- 14:58, 16 June 2017 diff hist +92 m Main Page
- 14:52, 16 June 2017 diff hist -8 m 751.6 General Quantities →751.6.2.17 Excavation
- 14:29, 16 June 2017 diff hist -3 m Main Page
- 14:27, 16 June 2017 diff hist +36 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:41, 16 June 2017 diff hist -5 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 12:33, 16 June 2017 diff hist +11 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:32, 16 June 2017 diff hist -66 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:30, 16 June 2017 diff hist +57 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:03, 16 June 2017 diff hist +125 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified and corrected foundation data
- 10:42, 16 June 2017 diff hist -33 m Main Page EPG 751.22.3.15
- 10:38, 16 June 2017 diff hist +222 m 751.9 LFD Seismic Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 10:32, 16 June 2017 diff hist 0 m 751.9 LFD Seismic
- 10:28, 16 June 2017 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods)
- 10:23, 16 June 2017 diff hist 0 N File:751.22.3.15.jpg current
- 10:22, 16 June 2017 diff hist -33 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods): Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 08:58, 16 June 2017 diff hist -9 m Main Page EPG 606.1
- 08:58, 16 June 2017 diff hist +32 m 606.1 Guardrail
- 08:50, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xlsx
- 08:49, 16 June 2017 diff hist +2 m 606.1 Guardrail
- 08:46, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xls
- 08:46, 16 June 2017 diff hist +547 m 606.1 Guardrail Per CADD, added Guardrail Length of Need Calculator
- 14:40, 15 June 2017 diff hist +65 m 153.9 Design Per LPA, updated some contract titles and a few other items
- 14:02, 15 June 2017 diff hist 0 N File:902.5.29 Flashing Yellow Arrow brochure.pdf current
- 14:02, 15 June 2017 diff hist -11 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.29 Guidelines for Use of the Flashing Yellow Left Arrow: Updated link
- 13:44, 15 June 2017 diff hist +210 m Main Page EPG 751.6.2.17, EPG 747.1.6.2
- 13:38, 15 June 2017 diff hist +425 751.50 Standard Detailing Notes →J. MSE Wall Notes (Notes for Bridge Standard Drawings): Per BR, new J1.30 notes the revision of Bridge standard drawings for MSE wall for excavation
- 13:34, 15 June 2017 diff hist +427 751.24 LFD Retaining Walls →751.24.2.2 Details: Per BR, Cross-reference added for excavation and division responsibilities for preparing MSE wall plans, computing excavation class and quantities.
- 13:20, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7b.jpg current
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7a.jpg current
- 13:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 6.jpg current
- 13:18, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5b.jpg current
- 13:18, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:17, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5a.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 4.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 3.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 2.jpg current
- 13:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 1.jpg current
- 13:15, 15 June 2017 diff hist 0 m 751.6 General Quantities
- 13:14, 15 June 2017 diff hist 0 N File:751.6.2.17.jpg current
- 13:13, 15 June 2017 diff hist 0 m 751.6 General Quantities →751.6.2.17 Excavation
- 13:12, 15 June 2017 diff hist 0 N File:751.6.2.17 earth work.jpg current
- 13:11, 15 June 2017 diff hist 0 N File:751.6.2.17 Semi Deep Case 1 Section AA.jpg current
- 13:11, 15 June 2017 diff hist +6,439 751.6 General Quantities →751.6.2.17 Excavation: Per BR, different possible cases for MSE wall excavation added
- 10:49, 15 June 2017 diff hist +175 m Main Page EPG 620, EPG 1048
- 10:40, 15 June 2017 diff hist -1,423 620.12 Construction Inspection for Sec 620 Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 10:31, 15 June 2017 diff hist -310 620.1 General (MUTCD Chapter 3A) Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 10:20, 15 June 2017 diff hist +97 Category:1048 Pavement Marking Material →1048.2.1 Type 1 and Type 2 Preformed Marking Tape: Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 10:11, 15 June 2017 diff hist 0 m Category:620 Pavement Marking current
- 10:10, 15 June 2017 diff hist 0 N File:620 decision 2017.jpg current
- 10:10, 15 June 2017 diff hist 0 N File:620 Durable.doc current
- 10:10, 15 June 2017 diff hist +321 Category:620 Pavement Marking Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 08:34, 15 June 2017 diff hist +3,710 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, division responsibilities for preparing MSE wall plans, computing excavation quantities and locations added
- 15:22, 14 June 2017 diff hist -2 m Main Page
- 13:56, 9 June 2017 diff hist -58 m Main Page EPG 402, EPG 450, EPG 751.24, EPG 760
- 12:48, 9 June 2017 diff hist 0 N File:760.4.2 FAQ 2017.docx current
- 12:48, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures
- 12:47, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures Per TP, also updated FAQ document
- 12:37, 9 June 2017 diff hist +1,465 Category:760 General Construction Inspection for Structures →760.4 Vertical Clearance: Per TP, expanded and clarified guidance for the measurement and reporting of vertical clearance.
