Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
(33 intermediate revisions by 2 users not shown)
Line 1: Line 1:
'''[[media:134_5_1_1_2021.xlsx|Fig. 134.5.1.1, Blank Consultant Invoice]]'''
 
 
4/8/21: The latest version of the Blank Consultant Invoice is available.  Guidance for this invoice has also been changed from life of the contract to life of the invoicing period. [[:Category:134 Engineering Professional Services#Invoicing|134.5.1.1 Workforce Diversity Verification]].
 
 
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
'''[[751.1 Preliminary Design#Common Bridge Barrier and Railing (for Rehabilitations)|EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts]]'''
+
'''Expanding the NTPEP Compliance for Buy America'''
 
 
4/6/21: In the Thrie Beam notes of the Common Bridge Barrier and Railing (for Rehabilitations) table, guidance has been updated to restrict the use of MGS approach rail with non-blocked thrie beam bridge rail.
 
 
 
'''[[media:134.2.2.5.3 2021.docx|Fig. 134.2.2.5.3, Consultant Selection Approval Letter]]'''
 
  
4/2/21: The latest version of the Consultant Selection Approval Letter is available. Guidance for this letter has also been clarified in [[:Category:134 Engineering Professional Services#Each member of the selection team|EPG 134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant]].
+
7/29/21: [[106.9 Buy America Requirement#The “Certificate of Materials Origins” form|EPG 106.9 Buy America Requirement]] has been revised to make it easier for contractors and suppliers to comply with the Buy America policy.  
  
'''Prestressed Beams'''
+
'''Bearing Pads at Int Bents'''
  
4/2/21: New [[751.21 Prestressed Concrete Slab and Box Beams|EPG 751.21 Prestressed Concrete Slab and Box Beams]] is available to provide guidance for designing beams. [[751.1 Preliminary Design#751.1.2.4 Skew Angle|EPG 751.1.2.4 Skew Angle]], [[751.1 Preliminary Design#751.1.2.7 Structure Type Selection|EPG 751.1.2.7 Structure Type Selection]], [[751.10 General Superstructure#751.10.1.14 Girder and Beam Haunch Reinforcement|EPG 751.10.1.14 Girder and Beam Haunch Reinforcement]], [[751.22 Prestressed Concrete I Girders#751.22.1.2 Geometric Dimensions|751.22.1.2 Geometric Dimensions]], [[751.22 Prestressed Concrete I Girders#751.22.1.4.2 Girder Length and Geometric Layout|EPG 751.22.1.4.2 Girder Length and Geometric Layout]], [[751.22 Prestressed Concrete I Girders#751.22.2.4 Shear|EPG 751.22.2.4 Shear ]], [[751.22 Prestressed Concrete I Girders#751.22.3.8 Camber, Haunching, and Stepping and Sloping of Top Flange Camber|EPG 751.22.3.8 Camber, Haunching, and Stepping and Sloping of Top Flange Camber]] and several notes in [[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]] were updated to correspond to the new guidance in EPG 751.21 Prestressed Concrete Slab and Box Beams. Also, retitled/re-numbered EPG 751.20 Continuous Concrete Slab Bridges as [[751.17 Concrete Slab Bridges|EPG 751.17 Concrete Slab Bridges]], EPG 751.21 Concrete Box Girders as [[751.18 Concrete Multicell Box Girder Bridges|EPG 751.18 Concrete Multicell Box Girder Bridges]], EPG 751.22 P/S Concrete I Girders as [[751.22 Prestressed Concrete I Girders|EPG 751.22 Prestressed Concrete I Girders]], EPG 751.23 P/S Concrete Double Tee as [[751.23 Prestressed Concrete Double Tee Girders|EPG 751.23 Prestressed Concrete Double Tee Girders]] and EPG 751.40 Widening and Repair (LFD and Not Updated) as [[751.40 LFD Widening and Repair|EPG 751.40 LFD Widening and Repair]].  
+
7/28/21: In [[751.11 Bearings#Plain elastomeric bearing pads|EPG 751.11.2.1 Elastomeric Bearings]], guidance for bearing pads at intermediate bents has been clarified.
  
'''[[:Category:501 Concrete#501.1.3.5 Compressive Strength|EPG 501.1.3.5 Compressive Strength]]'''
+
'''Reporting Damaged Guardrail or Guard Cable'''
  
3/26/21:  Guidance about curing and testing procedures for cores and cylinders in projects with paving and structures has been clarified.
+
7/27/21:  In [[:Category:606 Guardrail and Guard Cable|EPG 606 Guardrail and Guard Cable]], a contact number for reporting damaged guardrail or guard cable is now presented.
  
