'''Material Supplier CUF Frequency'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.37 Shoulder Work Signs (WO21-5b) (MUTCD 6F.37)|EPG 616.6.37 Shoulder Work Signs (WO21-5b)]]'''
  
7/15/21: In [[:Category:146 Disadvantaged Business Enterprise (DBE)#146.3.2.3 Commercially Useful Function (CUF)|EPG 146.3.2.3 Commercially Useful Function (CUF)]], updated guidance about material supplier CUF frequency to every 30 days, regardless of DBE activity.
+
9/23/21: Guidance for SHOULDER WORK, SHOULDER WORK AHEAD, and RIGHT/LEFT SHOULDER CLOSED signs has been updated.
  
'''[[:Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material#Table 1040.4 Qualified Plastic Guardrail Blocks|King MASH Composite Block]]'''
+
'''[[127.14 National Environmental Policy Act (NEPA) Classification and Documents#Major Traffic Disruption|Major Traffic Disruption (PCE agreement threshold)]]'''
  
7/1/21: MoDOT has recently approved a new, MASH-tested composite block for guardrail.
+
9/9/21: The definition of Major Traffic Disruption was updated to use the U.S. Census Bureau’s Urban Area Reference Maps since these maps more accurately depict a project area's rural or urban status.
  
'''System I Structural Steel Coating'''
+
'''[[media:616.18 Unit Price 2021.pdf|Unit Pricing Table]]'''
  
6/30/21: In [[751.6 General Quantities#When System I finish field coat|EPG 751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel)]], guidance about System I finish field coat was clarified. In [[751.50 Standard Detailing Notes#A4a1. Steel Structures- Nonweathering Steel|EPG 751.50 Standard Detailing Notes]], additional options for System I structural steel protective coatings were provided.
+
9/7/21: The Unit Price Table has been updated in [[616.18 Construction Inspection Guidelines for Sec 616#4. The Resident|EPG 616.18, Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects]] to reflect the new MO Logos contract.  
  
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)|EPG 146 Disadvantaged Business Enterprise (DBE)]]'''
+
'''[[:Category:134 Engineering Professional Services#If interviews and/or|EPG 134.2.2.5, Consultant Presentations and Interviews]]'''
  
6/23/21: Guidance for project bid proposals that include DBE goals has been clarified and expanded.
+
9/1/21: [[media:134.2.2.5.4 2021.docx|Fig. 134.2.2.5.4, District/Division Approval of Short List]], and guidance for the consultant agreements short list process have been streamlined, clarified and brought to current, established practice.
  
'''[[751.1 Preliminary Design#751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts|EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts]]'''
+
'''[[media:127.1 Instructions 2021.pdf|How to Complete the Request for Environmental Services ]]'''
  
6/16/21: Guidance for barrier and railing options on existing bridges has been simplified.
+
8/31/21: This updated document accommodates the new web-based system and is now available in [[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]].
  
'''[[:Category:109 Measurement and Payment#109.10 Contract Assignment Process - Contract Reassignment to a New Contractor (for Sec 109.10)|EPG 109.10 Contract Assignment Process - Contract Reassignment to a New Contractor]]'''
+
'''[[127.25 Maintenance Environmental Policies#127.25.1.4 Street Sweepings|EPG 127.25.1.4 Street Sweepings]]'''
  
6/15/21: Expanded guidance is now available about how to assign a contract.
+
8/26/21: Established guidance about analyzing street sweepings prior to disposal is now available.  
  
'''[[616.8 Typical Applications (MUTCD 6H)#616.8.1 Listing of Typical Applications|EPG 616.8.1 Listing of Typical Applications]]'''
+
'''[[media:1081 Bridge Packet Memo a.pdf|Bridge Blasting and Painting Packet]]'''
  
6/11/21: For greater convenience, a new "effective date" column has been added for each TA in these tables.
+
8/23/21: Inspectors and REs may now access this information in [[237.9 Submission of Plans and Supporting Documents#237.9.3.2 Required Information for Submittal|EPG 237.9.3.2 Required Information for Submittal]] and [[:Category:1081 Coating of Structural Steel|EPG 1081 Coating of Structural Steel]].
  