- 11:36, 9 June 2017 diff hist +137 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:29, 9 June 2017 diff hist -94 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:20, 9 June 2017 diff hist +446 Category:450 Bituminous Pavement Design →450.3 Layer Design: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 11:15, 9 June 2017 diff hist +1,745 Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 10:17, 9 June 2017 diff hist +436 m LPA:136.13 LPA Policy Changes EPG 136.6.4.9
- 10:15, 9 June 2017 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way
- 10:12, 9 June 2017 diff hist +140 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way: Per Hist. Pres., guidance for env'l clearance help clarified
- 13:45, 8 June 2017 diff hist -282 m Main Page EPG 751.50
- 13:29, 8 June 2017 diff hist +89 m 751.50 Standard Detailing Notes
- 12:33, 8 June 2017 diff hist +1,386 m 751.50 Standard Detailing Notes Per BR, added Redeck Standard Notes and made minor revisions to Notes B3.32 and B3.33.
- 10:51, 8 June 2017 diff hist +101 m Main Page
- 10:48, 8 June 2017 diff hist +129 m Main Page EPG 134
- 10:42, 8 June 2017 diff hist -2 m Category:101 Standard Forms Per LPA, updated Submittal to Professional Services Committee
- 10:41, 8 June 2017 diff hist 0 N File:134.3.1 2017.doc current
- 10:41, 8 June 2017 diff hist 0 N File:134.2.4 2017.doc current
- 10:41, 8 June 2017 diff hist 0 m Category:134 Engineering Professional Services
- 10:40, 8 June 2017 diff hist 0 Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2.2 June 2017.docx current
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2 2017.doc current
- 10:37, 8 June 2017 diff hist +6,789 m Category:134 Engineering Professional Services Per LPA, revised guidance for eAgreement (electronic vs wet signatures) workflow changes and to incorporate more-than-Taking Care of the System (TSCO) planning studies.
- 13:49, 7 June 2017 diff hist +13 m Main Page
- 13:31, 7 June 2017 diff hist -5 m Main Page EPG 903.15.3
- 12:13, 7 June 2017 diff hist +329 m 903.14 Memorial Signs →903.15.3 Heroes Way Interchange Program: Per TS, updated guidance to reflect current practice.
- 08:39, 7 June 2017 diff hist 0 N File:Main Page June 7, 2017.jpg current
- 08:39, 7 June 2017 diff hist -106 m Main Page
- 07:22, 7 June 2017 diff hist 0 N File:101 Workforce Pilot Program Employee Notification.pdf current
- 07:21, 7 June 2017 diff hist 0 N File:101 Sample Company Workforce Diversity Job Special Provision Action Plan.docx current
- 07:21, 7 June 2017 diff hist 0 N File:101 Contractor's Monthly New Employee Report.pdf current
- 07:21, 7 June 2017 diff hist -4 m Category:101 Standard Forms →External Civil Rights
- 07:20, 7 June 2017 diff hist +403 m Category:101 Standard Forms Three new forms from ECR
- 10:02, 6 June 2017 diff hist +296 m Category:900 TRAFFIC CONTROL
- 09:59, 6 June 2017 diff hist +300 m Category:1000 MATERIALS
- 09:57, 6 June 2017 diff hist +300 m Category:800 ROADSIDE DEVELOPMENT
- 09:54, 6 June 2017 diff hist +298 m Category:109 Measurement and Payment
- 09:53, 6 June 2017 diff hist +298 m Category:105 Control of Work
- 09:52, 6 June 2017 diff hist +301 m Category:101 Standard Forms
- 14:33, 5 June 2017 diff hist 0 m Main Page
- 09:27, 5 June 2017 diff hist -153 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per DE, updated language to current Agreements Review Group's process for reviewing DE10 and DE11
- 09:25, 5 June 2017 diff hist -346 m 153.9 Design Per DE, updated language to EPG 153.8 DE Table and EPG 235.2.3 to current Agreements Review Group process for reviewing DE10 and DE11.