'''[[751.50 Standard Detailing Notes#(H5.7)|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[147.4 Fixed Price Variable Scope (FPVS) Contracting|EPG 147.4 Fixed Price Variable Scope (FPVS) Contracting]]'''
  
3/25/21: This note was updated to clarify the procedure for making holes for a finger plate connection.
+
7/23/21: This article provides guidance for the new contracting method, Fixed Price Variable Scope (FPVS) Contracting, that has been approved by the FHWA.
  
'''[[:Category:129 Public Involvement#129.3 “Virtual” Public Involvement (VPI)|EPG 129.3 “Virtual” Public Involvement (VPI)]]'''
+
'''[[:Category:409 Seal Coat#Seal coats/chip seals|EPG 409 Seal Coat]]'''
  
3/24/21: Guidance has been placed in a box here and in [[:Category:129 Public Involvement#129.6 Public Hearing|EPG 129.6 Public Hearing]] stating that the FHWA will temporarily allow all public involvement activities previously conducted in person to exclusively use virtual techniques.
+
7/23/21: The Seal Coat Guidelines and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were also added.
  
'''[[236.16 Outdoor Advertising#If the cut area is located|EPG 236.16.15 Vegetation Removal]]'''
+
'''[[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]]'''
  
3/24/21: Guidance has been updated to current practice.  
+
7/23/21: The Contract Leveling Course (CLC) Guidelines and associated JSP package were updated.  New CLC Book Job Guidelines and CLC Book Job JSP Package were also added.
  
'''[[:Category:108 Prosecution and Progress#Subletting Limitation|EPG 108.1.1 Review and Approval of a Subcontract Request]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.89 Radar Speed Advisory System (RSAS)|EPG 616.6.89 Radar Speed Advisory System (RSAS)]]'''
  
3/23/21: New guidance is available about when subletting requirements can be adjusted.
+
7/21/21: A link to the new nonstandard JSP, [https://spexternal.modot.mo.gov/sites/de/JSP/NJSP2106.docx?d=wec3fa9082eb645edbb9e979c1049b745 NJSP 21-06 Radar Speed Advisory System], is now available.
  
'''[[:Category:109 Measurement and Payment#109.12.3.2 Description, Reason and Supporting Documentation|EPG 109.12.3.2 Description, Reason and Supporting Documentation]]'''
+
'''[[903.4 Overhead Sign Mounting#903.4.8 Bridge-Mounted Signs|EPG 903.4.8 Bridge-Mounted Signs]] and [[903.4 Overhead Sign Mounting#903.4.9 Bridge-Mounted Structure Designs|EPG 903.4.9 Bridge-Mounted Structure Designs]]'''
  
3/19/21: This new guidance is available for addressing time adjustment change orders as well as the supporting documentation.
+
7/21/21: Guidance for handling bridge sign attachments was expanded and updated to current established practice.  
  
'''[[903.14 Memorial Signs#903.14.1 Memorial Designation Programs|EPG 903.14.1 Memorial Designation Programs]]'''
+
'''[[903.7 Conventional Road Guide Signs#903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50)|EPG 903.7.49 Community Wayfinding Signs]]'''
  
3/17/21: New Memorial Designation Programs guidance is now available for statewide uniformity.
+
7/16/21: As a convenience to cities, a simplified document, [[media:903.7.49 Key Wayfinding.pdf|Key Wayfinding Requirements]], is now available.
  
'''Pier Protection'''
+
'''[[#236.4.7.2 Quitclaim Deed (to the Commission)|EPG 236.4.7.2 Quitclaim Deed (to the Commission)]]'''
  
3/15/21: In [[751.2 Loads#Vehicular Collision Force, CT|EPG 751.2.2.6 Other Loads]], [[751.31 Open Concrete Intermediate Bents#751.31.2.2 Loads|EPG 751.31.2.2 Loads]] and [[751.31 Open Concrete Intermediate Bents#751.31.3.2 Column|EPG 751.31.3.2 Column]], pier protection guidance was updated to reflect the latest AASHTO collision requirements and MoDOT exceptions.
+
7/15/21: Guidance about the determination and documentation of when tenant interest must be released has been expanded and clarified.
  
