-In-Place (CIP) Pile]], [[751.36 Driven Piles#751.36.5.7.1 Design Values for Individual HP Pile|EPG 751.36.5.7.1 Design Values for Individual HP Pile]], and [[751.36 Driven Piles#751.36.5.10 Pile Nominal Axial Compressive Resistance|EPG 751.36.5.10 Pile Nominal Axial Compressive Resistance]]) was updated to implement maximum axial loads in sands and clarified minimum nominal wall thickness requirements for CIP pile. Numerous standard detailing notes in [[751.50 Standard Detailing Notes#G. Substructure Notes|EPG 751.50, G. Substructure Notes]] for hooks of vertical bar requirements for column and CIP piles were also clarified.
  
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[236.7 Negotiation#236.7.4.4 Agreement for Purchase of Real Estate|EPG 236.7.4.4 Agreement for Purchase of Real Estate, When Agreement for Purchase of Real Estate is Used]]'''
  
11/21/19: Guidance about underlined portions of notes was added.
+
10/9/20: To reflect legal requirements, Tax Lien guidance was added.  
  
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)#When a DBE manufacturer|EPG 146.3.2.3 Commercially Useful Function (CUF)]]'''
+
'''[[:Category:108 Prosecution and Progress#108.16 Project Dates|EPG 108.16 Project Dates]]'''
  
11/19/19: The location for storing CUF documents was updated from the archaic V: drive to eProjects.
+
9/30/20: EPG 108.16 has been rewritten to reflect the move to AWP.
  
'''[[751.11 Bearings#Taper|EPG 751.11.2.1 Elastomeric Bearings Taper]]'''
+
'''[[751.50 Standard Detailing Notes#(J1.21a)|Updated Standard Detailing Note]]'''
  
11/14/19: The illustrations have been revised to clarify the maximum allowed taper.
+
9/28/20: Dowel requirements for inverted U-shape precast coping for large block (panel) MSE walls in Standard Note J1.21a were clarified.  
  
'''New QRG'''  
+
'''[[751.50 Standard Detailing Notes#(H7.8.2) Use note|New Standard Detailing Note]]'''
  
11/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_Acceptance_By_Certification.docx AWP MA Sample Record Acceptance By Certification] QRG is now available.  
+
9/23/20: New Note H7.8.2 is available when requiring epoxy-mastic primer coating on galvanized drain support brackets that come in contact with weathering steel beams/girders.
  
'''[[:Category:105 Control of Work#The DWR shall be created|EPG 105.9.3 Daily Work Reports]]'''
+
'''[[237.5 Special Provisions|EPG 237.5 Special Provisions]]'''
  
11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.
+
9/22/20: Guidance has been clarified and updated to current practice.
  
'''[[236.5 Property Management#236.5.28.3 Compensation for Changes in Access|EPG 236.5.28.3 Compensation for Changes in Access]] and [[236.6 Appraisal and Appraisal Review#After the appraiser has been made aware|EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals]]'''
+
'''[[127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities|EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities]]'''
  
10/28/19: Guidance has been clarified to better reflect current practices.
+
9/16/20: Guidance has been updated to reflect current practice.
  
'''AASHTOWare'''
+
'''[[751.36 Driven Piles#751.36.5.8 Additional Provisions for Pile Cap Footings|EPG 751.36.5.8 Additional Provisions for Pile Cap Footings]]'''
  
10/25/19: Guidance in [[:Category:105 Control of Work#105.9 Authority and Duties of Resident Engineer (Sec 105.9)|EPG 105.9 Authority and Duties of Resident Engineer]] and [[:Category:105 Control of Work#105.9.3 Daily Work Reports|EPG 105.9.3 Daily Work Reports]] now allows for the expanded opportunities of the AWP.
+
9/16/20: Guidance has been updated to clarify pile uplift design requirements for pile cap footing and to implement DSB-16-02 requirements.
  
'''Drilled Shafts'''
+
'''[[:Category:203 Roadway and Drainage Excavation, Embankment and Compaction#203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)|EPG 203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)]]'''
  
10/23/19: Guidance in [[751.37 Drilled Shafts#751.37.1.6 Drilled Shaft General Detail Considerations|EPG 751.37.1.6 Drilled Shaft General Detail Considerations]] was expanded and clarified.
+
9/16/20: Contractor-furnished borrow guidance has been updated to current practice.
  
'''[[121.7 Program Estimates#The programming estimate must address|EPG 121.7 Program Estimates]]'''
+
'''[[127.2 Historic Preservation and Cultural Resources|EPG 127.2 Historic Preservation and Cultural Resources]]'''
  
10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge.  Program estimate documentation and supporting documentation must be stored in e-Projects.
+
9/11/20: Guidance has been updated to reflect changes in the Section 106 processes that have incrementally occurred over the last few years.

Revision as of 15:29, 24 November 2020

EPG 153.18 Multimodal

11/24/20: Information is now available for the new template, MO53 Preliminary Engineering Master Agreement.

