Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 903.9.9)
m (Updated format of the Recent Policy Changes in the EPG)
 
(307 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
+
<div style="border: 1px solid #74BAAC; background:#DCEDEA"; padding:5px>
{| cellspacing="3"
+
<!--
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
+
INSTRUCTIONS FOR ADDING A DEFAULT DIVISION STYLE OF BOXES
'''[[903.9 General Information Signs#903.9.9 City/County Limit Signs (I4, I5, I6 Series)|EPG 903.9.9 City/County Limit Signs (I4, I5, I6 Series)]]'''
 
  
4/1/20: Guidance was clarified for where inadequate space exists to install a city limits sign at the standard location.
+
1) Copy the next 4 lines of code below
 +
2) Paste code below where you want to insert your update
 +
3) Update the Date and Text
  
'''[[153.8 Design#DE62|Design Division eAgreement Contracts]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 20, 1971
 +
----
 +
TEXT FOR RECENT UPDATES SHOULD BE IN THIS AREA
 +
</div>
  
3/31/20: New guidance is available for DE62 Stream Wetland Credit Purchase Agreement and DE66 TCF Bat Habitat Credit Purchase Agreement.
+
-->
 +
<!-- ADD NEW CONTENT BELOW THIS LINE -->
 +
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 13, 2022
 +
----
 +
Updated wording in [[806.1 Erosion Control Measures#806.1.7 Temporary Seeding|EPG 806.1.7 Temporary Seeding]], [[806.1 Erosion Control Measures#806.1.7.1 Design Considerations|EPG 806.1.7.1 Design Considerations]] and [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8.6.3.7.1 Temporary Seeding and Mulching ]]to be in sync with the July 2022 Revisions
 +
</div>
  
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Course (CLC)]] and [[:Category:409 Seal Coat|Seal Coat]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 8, 2022
 +
----
 +
Updated the guidance for [[:Category:129 Public Involvement|EPG Category:129 Public Involvement]]
 +
</div>
  
3/25/20: The Contract Leveling Course and Seal Coat guidelines, as well as their pdf files, were updated.  
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 6, 2022
 +
----
 +
Updated [[Media:2022-08-31_RES_Instruction_Manual.pdf|Request for Environmental Services(RES) Instruction Manual]] in [[:Category:101 Standard Forms|EPG Category:101 Standard Forms]], [[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]] and [[:Category:128 Conceptual Studies|EPG Category:128 Conceptual Studies]]
 +
</div>
  
'''[[147.4 Fixed Price Variable Scope (FPVS) Contracting|EPG 147.4 Fixed Price Variable Scope Contracting]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">September 1, 2022
 +
----
 +
Updated figures  [[Media:136.6.15_e106_Example_2022.pdf|136.6.15 Example e106 Form]] and [[Media:136.6.16 2022.pdf|136.6.16 LPA Project Checklist for Adverse Effects]] in [[LPA:136.6 Environmental and Cultural Requirements|EPG LPA:136.6 Environmental and Cultural Requirements]]
  
3/25/20: This new article provides guidance for the new contracting method, FPVS Contracting.
+
Updated the table in [[153.21 Traffic|EPG 153.21 Traffic]] TR06 was modified and TR07 and TR30 were removed
 +
</div>
  
'''[[153.19 Right of Way|EPG 153.19 Right of Way]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">August 31, 2022
 +
----
 +
Noise Ordinance Signing overhauled to [[903.5 Regulatory Signs#903.5.43 Engine Brake Muffler Required Signing|EPG 903.5.43 Engine Brake Muffler Required Signing]]
 +
</div>
  
3/24/20: New eAgreements, RW55 - RW60, has been added to the listings.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">July 28, 2022
 +
----
 +
Update to [[:616.14 Work Zone Safety and Mobility Policy#616.14.3.4_Work_Zone_Review_Team|EPG 616.14.3.4 Work Zone Review Team]] - During work zone reviews, video recording is used to help viewing work zone after the formal review if there is questions of the work zone. The video recording allows to retain up to 5 buisiness days and then shall be deleted
 +
</div>
  
'''[[:Category:642 Pedestrian Facilities|EPG 642 Pedestrian Facilities]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">July 25, 2022
 +
----
 +
The [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating Manual]] has been updated
 +
</div>
  