'''Prestressed Girders and Beams'''
+
'''Temporary Rumble Strips'''
  
6/10/21: In [[751.10 General Superstructure#751.10.1.14 Girder and Beam Haunch Reinforcement|EPG 751.10.1.14 Girder and Beam Haunch Reinforcement]], [[751.21 Prestressed Concrete Slab and Box Beams#751.21.3 Details|EPG 751.21.3 Details]], [[751.22 Prestressed Concrete I Girders#751.22.1.2 Geometric Dimensions|EPG 751.22.1.2 Geometric Dimensions]], [[751.22 Prestressed Concrete I Girders#751.22.2.4 Shear|EPG 751.22.2.4 Shear]], [[751.22 Prestressed Concrete I Girders#751.22.3.2 MoDOT Standard Girder Strand Arrangements|EPG 751.22.3.2 MoDOT Standard Girder Strand Arrangements]], [[751.22 Prestressed Concrete I Girders#751.22.3.3 NU Standard Girders|EPG 751.22.3.3 NU Standard Girders]], [[751.22 Prestressed Concrete I Girders#751.22.3.4.2 Shear Reinforcement|EPG 751.22.3.4.2 Shear Reinforcement]], [[751.22 Prestressed Concrete I Girders#751.22.3.4.3 Anchorage Zone Reinforcement|EPG 751.22.3.4.3 Anchorage Zone Reinforcement]], and [[751.50 Standard Detailing Notes#H2c. Prestressed Girders and Beams|EPG 751.50 Standard Detailing Notes]], guidance about end section reinforcement for NU girders was revised as was guidance on specifying debonding regions.  The requirement for a lifting loop detail was removed as was the reference to the 5-inch projection of WWR.  Notes were also revised or removed in accordance with spec book revisions.
+
8/13/21: [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations|Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations]] and [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway|Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway]] were updated and expanded to show the correct placement of both short-term and long-term rumble strips and associated signage.
  
'''[[:Category:201 Clearing and Grubbing#201.2.5.1 Open Burning|EPG 201.2.5.1 Open Burning]]'''
+
'''Void Slab Calculations'''
  
6/10/21: Guidance about open burning has been expanded.
+
8/12/21: In [[751.21 Prestressed Concrete Slab and Box Beams#751.21.1.3 Geometric Properties|EPG 751.21.1.3 Geometric Properties]], the geometry figures were revised with updated voided slab beam calculations.  In [[751.21 Prestressed Concrete Slab and Box Beams#751.21.3.2.2 End Blocks Lengths and Weights|EPG 751.21.3.2.2 End Blocks Lengths and Weights]], end block weights were adjusted to conform with the new void areas and in [[751.21 Prestressed Concrete Slab and Box Beams#751.21.3.8 Vent Pipes for Stream Crossings|EPG 751.21.3.8 Vent Pipes for Stream Crossings]] the 15" diaphragm weights were also adjusted to the new void areas.  
  
'''[[616.18 Construction Inspection Guidelines for Sec 616#Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects|EPG 616.18, Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects]]'''
+
'''Expanding the NTPEP Compliance for Buy America'''
  
6/7/21: Guidance has been updated with current practices and terminology.
+
7/29/21: [[106.9 Buy America Requirement#The “Certificate of Materials Origins” form|EPG 106.9 Buy America Requirement]] has been revised to make it easier for contractors and suppliers to comply with the Buy America policy.  
  