'''[[751.10 General Superstructure|EPG 751.10 General Superstructure]]'''
+
'''Material Supplier CUF Frequency'''
  
3/12/21: Deck cantilever design guidance for the MASH Type D and H barriers is now available in EPG 751.10, particularly in [[751.10 General Superstructure#751.10.1.3 Loads|EPG 751.10.1.3 Loads]].  
+
7/15/21: In [[:Category:146 Disadvantaged Business Enterprise (DBE)#146.3.2.3 Commercially Useful Function (CUF)|EPG 146.3.2.3 Commercially Useful Function (CUF)]], updated guidance about material supplier CUF frequency to every 30 days, regardless of DBE activity.
  
'''[[#751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts|EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts]]'''
+
'''[[:Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material#Table 1040.4 Qualified Plastic Guardrail Blocks|King MASH Composite Block]]'''
  
3/12/21: Guidance has been updated for the use of MASH and NCHRP 350 barrier and rail.  
+
7/1/21: MoDOT has recently approved a new, MASH-tested composite block for guardrail.
  
'''[http://epg.modot.mo.gov/forms/CM/AWP_QRG_Revision_Dates.xlsx AWP QRG Revision Dates]'''
+
'''System I Structural Steel Coating'''
  
3/9/21: For the convenience of readers, AWP QRG Revision Dates information has been added to [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101, AASHTOWare Project Quick Reference Guides (QRGs)]].
+
6/30/21: In [[751.6 General Quantities#When System I finish field coat|EPG 751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel)]], guidance about System I finish field coat was clarified. In [[751.50 Standard Detailing Notes#A4a1. Steel Structures- Nonweathering Steel|EPG 751.50 Standard Detailing Notes]], additional options for System I structural steel protective coatings were provided.
  
'''[[:Category:105 Control of Work#105.15.1 Partial Acceptance|EPG 105.15.1 Partial Acceptance]]'''
+
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)|EPG 146 Disadvantaged Business Enterprise (DBE)]]'''
  
3/8/21: New, clarifying guidance is now available for partial acceptance.
+
6/23/21: Guidance for project bid proposals that include DBE goals has been clarified and expanded.
  
'''Public Involvement when Considering Roundabouts and J-Turns'''
+
'''[[751.1 Preliminary Design#751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts|EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts]]'''
  
3/5/21: Guidance was expanded in [[233.2 At-Grade Intersections with Stop and Yield Control#Public acceptance|EPG 233.2.6 Type 4: Directional Median Opening with Downstream U-Turns]] and [[233.3 Roundabouts#Public acceptance|EPG 233.3 Roundabouts]] to draw additional attention to the benefits of public involvement for J-Turn and roundabout designs.
+
6/16/21: Guidance for barrier and railing options on existing bridges has been simplified.
  
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Sign Display|EPG 616.6.61 Arrow Boards]]'''
+
'''[[:Category:109 Measurement and Payment#109.10 Contract Assignment Process - Contract Reassignment to a New Contractor (for Sec 109.10)|EPG 109.10 Contract Assignment Process - Contract Reassignment to a New Contractor]]'''
  
3/4/21: The Sign Display table was revised to show that the Work Type for Flashing Double Arrows is both Stationary and Mobile Operations, not just Stationary.  
+
6/15/21: Expanded guidance is now available about how to assign a contract.
  
'''[http://sp/sites/de/epg/Lists/EPGResponse/Attachments/1477/80013901-MoDOT-Dos%20and%20Donts%20in%20Construction%20Zones%20flier_11x17_FINAL.pdf Quality Standards for Temporary Traffic Control Devices]'''
+
'''[[616.8 Typical Applications (MUTCD 6H)#616.8.1 Listing of Typical Applications|EPG 616.8.1 Listing of Typical Applications]]'''
  
3/2/21: This new work zone flyer highlights the top deficiencies noticed in MoDOT work zones. Also, guidance for TTCD retroreflectivity has been expanded in [[616.19 Quality Standards for Temporary Traffic Control Devices#616.19.2.1 General|EPG 616.19.2.1 General]].
+
6/11/21: For greater convenience, a new "effective date" column has been added for each TA in these tables.
  