3/20/20: Please closely read this article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">July 20, 2022
 +
----
 +
Removed Warning lights from [[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]], [[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]], [[616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)|EPG 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)]], [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)|EPG 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)]] and [[616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)|EPG 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)]]
 +
</div>
  
'''[[127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities|EPG 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 29, 2022
 +
----
 +
[[620.6 Colored Pavements#620.6.1 School Logo Pavement Markings|EPG 620.6.1 School Logo Pavement Markings]] - This new guidance clarifies that these markings are not permitted
 +
</div>
  
3/16/20: Borrow practices have been clarified and new permit information has been provided.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 27, 2022
 +
----
 +
File Naming Convention for all eProject Documents - New guidelines are available in [[237.13 Contract Plan File Name Convention#237.13.1 Design Contract Plans|EPG 237.13.1 Design Contract Plans]] for a filing convention that is searchable without bringing undue pressure or constraint upon the districts
 +
</div>
  
'''[http://epg.modot.mo.gov/forms/CM/DBE_and_non_DBE_Subcontractor_Reporting_Form.pdf DBE and Non-DBE Subcontractor Reporting Form]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 24, 2022
 +
----
 +
[[751.14 Steel Superstructure|EPG 751.14 Steel Superstructure]] - Guidance for tension flanges with holes was clarified in [[751.14 Steel Superstructure#Tension Flanges with Holes|EPG 751.14.2.2 Analysis Methods]], [[751.14 Steel Superstructure#Holes in the tension flange1|EPG 751.14.5.1 Bearing Stiffeners]] and [[751.14 Steel Superstructure#Holes in the tension flange2|EPG 751.14.5.2 Int. Diaphragms and Cross Frames]]
 +
</div>
  
3/16/20: Guidance for this form is now available in [[:Category:108 Prosecution and Progress#108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting|EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting]].
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 21, 2022
 +
----
 +
Pushbutton Locations - In [[902.6 Pedestrian Control Features (MUTCD Chapter 4E)#902.6.8 Pedestrian Detectors (MUTCD Section 4E.08)|EPG 902.6.8 Pedestrian Detectors]] and in the [https://epg.modot.org/forms/CM/ADA_Checklist.pdf ADA Checklist], guidance has been updated to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches
 +
</div>
  
'''[[127.12 Air Quality|EPG 127.12 Air Quality]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 3, 2022
 +
----
 +
[[236.5 Property Management#236.5.25.5 Risk Assessment|EPG 236.5.25.5 Risk Assessment]] - Sovereign immunity limits increased in January 2022 and MoDOT's per occurrence coverage increased from $3.0 M to $3.5 M
 +
</div>
  
3/13/20:  Guidance was clarified.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">June 1, 2022
 +
----
 +
In [[751.11 Bearings#751.11.3.6 Girder/Beam Chairs|EPG 751.11.3.6 Girder/Beam Chairs]], [[751.22 Prestressed Concrete I Girders#751.22.3.5 Strands at Girder Ends|EPG 751.22.3.5 Strands at Girder Ends]] and [[751.22 Prestressed Concrete I Girders#751.22.3.7 Closed Concrete Intermediate Diaphragms|EPG 751.22.3.7 Closed Concrete Intermediate Diaphragms through EPG 751.22.3.11 Steel Intermediate Diaphragms]], guidance was revised to decrease the footprint of girder/beam chairs, clarify and expand concrete diaphragm details to incorporate larger girders, and remove web coil ties in bulb-tees and NU girders to reflect the recent change to standard drawings
 +
</div>
  
'''[[147.3 Job Order Contracting (JOC)#147.3.10 Guardrail and Guard Cable Repair|EPG 147.3.10 Guardrail and Guard Cable Repair]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 20, 2022
 +
----
 +
[[907.8 Speed Trailers Deployed by Others|EPG 907.8 Speed Trailers Deployed by Others]] - This new article provides guidance for speed trailer deployment to aid local law enforcement in the proper use of these devices
  
3/13/20: This new guidance assists JOC administrators to identify high priority repairs for guardrail and guard cable.
+
[[:Category:941 Permits and Access Requests#941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras|EPG 941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras]] - Guidance for the License Plate Reader (LPR) was clarified and expanded for proper LPR installations as identified through processing initial requests
 +
</div>
  