- 13:06, 2 June 2017 diff hist -5 m LPA:136.4 Consultant Selection and Consultant Contract Management updated broken 23 CFR 172.3 link
- 12:21, 2 June 2017 diff hist +8 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group further clarified that Permitted Combination of Projects for lettings is no longer allowed.
- 08:25, 2 June 2017 diff hist +2 m Main Page EPG 103.1
- 08:23, 2 June 2017 diff hist -449 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.
- 07:12, 2 June 2017 diff hist -7 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, updated link to MoDOT Workforce JSP Cumulative Workforce Hours Report
- 13:42, 1 June 2017 diff hist -51 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: updated link
- 13:20, 1 June 2017 diff hist +2 m Main Page
- 10:23, 1 June 2017 diff hist +8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 10:44, 31 May 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, clarified Landscape Architects as "Professional Landscape Architects".
- 09:58, 31 May 2017 diff hist +4 m Category:101 Standard Forms →Construction and Materials
- 09:53, 31 May 2017 diff hist -466 m Category:108 Prosecution and Progress
- 09:51, 31 May 2017 diff hist +466 m Category:108 Prosecution and Progress Per CM, updated link to Final Acceptance Report (C-239)
- 09:45, 31 May 2017 diff hist +498 m Category:101 Standard Forms →Construction and Materials: Per CM, updated several links
- 15:09, 30 May 2017 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239)
- 15:08, 30 May 2017 diff hist +62 m Category:108 Prosecution and Progress Per CM, added link to Final Acceptance Report (C-239)
- 13:28, 30 May 2017 diff hist 0 N File:108.16.2 Sample Final Inspection Letter 2017.pdf current
- 13:28, 30 May 2017 diff hist +5 m Category:108 Prosecution and Progress Per CM, updated Fig. 108.16.2, Sample Final Inspection letter, by adding a statement to remind contractors to upload any remaining QC documents.
- 12:55, 30 May 2017 diff hist +49 m Main Page EPG 101
- 12:30, 30 May 2017 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:31, 30 May 2017 diff hist +7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Envir'l, clarified Consent Decree Initial Set-Up QRG per no. of disturbed acres when adding a project to database as well as prerequisite dates for Insp.
- 14:29, 26 May 2017 diff hist -526 m Category:240 Maintenance and Emergency Crossovers
- 14:52, 25 May 2017 diff hist 0 m Main Page
- 13:33, 25 May 2017 diff hist +10 m Main Page
- 08:29, 24 May 2017 diff hist +29 m LPA:136.13 LPA Policy Changes
- 08:28, 24 May 2017 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 N File:Fig.136.3.20 2017.docx
- 08:26, 24 May 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20, BEAP Project Tracking Form
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 3 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 2 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page May 22, 2017.jpg current
- 14:30, 22 May 2017 diff hist +45 m Main Page
- 10:14, 22 May 2017 diff hist +307 m 153.9 Design Per DE, revised who need to review several agreements
- 14:59, 19 May 2017 diff hist 0 N File:Main Page May 19, 2017.jpg current
- 14:59, 19 May 2017 diff hist -424 m Main Page EPG 751
- 13:45, 19 May 2017 diff hist +126 m 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:35, 19 May 2017 diff hist 0 N File:751.39 2017.jpg current
- 13:34, 19 May 2017 diff hist -144 m 751.39 Pile Footings Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:28, 19 May 2017 diff hist +3 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.5 Wing & Detached Wing Walls
- 13:27, 19 May 2017 diff hist 0 N File:751.35.3.5 detached wing 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.5 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.4 May 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent
- 13:25, 19 May 2017 diff hist 0 N File:751.35.3.3 May 2017.jpg current
- 13:25, 19 May 2017 diff hist +136 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3 Dimensions: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:09, 19 May 2017 diff hist +2 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 safety barrier.jpg current
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 part section.jpg current
- 13:05, 19 May 2017 diff hist 0 N File:751.34.3.2.jpg current
- 13:05, 19 May 2017 diff hist +10 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.2.2 Loads