'''Buy America Requirements'''
+
'''Prestressed Girders and Beams'''
  
2/25/21: Guidance in [[106.9 Buy America Requirement#As of March 1, 2021|EPG 106.9 Buy America Requirement]] and [[106.21 Summary of Materials Inspected#106.21.1.1 Summary Packet of Materials Inspected|EPG 106.21.1.1 Summary Packet of Materials Inspected]] was added to utilize NTPEP compliance that AASHTO already has in place for programmatic acceptance of Buy AmericaIt significantly reduces paperwork and effort from suppliers, contractors, MoDOT and FHWA.  
+
6/10/21: In [[751.10 General Superstructure#751.10.1.14 Girder and Beam Haunch Reinforcement|EPG 751.10.1.14 Girder and Beam Haunch Reinforcement]], [[751.21 Prestressed Concrete Slab and Box Beams#751.21.3 Details|EPG 751.21.3 Details]], [[751.22 Prestressed Concrete I Girders#751.22.1.2 Geometric Dimensions|EPG 751.22.1.2 Geometric Dimensions]], [[751.22 Prestressed Concrete I Girders#751.22.2.4 Shear|EPG 751.22.2.4 Shear]], [[751.22 Prestressed Concrete I Girders#751.22.3.2 MoDOT Standard Girder Strand Arrangements|EPG 751.22.3.2 MoDOT Standard Girder Strand Arrangements]], [[751.22 Prestressed Concrete I Girders#751.22.3.3 NU Standard Girders|EPG 751.22.3.3 NU Standard Girders]], [[751.22 Prestressed Concrete I Girders#751.22.3.4.2 Shear Reinforcement|EPG 751.22.3.4.2 Shear Reinforcement]], [[751.22 Prestressed Concrete I Girders#751.22.3.4.3 Anchorage Zone Reinforcement|EPG 751.22.3.4.3 Anchorage Zone Reinforcement]], and [[751.50 Standard Detailing Notes#H2c. Prestressed Girders and Beams|EPG 751.50 Standard Detailing Notes]], guidance about end section reinforcement for NU girders was revised as was guidance on specifying debonding regions.  The requirement for a lifting loop detail was removed as was the reference to the 5-inch projection of WWRNotes were also revised or removed in accordance with spec book revisions.
  
'''EPG 751.50 Standard Detailing Notes'''
+
'''[[:Category:201 Clearing and Grubbing#201.2.5.1 Open Burning|EPG 201.2.5.1 Open Burning]]'''
  
2/23/21: Several [[751.50 Standard Detailing Notes#H3. Bearings|H3. Bearings]] notes were updated to clarify sole plate and anchor bolt coating requirements when superstructure is galvanized. Two notes, [[751.50 Standard Detailing Notes#(H3.29.2)|H3.29.2]] and [[751.50 Standard Detailing Notes#(H3.49.2)|H3.49.2]], were added.
+
6/10/21: Guidance about open burning has been expanded.
  
'''School Speed Limit'''
+
'''[[616.18 Construction Inspection Guidelines for Sec 616#Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects|EPG 616.18, Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects]]'''
  
2/22/21: Guidance for when to install a school speed limit flasher assembly was updated in [[902.12 Flashing Beacons (MUTCD Chapter 4L)#902.12.7 Procedures for Advance Beacon Installations by Outside Parties|EPG 902.12.7 Procedures for Advance Beacon Installations by Outside Parties]]. The guidance for the SPEED LIMIT XX WHEN FLASHING sign is now available in [[903.18 Signing for School Areas#903.18.14 School Speed Limit Flasher Assembly (S5-1) and END SCHOOL SPEED LIMIT Sign (S5-3) (MUTCD Section 7B.15)|EPG 903.18.14 School Speed Limit Flasher Assembly (S5-1) and END SCHOOL SPEED LIMIT Sign (S5-3)]].  New guidance about stopping for school buses loading or unloading children is available in [[903.18 Signing for School Areas#903.18.16 STOP FOR SCHOOL BUS LOADING OR UNLOADING CHILDREN STATE LAW (Special R0-1), ALL LANES (Special W0-1) Signing|EPG 903.18.16 STOP FOR SCHOOL BUS LOADING OR UNLOADING CHILDREN STATE LAW (Special R0-1), ALL LANES (Special W0-1) Signing]].
+
6/7/21: Guidance has been updated with current practices and terminology.
  