'''Preliminary Structure Guidance'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 19, 2022
 +
----
 +
[[:Category:747 Bridge Reports and Layouts#747.2.2.4 HEC-RAS GEO Files for Stream Crossings|EPG 747.2.2.4 HEC-RAS GEO Files for Stream Crossings]] - This subarticle was retitled and its guidance updated to reflect the current use of the "HEC-RAS Convertor for Open Roads Designer" spreadsheet
 +
</div>
  
3/9/20: Superstructure selection guidance has been updated throughout [[751.1 Preliminary Design#751.1.2.7 Structure Type Selection|EPG 751.1.2.7 Structure Type Selection to EPG 751.1.2.17 Preliminary Cost Estimate]].  Pricing and bridge replacement information was updated.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 16, 2022
 +
----
 +
The guidelines, book job guidelines, JSP packages, book job JSP packages and contractor pdf files were updated in [[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]] and [[:Category:409 Seal Coat|EPG 409 Seal Coat]]
 +
</div>
  
'''[[127.26 Environmental Classification|EPG 127.26 Environmental Classification]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">May 11, 2022
 +
----
 +
[[751.9 LFD Seismic#751.9.3.1.1 Anchor Bolts|EPG 751.9.3.1.1 Anchor Bolts through EPG 751.9.3.1.4 Concrete Shear Blocks]], [[751.11 Bearings#Anchor Bolts|EPG 751.11.2.1 Elastomeric Bearings]], [[751.11 Bearings#751.11.3.5 Anchor Bolts|EPG 751.11.3.5 Anchor Bolts]], [[751.22 Prestressed Concrete I Girders#751.22.2.7 Dowel Bars|EPG 751.22.2.7 Dowel Bars]] and [[751.22 Prestressed Concrete I Girders#751.22.3.14 Concrete Shear Blocks|EPG 751.22.3.14 Concrete Shear Blocks]] - Guidance for the design of bearing anchor bolt, dowel bar and shear block has been expanded and clarified
 +
</div>
  
3/4/20: The definitions of Categorical Exclusion, Environmental Assessment and Environmental Impact Statement were updated.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 29, 2022
 +
----
 +
[[:Category:105 Control of Work#105.15 Project Acceptance|EPG 105.15 Project Acceptance]] - Guidance for project acceptance has been clarified and updated to current practice in EPG 105.15, [[:Category:108 Prosecution and Progress#8. Date of Final Inspection|EPG 108.16.1 Informational Dates]] and [[:Category:109 Measurement and Payment#109.8 Final Acceptance and Payment (for Sec 109.8)|EPG 109.8 Final Acceptance and Payment]]
 +
</div>
  
'''[[LPA:136.4 Consultant Selection and Consultant Contract Management#Environmental.|EPG 136.4.2.4.3 Using the LPA On-Call Consultant List]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 21, 2022
 +
----
 +
[[:Category:712 Structural Steel Construction#712.1.4.1.3 Shear Connector Welding|EPG 712.1.4 Welding]] - Guidance for stud welding has been updated to align with Sec 712.6.3. Also, outdated references to field welder cards has been removed
 +
</div>
  
2/27/20: Two new categories (Environmental and Historic Preservation) have been added to the LPA on-call consultant guidance.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 20, 2022
 +
----
 +
Construction Inspection Guidance for Records to be Maintained - [[:Category:137 Construction Inspection Guidance for Records to be Maintained#137.1 Location|EPG 137.1 Location]] and [[:Category:137 Construction Inspection Guidance for Records to be Maintained#137.6 Close Out Procedure for External CM SharePoint Quality Management Documents|EPG 137.6 Close Out Procedure for External CM SharePoint Quality Management Documents]] now present updated information about how CM Division stores electronic contract documents
  
'''[[236.4 Description Writing and Titles#236.4.4 Title Services and Responsibility|EPG 236.4.4 Title Services and Responsibility]]'''
+
Guidance for PSST anchor installations has been updated and clarified. [[903.3 Ground-Mounted Sign Supports#903.3.4.3 Perforated Square Steel Tube Posts (PSST)|EPG 903.3.4.3 Perforated Square Steel Tube Posts (PSST)]]
  