EPG 136.11.13 Documentation Requirements

11/23/20: MoDOT will no longer be approving specific software for use; the LPA must ensure the software chosen meets the outlined criteria. Guidance about what should be documented in the construction diaries was clarified in EPG 136.11.13.1 Project Diaries.

EPG 751.50, I4. Fiber Reinforced Polymer (FRP) Wrap - Bent Cap Shear Strengthening

11/20/20: New standard notes for Standard Drawing RHB08 to clarify note regarding design force.

EPG 147.3.6 Closing JOC Contracts

11/12/20: Clarified that a Materials Summary is not needed for Job Order Contracts.

Wing Lengths and C Bars

11/12/20: In EPG 751.1.2.2 Wing Lengths, guidance was added to consider making short turned-back wings sufficiently long so that the Type D barrier end section does not require extensive. In EPG 751.12.1.2.1 Slip Forming, replaced guidance about determining C bars lengths with actual length of C bars.

Fig. 616.8.10 - TMA Flagger - Lane Closure on Two-Lane Highways Using TMA Flaggers - DE/CM/MT

11/10/20: Interim guidance for TMA flagger operations is now available in EPG 616.8 Typical Applications.

EPG 751.5 Structural Detailing Guidelines

11/9/20: Guidance has been added (EPG 751.5.9.2.1.1 Reinforcing Callouts, for example) to standardize the format for reinforcing callouts.

EPG 121.3 The Statewide Transportation Improvement Program (STIP)

11/5/20: STIP information and the annual process to update the STIP were updated to current practice.

Updated Standard Detailing Note

11/2/20: Verbiage in A2.9 was updated to match new Standard Plan wording.

EPG 129 Public Involvement and EPG 127.14.3.1 Categorical Exclusion

10/30/20: Updated Programmatic Categorical Exclusion (PCE) and “virtual” public involvement requirements to bring policy into compliance with the federal NEPA regulations. EPG 129 Public Involvement was generally re-written.

EPG 751.1.2.22 Types of Piling and EPG 751.24.2.1 Design, MSE Wall Construction: Pipe Pile Spacers Guidance

10/30/20: Guidance clarified pile spacer embedment requirements when rock is anticipated within a 5 - 10 ft. zone below the MSE wall leveling pad.

Sand Barrel Impact Attenuator Arrays

10/29/20: Guidance in EPG 612.2 Sand-Filled Impact Attenuators (Sand Barrels) and EPG 612.3 Construction Inspection Guidelines was updated to clarify how the sand barrel impact attenuator arrays are paid for and used in work zones.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts

10/28/20: On-call consultant guidance has been updated.

EPG 237.8.2 Liquidated Damages

10/26/20: Guidance was clarified to provide justification for higher liquidated damages.

EPG 1048.2.7.3 Acceptance

10/22/20: Guidance has been updated to reflect the current process for how acrylic waterborne and high build acrylic waterborne traffic marking are accepted.

Minimum Wall Thickness for CIP Piles and Limited Nominal Axial Resistance of CIP Piles Embedded and Tipped in Cohesionless Soils

10/19/20: Guidance in EPG 751.36 Driven Piles (particularly in EPG 751.36.2.2.2 Cast-In-Place (CIP) Pile, EPG 751.36.5.7.1 Design Values for Individual HP Pile, and EPG 751.36.5.10 Pile Nominal Axial Compressive Resistance) was updated to implement maximum axial loads in sands and clarified minimum nominal wall thickness requirements for CIP pile. Numerous standard detailing notes in EPG 751.50, G. Substructure Notes for hooks of vertical bar requirements for column and CIP piles were also clarified.

EPG 236.7.4.4 Agreement for Purchase of Real Estate, When Agreement for Purchase of Real Estate is Used

10/9/20: To reflect legal requirements, Tax Lien guidance was added.

EPG 108.16 Project Dates

9/30/20: EPG 108.16 has been rewritten to reflect the move to AWP.

Updated Standard Detailing Note

9/28/20: Dowel requirements for inverted U-shape precast coping for large block (panel) MSE walls in Standard Note J1.21a were clarified.

New Standard Detailing Note

9/23/20: New Note H7.8.2 is available when requiring epoxy-mastic primer coating on galvanized drain support brackets that come in contact with weathering steel beams/girders.

EPG 237.5 Special Provisions

9/22/20: Guidance has been clarified and updated to current practice.

EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities

9/16/20: Guidance has been updated to reflect current practice.

EPG 751.36.5.8 Additional Provisions for Pile Cap Footings

9/16/20: Guidance has been updated to clarify pile uplift design requirements for pile cap footing and to implement DSB-16-02 requirements.

EPG 203.2.3.1.2 Embankment in Place (Contractor-Furnished Borrow)

9/16/20: Contractor-furnished borrow guidance has been updated to current practice.

EPG 127.2 Historic Preservation and Cultural Resources

9/11/20: Guidance has been updated to reflect changes in the Section 106 processes that have incrementally occurred over the last few years.