'''[[:Category:107 Legal Relations and Responsibility to the Public#107.4 Safety and Sanitary Provisions|EPG 107.4 Safety and Sanitary Provisions]]'''
+
'''Bearing Pads at Int Bents'''
  
5/25/21: New guidance is available to clarify hard hat safety policy.
+
7/28/21: In [[751.11 Bearings#Plain elastomeric bearing pads|EPG 751.11.2.1 Elastomeric Bearings]], guidance for bearing pads at intermediate bents has been clarified.
  
'''[[media:402 CLC 2022 Plans.pdf|CLC Contractor pdf Files]] and [[media:409 FY 2022 Seal Coat Plans.pdf|Contract Seal Coat pdf Plan Sheets]]'''
+
'''Reporting Damaged Guardrail or Guard Cable'''
  
5/25/21: The Contract Leveling Course (CLC) contractor pdf files and Contract Seal Coat pdf plan sheets, in [[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]] and [[:Category:409 Seal Coat|EPG 409 Seal Coat]], respectively, were updated. Several revisions involved safety edge, flag assemblies and rumble strip spacing for CLC projects and flag assemblies for seal coat projects.
+
7/27/21: In [[:Category:606 Guardrail and Guard Cable|EPG 606 Guardrail and Guard Cable]], a contact number for reporting damaged guardrail or guard cable is now presented.
  
'''[[153.6 Chief Counsel's Office#CC11|EPG 153.6 Chief Counsel's Office]]'''
+
'''[[147.4 Fixed Price Variable Scope (FPVS) Contracting|EPG 147.4 Fixed Price Variable Scope (FPVS) Contracting]]'''
  
5/18/21: Guidance is now available for two new Amended Attorney Services Agreement contracts (CC11 and CC12).
+
7/23/21: This article provides guidance for the new contracting method, Fixed Price Variable Scope (FPVS) Contracting, that has been approved by the FHWA.
  
'''[[media:146 CUF After Mar 2021.pdf|Commercially Useful Function (CUF) Determination Form]]'''
+
'''[[:Category:409 Seal Coat#Seal coats/chip seals|EPG 409 Seal Coat]]'''
  
5/10/212: The CUF Determination Form, discussed in [[:Category:146 Disadvantaged Business Enterprise (DBE)#146.3 Commercially Useful Function Verifications|EPG 146.3 Commercially Useful Function Verifications]], has been revised with more open ended questions that assist in determining whether a DBE is performing a Commercially Useful Function. The form now includes a field observation section for inspectors to note what they saw in the field.  
+
7/23/21: The Seal Coat Guidelines and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were also added.
  
'''[[237.2 Title Sheet|EPG 237.2 Title Sheet]]'''
+
'''[[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]]'''
  
4/30/21: Guidance about multiple title pages has been provided.
+
7/23/21: The Contract Leveling Course (CLC) Guidelines and associated JSP package were updated.  New CLC Book Job Guidelines and CLC Book Job JSP Package were also added.
  
'''[[606.1 Guardrail#606.1.3.2.1 Crashworthy End Terminals with Curb|EPG 606.1.3.2.1 Crashworthy End Terminals with Curb]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.89 Radar Speed Advisory System (RSAS)|EPG 616.6.89 Radar Speed Advisory System (RSAS)]]'''
  
4/29/21: New guidance is available for crashworthy end terminals that are being installed in the vicinity of curb.  Curb has not been tested with a CET and this guidance will help address questions and concerns about this.
+
7/21/21: A link to the new nonstandard JSP, [https://spexternal.modot.mo.gov/sites/de/JSP/NJSP2106.docx?d=wec3fa9082eb645edbb9e979c1049b745 NJSP 21-06 Radar Speed Advisory System], is now available.
  
'''[http://epg.modot.mo.gov/forms/CM/AWP_CO_CUF_Entry.doc AWP CO Commercially Useful Function (CUF) Review Date Entry]'''
+
'''[[903.4 Overhead Sign Mounting#903.4.8 Bridge-Mounted Signs|EPG 903.4.8 Bridge-Mounted Signs]] and [[903.4 Overhead Sign Mounting#903.4.9 Bridge-Mounted Structure Designs|EPG 903.4.9 Bridge-Mounted Structure Designs]]'''
  
4/29/21: For the convenience of readers, AWP QRG CUF Review Date Entry information has been added to [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101, AASHTOWare Project Quick Reference Guides (QRGs)]].
+
7/21/21: Guidance for handling bridge sign attachments was expanded and updated to current established practice.  
  