2/26/20: Guidance now reflects the recent interim guidance for determining responsibilities for the ADA transition plan and other construction requirements. EPG 236.4.4 Title Datum and Allied Services was retitled "Title Services and Responsibility".
+
Seeding, Mulching and Temporary Seeding - Guidance in [[:Category:802 Mulching|EPG 802 Mulching]], [[:Category:805 Seeding|EPG 805 Seeding]], [[806.1 Erosion Control Measures|EPG 806.1 Erosion Control Measures]] and [[806.8 Storm Water Pollution Prevention Plan (SWPPP)#806.8.6.3.7.1 Temporary Seeding and Mulching (MO Specifications Sec 802 and Sec 805)|EPG 806.8.6.3.7.1 Temporary Seeding and Mulching]] reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new [https://www.modot.org/media/37677 Standard Plan 805.00 Seeding]) to promote a more effective vegetative establishment, allowing for quicker project  finalization.  MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas. New guidance for cool season and warm season grasses is available. Mulching will not be required for final seeded areas where temporary seeding is planned for temporary stabilization of areas to receive warm season grasses.  A new [[media:Table 805.2.4a.docx|Guide for Grass Species]] is available in [[:Category:805 Seeding#805.2.4 Acceptance (Sec 805.4)|EPG 805.2.4 Acceptance]] to assist with general inspection and acceptance of vegetative covers.
  
'''[[607.1 Applications|EPG 607.1 Fencing Applications]]'''
+
Pre-MASH 2016 Temporary Traffic Control Device Sunset Dates - Guidance in [[:Category:612 Impact Attenuators|EPG 612 Impact Attenuators]], [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.1 Types of Devices (MUTCD 6F.01)|EPG 616.6 Temporary Traffic Control Zone Devices]], [[616.18 Construction Inspection Guidelines for Sec 616#For Sec. 616.3.2|EPG 616.18 Construction Inspection Guidelines for Sec 616]], [[616.19 Quality Standards for Temporary Traffic Control Devices#https://epg.modot.org/index.php?title=616.6_Temporary_Traffic_Control_Zone_Devices_%28MUTCD_6F%29#616.6.84_Temporary_Traffic_Control_Signals_.28MUTCD_6F.84.29|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]], [[616.23 Traffic Control for Field Operations#616.23.2.5 Temporary Traffic Control Devices|EPG 616.23 Traffic Control for Field Operations]], [[617.1 Temporary Traffic Barriers|EPG 617.1 Temporary Traffic Barriers]], [[617.2 Construction Inspection Guidelines for Sec 617|EPG 617.2 Construction Inspection Guidelines for Sec 617]], [[:Category:1063 Temporary Traffic Control Devices#1063.2 Procedure|EPG 1063 Temporary Traffic Control Devices]] and [[:Category:1064 Temporary Concrete Traffic Barrier|EPG 1064 Temporary Concrete Traffic Barrier]] now reflects that all temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.
  
2/14/20: Guidance for installing Interstate highway fencing was revised to current practice.
+
[[:Category:403 Asphaltic Concrete Pavement#Lots|EPG 403.1.19 Acceptance of Material]] - The maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots. Any remaining quantity less than 4000 tons, that cannot be treated as a separate lot, will be combined with the previous full lot and the pay factors will be determined on the combined lot.
 +
</div>
  
'''Deck rehabilitation'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 18, 2022
 +
----
 +
Guidance Documents Needed for Property Closings - In [[236.7 Negotiation#236.7.1.13 Pre-Negotiation Preparation|EPG 236.7.1.13 Pre-Negotiation Preparation]] and [[236.7 Negotiation#236.7.4.1 Purpose|EPG 236.7.4.1 Purpose]], additional guidance is available for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company.
 +
</div>
  