- 13:03, 19 May 2017 diff hist 0 N File:751.34.2.2 detached wing.jpg current
- 13:02, 19 May 2017 diff hist 0 N File:751.34.2.2 elevation.jpg current
- 13:02, 19 May 2017 diff hist +55 m 751.34 Concrete Pile Cap Non-Integral End Bents Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:42, 19 May 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.3 part elev 2017.jpg current
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.2 2017.jpg current
- 12:33, 19 May 2017 diff hist +10 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 15:04, 17 May 2017 diff hist +8 m Main Page
- 15:03, 17 May 2017 diff hist 0 N File:Main Page May 17, 2017.jpg current
- 15:03, 17 May 2017 diff hist -350 m Main Page
- 10:49, 17 May 2017 diff hist +77 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent: Per BR, further clarified girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17
- 10:43, 17 May 2017 diff hist 0 N File:751.22.3.10 part plan skewed 2017.jpg current
- 10:43, 17 May 2017 diff hist +255 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17 revision
- 10:04, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 17 2017.jpg current
- 10:02, 17 May 2017 diff hist +3 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:00, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 2017.jpg current
- 10:00, 17 May 2017 diff hist +4 m 751.11 Bearings →751.11.3 Details: Per BR, further clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders w/ info inadvertently left out by division
- 13:37, 16 May 2017 diff hist 0 N File:134.2.2.2 May 16 2017.docx current
- 13:36, 16 May 2017 diff hist +12 m Category:134 Engineering Professional Services further, minor update of Form 134.2.2.2
- 13:35, 16 May 2017 diff hist +3 m Category:101 Standard Forms minor update of Form 134.2.2.2
- 13:26, 16 May 2017 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.3.6.2 Shear Reinforcement: Per BR, added a common, available wire size that was inadvertently excluded in the original Nov 22, '17 revision.
- 12:12, 16 May 2017 diff hist +3 m 238.3 Route Surveying updated GPS reference station network link
- 12:09, 16 May 2017 diff hist 0 m Category:134 Engineering Professional Services updated GPS Reference Station network link
- 15:22, 12 May 2017 diff hist -2 m Main Page
- 15:01, 12 May 2017 diff hist -7 m Category:101 Standard Forms Per LPA, updated two forms: Submittal to Professioanl Services Committee and the Consultant Rating Form
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.5.1 May 2017.doc current
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.2 May 2017.docx current
- 14:59, 12 May 2017 diff hist -28 m Category:134 Engineering Professional Services Per LPA, updated two forms, Figs. 134.2.2.2 and 134.2.2.5.1, with minor updates
- 12:56, 12 May 2017 diff hist -137 m Main Page EPG 236.7.2.3
- 12:37, 12 May 2017 diff hist 0 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, increased the minimum offer of prompt offer of just compensation from $300 to $500
- 08:53, 12 May 2017 diff hist -1 m Main Page
- 08:19, 12 May 2017 diff hist 0 N File:616.13.7.1 2017.xlsx current
- 08:19, 12 May 2017 diff hist +10 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Pacing Worksheet
- 09:46, 11 May 2017 diff hist -14 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): updated jsp link
- 08:47, 10 May 2017 diff hist -13 m Main Page EPG 402 and EPG 409
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC MoDOT 2017.pdf current
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC Contractor 2017.pdf current
- 08:29, 10 May 2017 diff hist +10 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the MoDOT/Contractor files were further updated
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat MoDOT.pdf current
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat Contractor.pdf
- 07:32, 10 May 2017 diff hist 0 File:409 FY2018 Contract Seal Coat Guidelines.docx uploaded a new version of "Image:409 FY2018 Contract Seal Coat Guidelines.docx" current
- 07:30, 10 May 2017 diff hist 0 N File:409 FY2018 Contract Seal Coat Guidelines.docx
- 07:30, 10 May 2017 diff hist -1,223 m Category:409 Seal Coat Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC MoDOT.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC Contractor.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 FY2018 Contract Leveling Coat Guidelines.docx current