'''[[media:236 ROW timeline.pdf|Right of Way Timeline]]'''
+
'''[[903.7 Conventional Road Guide Signs#903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50)|EPG 903.7.49 Community Wayfinding Signs]]'''
  
4/26/21: Presented in [[:Category:236 Right of Way#Federal regulations|EPG 236 Right of Way]], this timeline provides the sequence of activities required to acquire property rights needed for projects.
+
7/16/21: As a convenience to cities, a simplified document, [[media:903.7.49 Key Wayfinding.pdf|Key Wayfinding Requirements]], is now available.
  
'''[[102.2 Contractor Performance Rating System#102.2.8 Performance Rating Privacy|EPG 102.2.8 Performance Rating Privacy, EPG 102.2.9 Contractor Referrals and EPG 102.2.10 Contractor Endorsements]]'''
+
'''[[#236.4.7.2 Quitclaim Deed (to the Commission)|EPG 236.4.7.2 Quitclaim Deed (to the Commission)]]'''
  
4/23/21: New clarification about when contractor ratings can be shared and when references can be made is now available.
+
7/15/21: Guidance about the determination and documentation of when tenant interest must be released has been expanded and clarified.
  
'''[[:Category:134 Engineering Professional Services#134.5.1.1 Workforce Diversity Verification|EPG 134.5.1.1 Workforce Diversity Verification]]'''
+
'''Material Supplier CUF Frequency'''
  
4/8/21: Guidance for [[media:134_5_1_1_2021.xlsx|Fig. 134.5.1.1, Blank Consultant Invoice]] has been updated from the life of the contract to life of the invoicing period.  
+
7/15/21: In [[:Category:146 Disadvantaged Business Enterprise (DBE)#146.3.2.3 Commercially Useful Function (CUF)|EPG 146.3.2.3 Commercially Useful Function (CUF)]], updated guidance about material supplier CUF frequency to every 30 days, regardless of DBE activity.
  
'''[[751.1 Preliminary Design#Common Bridge Barrier and Railing (for Rehabilitations)|EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts]]'''
+
'''[[:Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material#Table 1040.4 Qualified Plastic Guardrail Blocks|King MASH Composite Block]]'''
  
4/6/21: In the Thrie Beam notes of the Common Bridge Barrier and Railing (for Rehabilitations) table, guidance has been updated to restrict the use of MGS approach rail with non-blocked thrie beam bridge rail.
+
7/1/21: MoDOT has recently approved a new, MASH-tested composite block for guardrail.
  
'''[[media:134.2.2.5.3 2021.docx|Fig. 134.2.2.5.3, Consultant Selection Approval Letter]]'''
+
'''System I Structural Steel Coating'''
  
4/2/21: The latest version of the Consultant Selection Approval Letter is available. Guidance for this letter has also been clarified in [[:Category:134 Engineering Professional Services#Each member of the selection team|EPG 134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant]].
+
6/30/21: In [[751.6 General Quantities#When System I finish field coat|EPG 751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel)]], guidance about System I finish field coat was clarified. In [[751.50 Standard Detailing Notes#A4a1. Steel Structures- Nonweathering Steel|EPG 751.50 Standard Detailing Notes]], additional options for System I structural steel protective coatings were provided.
  