2/6/20: Deck rehabilitation guidance has been updated to current methods.  Pay items in [[751.6 General Quantities#751.6.1 Index of Quantities|EPG 751.6.1 Index of Quantities]] were updated for supplementary wearing surface material. Rehabilitation design guidance was expanded in [[751.1 Preliminary Design#751.1.3 Wearing Surfaces/Rehabs/Redecks/Widenings|EPG 751.1.3 Wearing Surfaces/Rehabs/Redecks/Widenings]] and [[751.40 Widening and Repair (LFD and Not Updated)#751.40.2.2 Special Repair Zones|EPG 751.40.2.2 Special Repair Zones through EPG 751.40.3.1 Wearing Surfaces]] and added in [[:Category:216 Removals for Bridge Structures#216.1 Construction Inspection Guidance for Sec 216|EPG 216 Removals for Bridge Structures]]. Standard detailing notes were updated to reflect these revisions.  [[:Category:1039 Polymer Products|EPG 1039]] was re-titled as “Polymer Products”.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 11, 2022
 +
----
 +
In [[751.22 Prestressed Concrete I Girders#751.22.2.5 Pretensioned Anchorage Zones|EPG 751.22.2.5 Pretensioned Anchorage Zones]], the bursting resistance guidance now allows a larger number of bonded strands for many of these girders, effectively increasing the span limits for the girders. Guidance was expanded in [[751.22 Prestressed Concrete I Girders#751.22.3.2.1 Type 2 Girder|EPG 751.22.3.2.1 through 751.22.3.2.6]] to eliminate or reduce conflict between the lowest middle two strands and the B bars.
 +
</div>
  
'''[[:Category:109 Measurement and Payment#109.14 Price Adjustment for Fuel (for Sec 109.14)|EPG 109.14 Price Adjustment for Fuel]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">April 5, 2022
 +
----
 +
Guidance about the timelines for completing the Section 106 of the National Historic Preservation Act review process has been clarified in [[127.2 Historic Preservation and Cultural Resources#127.2.5 Approximate Timelines for Section 106 Compliance|EPG 127.2.5 Approximate Timelines for Section 106 Compliance]]
 +
</div>
  
1/30/20: Guidance has been coordinated with established AWP/SM practices.
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 28, 2022
 +
----
 +
Coil Ties in Prestressed Girder Webs in several [[751.50 Standard Detailing Notes#(G1.9.1)|EPG 751.50 Standard Detailing Notes]], references to web coil ties in bulb-tee and NU girders have been removed since these are now no longer being used.
 +
</div>
  
'''[[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]]'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 16, 2022
 +
----
 +
Guidance has been expanded to produce more uniform administration of delay claims. - [[:Category:109 Measurement and Payment#109.11 Compensation for Project Delays (for Sec 109.11)|EPG 109.11 Compensation for Project Delays]]
 +
</div>
  
1/30/20: Excavation guidance has been updated to address Integral End Bents, remove Semi-Deep abutments and address effects of skew.  
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">March 16, 2022
 +
----
 +
The recommended replacement age for signal cabinets was updated to 25 years from 20 years in [[902.4 Signal Installations and Equipment#902.4.2.1 Controller and Cabinet Replacement Program|EPG 902.4.2.1 Controller and Cabinet Replacement Program]].
 +
</div>
  
'''Nominal Acquisition Payment (NAP)'''
+
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">Feb 15, 2022
 
+
----
1/28/20: Guidance in [[236.6 Appraisal and Appraisal Review#D. Nominal Acquisition Payment (NAP)|EPG 236.6.3.3 Waiver Valuation]] was revised to state that NAP forms are now to be approved by the Asst. to the State Design Engineer prior to use.
+
Right of Way Mediation in [[236.7 Negotiation#Prior to offering mediation|EPG 236.7.2.19 Acquisition by Mediation]] and [[236.11 Mediation#Prior to offering mediation|EPG 236.11.1.3 Purpose]], guidance has been updated to reflect current process and procedures, including the MoDOT Impasse Letter.
 
+
</div>
'''[[121.6 STIP Amendments|EPG 121.6 STIP Amendments]]'''
 
 
 
1/28/20: Guidance has been updated to reflect current practices.
 
 
 
'''New QRG'''
 
 
 
1/22/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Retroactively_Update_Materials_Conversion_Factor.docx AWP MA Retroactively Updating Materials Conversion Factor] QRG is now available in [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101 Standard Forms]].
 
 
 
'''New QRG'''
 
 
 
1/17/20: The new [http://epg.modot.mo.gov/forms/CM/AWP_CM_Test_Equipment.doc AWP CM Test Equipment] QRG is now available in [[:Category:101 Standard Forms#AASHTOWare Project Quick Reference Guides (QRGs)|EPG 101 Standard Forms]].  
 