'''Accessible Pedestrian Signal'''
+
'''[[:Category:107 Legal Relations and Responsibility to the Public#107.4 Safety and Sanitary Provisions|EPG 107.4 Safety and Sanitary Provisions]]'''
  
2/22/21: In [[902.6 Pedestrian Control Features (MUTCD Chapter 4E)#902.6.9 Accessible Pedestrian Signals and Detectors – General (MUTCD Section 4E.09)|EPG 902.6.9 Accessible Pedestrian Signals and Detectors – General  through EPG 902.6.15 Post-installation Checklist of Accessible Pedestrian Signals and Maintenance]], guidance about Accessible Pedestrian Signals (APS) for the visually impaired has been expanded.  Standards and support are now provided for APS locations, walk indications, tactile arrows, locator tones, and extended pushbutton press features.  A [[media:902.6.15.1 checklist.xlsx|post-installation checklist]] has also been provided.  Pages 15 and 16 of the [[media:136.9.4 2021.docx|ADA Checklist]] was also updated in [[:Category:101 Standard Forms#Construction and Materials|EPG 101  Standard Forms]], [[LPA:136.9 Plans, Specs and Estimates (PSE)|EPG 136.9 Plans, Specs and Estimates (PSE)]], and [[642.8 Sidewalk Design Criteria|EPG 642.8 Sidewalk Design Criteria]].  
+
5/25/21: New guidance is available to clarify hard hat safety policy.
  
'''[[236.4 Description Writing and Titles#236.4.5.5 Right of Entry|EPG 236.4.5.5 Right of Entry]]'''
+
'''[[media:402 CLC 2022 Plans.pdf|CLC Contractor pdf Files]] and [[media:409 FY 2022 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]]'''
  
2/19/21: New Right of Entry guidance is available for when and how this agreement (RW21) should be used.  
+
5/25/21: The Contract Leveling Course (CLC) contractor pdf files and Contract Seal Coat pdf plan sheets, in [[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]] and [[:Category:409 Seal Coat|EPG 409 Seal Coat]], respectively, were updated. Several revisions involved safety edge, flag assemblies and rumble strip spacing for CLC projects and flag assemblies for seal coat projects.
  
'''[[238.2 Land Surveying#The signature and seal of the PLS|EPG 238.2.17 Professional Land Surveyor Review]]'''
+
'''[[153.6 Chief Counsel's Office#CC11|EPG 153.6 Chief Counsel's Office]]'''
  
2/19/21: Guidance was updated to reflect the legal requirement that permanent easements must be signed and sealed by the PLS.
+
5/18/21: Guidance is now available for two new Amended Attorney Services Agreement contracts (CC11 and CC12).
  
'''[[147.3 Job Order Contracting (JOC)|EPG 147.3 Job Order Contracting (JOC)]]'''
+
'''[[media:146 CUF After Mar 2021.pdf|Commercially Useful Function (CUF) Determination Form]]'''
  
2/18/21: The opening paragraph has been updated because the FHWA has incorporated their Final Rule for ID/IQ projects into 23 CFR 635 Subpart F. JOCs are a procurement means for delivering ID/IQ projects.
+
5/10/212: The CUF Determination Form, discussed in [[:Category:146 Disadvantaged Business Enterprise (DBE)#146.3 Commercially Useful Function Verifications|EPG 146.3 Commercially Useful Function Verifications]], has been revised with more open ended questions that assist in determining whether a DBE is performing a Commercially Useful Function. The form now includes a field observation section for inspectors to note what they saw in the field.  
  
'''[[media:902.5.8.3.1 checklist.xlsx|Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist]]'''
+
'''[[237.2 Title Sheet|EPG 237.2 Title Sheet]]'''
  
2/17/21: This new Highway Safety/Traffic checklist is available at [[:Category:101 Standard Forms#Highway Safety/Traffic|EPG 101 Standard Forms]] and [[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)#5. Preventive Maintenance|EPG 902.5.8.4 Record Keeping]].
+
4/30/21: Guidance about multiple title pages has been provided.

Revision as of 09:02, 29 July 2021

Expanding the NTPEP Compliance for Buy America

7/29/21: EPG 106.9 Buy America Requirement has been revised to make it easier for contractors and suppliers to comply with the Buy America policy.

Bearing Pads at Int Bents

7/28/21: In EPG 751.11.2.1 Elastomeric Bearings, guidance for bearing pads at intermediate bents has been clarified.

Reporting Damaged Guardrail or Guard Cable

7/27/21: In EPG 606 Guardrail and Guard Cable, a contact number for reporting damaged guardrail or guard cable is now presented.