'''Prestressed Beams'''
+
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)|EPG 146 Disadvantaged Business Enterprise (DBE)]]'''
  
4/2/21: New [[751.21 Prestressed Concrete Slab and Box Beams|EPG 751.21 Prestressed Concrete Slab and Box Beams]] is available to provide guidance for designing beams. [[751.1 Preliminary Design#751.1.2.4 Skew Angle|EPG 751.1.2.4 Skew Angle]], [[751.1 Preliminary Design#751.1.2.7 Structure Type Selection|EPG 751.1.2.7 Structure Type Selection]], [[751.10 General Superstructure#751.10.1.14 Girder and Beam Haunch Reinforcement|EPG 751.10.1.14 Girder and Beam Haunch Reinforcement]], [[751.22 Prestressed Concrete I Girders#751.22.1.2 Geometric Dimensions|751.22.1.2 Geometric Dimensions]], [[751.22 Prestressed Concrete I Girders#751.22.1.4.2 Girder Length and Geometric Layout|EPG 751.22.1.4.2 Girder Length and Geometric Layout]], [[751.22 Prestressed Concrete I Girders#751.22.2.4 Shear|EPG 751.22.2.4 Shear ]], [[751.22 Prestressed Concrete I Girders#751.22.3.8 Camber, Haunching, and Stepping and Sloping of Top Flange Camber|EPG 751.22.3.8 Camber, Haunching, and Stepping and Sloping of Top Flange Camber]] and several notes in [[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]] were updated to correspond to the new guidance in EPG 751.21 Prestressed Concrete Slab and Box Beams. Also, retitled/re-numbered EPG 751.20 Continuous Concrete Slab Bridges as [[751.17 Concrete Slab Bridges|EPG 751.17 Concrete Slab Bridges]], EPG 751.21 Concrete Box Girders as [[751.18 Concrete Multicell Box Girder Bridges|EPG 751.18 Concrete Multicell Box Girder Bridges]], EPG 751.22 P/S Concrete I Girders as [[751.22 Prestressed Concrete I Girders|EPG 751.22 Prestressed Concrete I Girders]], EPG 751.23 P/S Concrete Double Tee as [[751.23 Prestressed Concrete Double Tee Girders|EPG 751.23 Prestressed Concrete Double Tee Girders]] and EPG 751.40 Widening and Repair (LFD and Not Updated) as [[751.40 LFD Widening and Repair|EPG 751.40 LFD Widening and Repair]].  
+
6/23/21: Guidance for project bid proposals that include DBE goals has been clarified and expanded.
  
'''[[:Category:501 Concrete#501.1.3.5 Compressive Strength|EPG 501.1.3.5 Compressive Strength]]'''
+
'''[[751.1 Preliminary Design#751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts|EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts]]'''
  
3/26/21: Guidance about curing and testing procedures for cores and cylinders in projects with paving and structures has been clarified.
+
6/16/21: Guidance for barrier and railing options on existing bridges has been simplified.
  
'''[[751.50 Standard Detailing Notes#(H5.7)|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[:Category:109 Measurement and Payment#109.10 Contract Assignment Process - Contract Reassignment to a New Contractor (for Sec 109.10)|EPG 109.10 Contract Assignment Process - Contract Reassignment to a New Contractor]]'''
  
3/25/21: This note was updated to clarify the procedure for making holes for a finger plate connection.
+
6/15/21: Expanded guidance is now available about how to assign a contract.

Revision as of 10:22, 23 September 2021

EPG 616.6.37 Shoulder Work Signs (WO21-5b)

9/23/21: Guidance for SHOULDER WORK, SHOULDER WORK AHEAD, and RIGHT/LEFT SHOULDER CLOSED signs has been updated.

Major Traffic Disruption (PCE agreement threshold)

9/9/21: The definition of Major Traffic Disruption was updated to use the U.S. Census Bureau’s Urban Area Reference Maps since these maps more accurately depict a project area's rural or urban status.

Unit Pricing Table

9/7/21: The Unit Price Table has been updated in EPG 616.18, Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects to reflect the new MO Logos contract.