 
 
'''[[media:110.2 Storm Water Permit 2020.pdf|Storm Water Permit Sign]]'''
 
 
 
1/17/20: This MoDNR stormwater permit sign has been updated in [[:Category:110 State and Federal Wage Rates and Other Requirements#Storm Water Permit|EPG 110.2 Additional Posters for Federal-Aid and State-Aid Projects]].
 
 
 
'''Partial Depth Pavement Repairs'''
 
 
 
1/16/20: Guidance for the selection of different partial depth repairs has been clarified. [[:Category:613 Pavement Repair#613.1.2 Class A Partial Depth Pavement Repairs (Sec 613.20)|Class A]] and [[:Category:613 Pavement Repair#613.1.3 Class B Partial Depth Pavement Repairs (Sec 613.30)|Class B]] repair guidance was modified while new guidance for [[:Category:613 Pavement Repair#613.1.4 Class C Partial Depth Pavement Repairs (Sec 613.35)|Class C]] repairs was added.
 
 
 
'''[[236.16 Outdoor Advertising#The information provided|EPG 236.16.5.1 Application Process]]'''
 
 
 
1/15/20: Guidance was clarified.
 

Latest revision as of 12:56, 29 September 2022

September 13, 2022

Updated wording in EPG 806.1.7 Temporary Seeding, EPG 806.1.7.1 Design Considerations and EPG 806.8.6.3.7.1 Temporary Seeding and Mulching to be in sync with the July 2022 Revisions

September 8, 2022

Updated the guidance for EPG Category:129 Public Involvement

September 1, 2022

Updated figures 136.6.15 Example e106 Form and 136.6.16 LPA Project Checklist for Adverse Effects in EPG LPA:136.6 Environmental and Cultural Requirements

Updated the table in EPG 153.21 Traffic TR06 was modified and TR07 and TR30 were removed

August 31, 2022

Noise Ordinance Signing overhauled to EPG 903.5.43 Engine Brake Muffler Required Signing

July 28, 2022

Update to EPG 616.14.3.4 Work Zone Review Team - During work zone reviews, video recording is used to help viewing work zone after the formal review if there is questions of the work zone. The video recording allows to retain up to 5 buisiness days and then shall be deleted

July 25, 2022

The Bridge Inspection Rating Manual has been updated

June 29, 2022

EPG 620.6.1 School Logo Pavement Markings - This new guidance clarifies that these markings are not permitted

June 27, 2022

File Naming Convention for all eProject Documents - New guidelines are available in EPG 237.13.1 Design Contract Plans for a filing convention that is searchable without bringing undue pressure or constraint upon the districts

June 21, 2022

Pushbutton Locations - In EPG 902.6.8 Pedestrian Detectors and in the ADA Checklist, guidance has been updated to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches

June 3, 2022

EPG 236.5.25.5 Risk Assessment - Sovereign immunity limits increased in January 2022 and MoDOT's per occurrence coverage increased from $3.0 M to $3.5 M

June 1, 2022

In EPG 751.11.3.6 Girder/Beam Chairs, EPG 751.22.3.5 Strands at Girder Ends and EPG 751.22.3.7 Closed Concrete Intermediate Diaphragms through EPG 751.22.3.11 Steel Intermediate Diaphragms, guidance was revised to decrease the footprint of girder/beam chairs, clarify and expand concrete diaphragm details to incorporate larger girders, and remove web coil ties in bulb-tees and NU girders to reflect the recent change to standard drawings

May 20, 2022

EPG 907.8 Speed Trailers Deployed by Others - This new article provides guidance for speed trailer deployment to aid local law enforcement in the proper use of these devices

EPG 941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras - Guidance for the License Plate Reader (LPR) was clarified and expanded for proper LPR installations as identified through processing initial requests

May 19, 2022

EPG 747.2.2.4 HEC-RAS GEO Files for Stream Crossings - This subarticle was retitled and its guidance updated to reflect the current use of the "HEC-RAS Convertor for Open Roads Designer" spreadsheet