EPG 147.4 Fixed Price Variable Scope (FPVS) Contracting

7/23/21: This article provides guidance for the new contracting method, Fixed Price Variable Scope (FPVS) Contracting, that has been approved by the FHWA.

EPG 409 Seal Coat

7/23/21: The Seal Coat Guidelines and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were also added.

EPG 402 Bituminous Surface Leveling

7/23/21: The Contract Leveling Course (CLC) Guidelines and associated JSP package were updated. New CLC Book Job Guidelines and CLC Book Job JSP Package were also added.

EPG 616.6.89 Radar Speed Advisory System (RSAS)

7/21/21: A link to the new nonstandard JSP, NJSP 21-06 Radar Speed Advisory System, is now available.

EPG 903.4.8 Bridge-Mounted Signs and EPG 903.4.9 Bridge-Mounted Structure Designs

7/21/21: Guidance for handling bridge sign attachments was expanded and updated to current established practice.

EPG 903.7.49 Community Wayfinding Signs

7/16/21: As a convenience to cities, a simplified document, Key Wayfinding Requirements, is now available.

EPG 236.4.7.2 Quitclaim Deed (to the Commission)

7/15/21: Guidance about the determination and documentation of when tenant interest must be released has been expanded and clarified.

Material Supplier CUF Frequency

7/15/21: In EPG 146.3.2.3 Commercially Useful Function (CUF), updated guidance about material supplier CUF frequency to every 30 days, regardless of DBE activity.

King MASH Composite Block

7/1/21: MoDOT has recently approved a new, MASH-tested composite block for guardrail.

System I Structural Steel Coating

6/30/21: In EPG 751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel), guidance about System I finish field coat was clarified. In EPG 751.50 Standard Detailing Notes, additional options for System I structural steel protective coatings were provided.

EPG 146 Disadvantaged Business Enterprise (DBE)

6/23/21: Guidance for project bid proposals that include DBE goals has been clarified and expanded.

EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts

6/16/21: Guidance for barrier and railing options on existing bridges has been simplified.

EPG 109.10 Contract Assignment Process - Contract Reassignment to a New Contractor

6/15/21: Expanded guidance is now available about how to assign a contract.

EPG 616.8.1 Listing of Typical Applications

6/11/21: For greater convenience, a new "effective date" column has been added for each TA in these tables.

Prestressed Girders and Beams

6/10/21: In EPG 751.10.1.14 Girder and Beam Haunch Reinforcement, EPG 751.21.3 Details, EPG 751.22.1.2 Geometric Dimensions, EPG 751.22.2.4 Shear, EPG 751.22.3.2 MoDOT Standard Girder Strand Arrangements, EPG 751.22.3.3 NU Standard Girders, EPG 751.22.3.4.2 Shear Reinforcement, EPG 751.22.3.4.3 Anchorage Zone Reinforcement, and EPG 751.50 Standard Detailing Notes, guidance about end section reinforcement for NU girders was revised as was guidance on specifying debonding regions. The requirement for a lifting loop detail was removed as was the reference to the 5-inch projection of WWR. Notes were also revised or removed in accordance with spec book revisions.

EPG 201.2.5.1 Open Burning

6/10/21: Guidance about open burning has been expanded.

EPG 616.18, Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects

6/7/21: Guidance has been updated with current practices and terminology.

EPG 107.4 Safety and Sanitary Provisions

5/25/21: New guidance is available to clarify hard hat safety policy.

CLC Contractor pdf Files and Contract Seal Coat pdf Plan Sheets

5/25/21: The Contract Leveling Course (CLC) contractor pdf files and Contract Seal Coat pdf plan sheets, in EPG 402 Bituminous Surface Leveling and EPG 409 Seal Coat, respectively, were updated. Several revisions involved safety edge, flag assemblies and rumble strip spacing for CLC projects and flag assemblies for seal coat projects.

EPG 153.6 Chief Counsel's Office

5/18/21: Guidance is now available for two new Amended Attorney Services Agreement contracts (CC11 and CC12).

Commercially Useful Function (CUF) Determination Form

5/10/212: The CUF Determination Form, discussed in EPG 146.3 Commercially Useful Function Verifications, has been revised with more open ended questions that assist in determining whether a DBE is performing a Commercially Useful Function. The form now includes a field observation section for inspectors to note what they saw in the field.

EPG 237.2 Title Sheet

4/30/21: Guidance about multiple title pages has been provided.