EPG 134.2.2.5, Consultant Presentations and Interviews

9/1/21: Fig. 134.2.2.5.4, District/Division Approval of Short List, and guidance for the consultant agreements short list process have been streamlined, clarified and brought to current, established practice.

How to Complete the Request for Environmental Services

8/31/21: This updated document accommodates the new web-based system and is now available in EPG 127.1 Request for Environmental Services.

EPG 127.25.1.4 Street Sweepings

8/26/21: Established guidance about analyzing street sweepings prior to disposal is now available.

Bridge Blasting and Painting Packet

8/23/21: Inspectors and REs may now access this information in EPG 237.9.3.2 Required Information for Submittal and EPG 1081 Coating of Structural Steel.

Temporary Rumble Strips

8/13/21: Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations and Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway were updated and expanded to show the correct placement of both short-term and long-term rumble strips and associated signage.

Void Slab Calculations

8/12/21: In EPG 751.21.1.3 Geometric Properties, the geometry figures were revised with updated voided slab beam calculations. In EPG 751.21.3.2.2 End Blocks Lengths and Weights, end block weights were adjusted to conform with the new void areas and in EPG 751.21.3.8 Vent Pipes for Stream Crossings the 15" diaphragm weights were also adjusted to the new void areas.

Expanding the NTPEP Compliance for Buy America

7/29/21: EPG 106.9 Buy America Requirement has been revised to make it easier for contractors and suppliers to comply with the Buy America policy.

Bearing Pads at Int Bents

7/28/21: In EPG 751.11.2.1 Elastomeric Bearings, guidance for bearing pads at intermediate bents has been clarified.

Reporting Damaged Guardrail or Guard Cable

7/27/21: In EPG 606 Guardrail and Guard Cable, a contact number for reporting damaged guardrail or guard cable is now presented.

EPG 147.4 Fixed Price Variable Scope (FPVS) Contracting

7/23/21: This article provides guidance for the new contracting method, Fixed Price Variable Scope (FPVS) Contracting, that has been approved by the FHWA.

EPG 409 Seal Coat

7/23/21: The Seal Coat Guidelines and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were also added.

EPG 402 Bituminous Surface Leveling

7/23/21: The Contract Leveling Course (CLC) Guidelines and associated JSP package were updated. New CLC Book Job Guidelines and CLC Book Job JSP Package were also added.

EPG 616.6.89 Radar Speed Advisory System (RSAS)

7/21/21: A link to the new nonstandard JSP, NJSP 21-06 Radar Speed Advisory System, is now available.

EPG 903.4.8 Bridge-Mounted Signs and EPG 903.4.9 Bridge-Mounted Structure Designs

7/21/21: Guidance for handling bridge sign attachments was expanded and updated to current established practice.

EPG 903.7.49 Community Wayfinding Signs

7/16/21: As a convenience to cities, a simplified document, Key Wayfinding Requirements, is now available.

EPG 236.4.7.2 Quitclaim Deed (to the Commission)

7/15/21: Guidance about the determination and documentation of when tenant interest must be released has been expanded and clarified.

Material Supplier CUF Frequency

7/15/21: In EPG 146.3.2.3 Commercially Useful Function (CUF), updated guidance about material supplier CUF frequency to every 30 days, regardless of DBE activity.

King MASH Composite Block

7/1/21: MoDOT has recently approved a new, MASH-tested composite block for guardrail.

System I Structural Steel Coating

6/30/21: In EPG 751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel), guidance about System I finish field coat was clarified. In EPG 751.50 Standard Detailing Notes, additional options for System I structural steel protective coatings were provided.

EPG 146 Disadvantaged Business Enterprise (DBE)

6/23/21: Guidance for project bid proposals that include DBE goals has been clarified and expanded.

EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts

6/16/21: Guidance for barrier and railing options on existing bridges has been simplified.

EPG 109.10 Contract Assignment Process - Contract Reassignment to a New Contractor

6/15/21: Expanded guidance is now available about how to assign a contract.