May 16, 2022

The guidelines, book job guidelines, JSP packages, book job JSP packages and contractor pdf files were updated in EPG 402 Bituminous Surface Leveling and EPG 409 Seal Coat

May 11, 2022

EPG 751.9.3.1.1 Anchor Bolts through EPG 751.9.3.1.4 Concrete Shear Blocks, EPG 751.11.2.1 Elastomeric Bearings, EPG 751.11.3.5 Anchor Bolts, EPG 751.22.2.7 Dowel Bars and EPG 751.22.3.14 Concrete Shear Blocks - Guidance for the design of bearing anchor bolt, dowel bar and shear block has been expanded and clarified

April 29, 2022

EPG 105.15 Project Acceptance - Guidance for project acceptance has been clarified and updated to current practice in EPG 105.15, EPG 108.16.1 Informational Dates and EPG 109.8 Final Acceptance and Payment

April 21, 2022

EPG 712.1.4 Welding - Guidance for stud welding has been updated to align with Sec 712.6.3. Also, outdated references to field welder cards has been removed

April 20, 2022

Construction Inspection Guidance for Records to be Maintained - EPG 137.1 Location and EPG 137.6 Close Out Procedure for External CM SharePoint Quality Management Documents now present updated information about how CM Division stores electronic contract documents

Guidance for PSST anchor installations has been updated and clarified. EPG 903.3.4.3 Perforated Square Steel Tube Posts (PSST)

Seeding, Mulching and Temporary Seeding - Guidance in EPG 802 Mulching, EPG 805 Seeding, EPG 806.1 Erosion Control Measures and EPG 806.8.6.3.7.1 Temporary Seeding and Mulching reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) to promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas. New guidance for cool season and warm season grasses is available. Mulching will not be required for final seeded areas where temporary seeding is planned for temporary stabilization of areas to receive warm season grasses. A new Guide for Grass Species is available in EPG 805.2.4 Acceptance to assist with general inspection and acceptance of vegetative covers.

Pre-MASH 2016 Temporary Traffic Control Device Sunset Dates - Guidance in EPG 612 Impact Attenuators, EPG 616.6 Temporary Traffic Control Zone Devices, EPG 616.18 Construction Inspection Guidelines for Sec 616, EPG 616.19 Quality Standards for Temporary Traffic Control Devices, EPG 616.23 Traffic Control for Field Operations, EPG 617.1 Temporary Traffic Barriers, EPG 617.2 Construction Inspection Guidelines for Sec 617, EPG 1063 Temporary Traffic Control Devices and EPG 1064 Temporary Concrete Traffic Barrier now reflects that all temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.

EPG 403.1.19 Acceptance of Material - The maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots. Any remaining quantity less than 4000 tons, that cannot be treated as a separate lot, will be combined with the previous full lot and the pay factors will be determined on the combined lot.

April 18, 2022

Guidance Documents Needed for Property Closings - In EPG 236.7.1.13 Pre-Negotiation Preparation and EPG 236.7.4.1 Purpose, additional guidance is available for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company.

April 11, 2022

In EPG 751.22.2.5 Pretensioned Anchorage Zones, the bursting resistance guidance now allows a larger number of bonded strands for many of these girders, effectively increasing the span limits for the girders. Guidance was expanded in EPG 751.22.3.2.1 through 751.22.3.2.6 to eliminate or reduce conflict between the lowest middle two strands and the B bars.

April 5, 2022

Guidance about the timelines for completing the Section 106 of the National Historic Preservation Act review process has been clarified in EPG 127.2.5 Approximate Timelines for Section 106 Compliance

March 28, 2022

Coil Ties in Prestressed Girder Webs in several EPG 751.50 Standard Detailing Notes, references to web coil ties in bulb-tee and NU girders have been removed since these are now no longer being used.

March 16, 2022

Guidance has been expanded to produce more uniform administration of delay claims. - EPG 109.11 Compensation for Project Delays

March 16, 2022

The recommended replacement age for signal cabinets was updated to 25 years from 20 years in EPG 902.4.2.1 Controller and Cabinet Replacement Program.

Feb 15, 2022

Right of Way Mediation in EPG 236.7.2.19 Acquisition by Mediation and EPG 236.11.1.3 Purpose, guidance has been updated to reflect current process and procedures, including the MoDOT Impasse Letter.