- 07:19, 10 May 2017 diff hist -1,085 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 14:49, 5 May 2017 diff hist 0 m Main Page
- 14:33, 4 May 2017 diff hist +265 m 171.5 Drainage Added link to Culvert Pipe Replacement video
- 12:38, 3 May 2017 diff hist 0 m Main Page
- 09:02, 3 May 2017 diff hist -107 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.2 No-Passing Zone Pavement Markings and Warrants (MUTCD Section 3B.02): Per TR, removed an MUTCD clause since we do not use the NO PASSING ZONE sign on a statewide basis
- 08:12, 3 May 2017 diff hist +1,440 m 153.19 Multimodal Per MO, updated tables to relfect current contract listings
- 12:12, 2 May 2017 diff hist +302 m Category:101 Standard Forms →Construction and Materials: Per CM, added to links: 2017 Statewide Rail Cable Fence Spreadsheets (Grading and No Grading)
- 11:19, 2 May 2017 diff hist +8 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, dashes allowed
- 11:04, 1 May 2017 diff hist +61 m Main Page EPG 137
- 10:12, 1 May 2017 diff hist -1 m Category:137 Construction Inspection Guidance for Records to be Maintained
- 10:10, 1 May 2017 diff hist -18 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:09, 1 May 2017 diff hist 0 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:08, 1 May 2017 diff hist 0 N File:137.3 good 2017.jpg current
- 10:07, 1 May 2017 diff hist -4,885 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, updated terminology for storing project documents, which are now stored in eProjects rather than the CIA (V drive)
- 08:45, 1 May 2017 diff hist -1 m Main Page
- 15:27, 28 April 2017 diff hist -1 m Help Article →Division Contacts
- 14:20, 28 April 2017 diff hist -90 m 236.15 Requests from Cities for Annexations
- 14:20, 28 April 2017 diff hist -2,004 m 236.15 Requests from Cities for Annexations Per CCO, updated link to Voluntary Annexation Petition
- 12:34, 28 April 2017 diff hist 0 m Main Page
- 14:30, 27 April 2017 diff hist +179 m 751.8 LRFD Concrete Box Culverts →751.8.1.5 Precast Culvert: Per BR, minor clarification for precast box culvert pay item and quantity tabulations
- 12:11, 27 April 2017 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:09, 27 April 2017 diff hist -59 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, removed archaic statement requiring MoDOT to approve subcontracts.
- 14:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 26 2017.doc current
- 14:50, 26 April 2017 diff hist +3 m Category:101 Standard Forms Per LPA, updated Fig. 134.2.2.5.1
- 14:49, 26 April 2017 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2.5.1
- 14:42, 26 April 2017 diff hist +37 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:34, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:33, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 10:50, 26 April 2017 diff hist +12 m Category:101 Standard Forms Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 2017.doc current
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.2 April 2017.docx current
- 10:49, 26 April 2017 diff hist +42 m Category:134 Engineering Professional Services Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:34, 26 April 2017 diff hist 0 N File:134.2.2.5.1 2017.doc current
- 10:22, 26 April 2017 diff hist 0 N File:134.2.2.2 2017.docx current
- 10:21, 26 April 2017 diff hist -281 m Category:134 Engineering Professional Services Per LPA, updated two forms: Fig. 134.2.2.2 Solicitations and Request Letter, Fig. 134.2.2.5.1 Consultant Rating Form
- 10:16, 26 April 2017 diff hist -91 m Category:101 Standard Forms Per LPA, updated two forms
- 07:21, 26 April 2017 diff hist +1 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.1 Reinforcing Holes: minor correction, per BR
- 14:33, 25 April 2017 diff hist +127 m Main Page EPG 460.3.13
- 13:59, 25 April 2017 diff hist +1,403 m 460.3 Plant Inspection Per CM, new guidance for handling failing binder samples on projects and when additional testing which may take place. Also, recommendations for penalties for failing binders at the different levels.
- 14:25, 21 April 2017 diff hist -257 m Category:702 Load-Bearing Piles →702.1 Pile Types and Testing: Per BR, removed archaic info
- 10:43, 21 April 2017 diff hist -551 m Category:702 Load-Bearing Piles Per BR, minor editorial revisions.
- 07:10, 21 April 2017 diff hist -16 m Main Page
- 14:17, 20 April 2017 diff hist -4 m Main Page
- 13:56, 20 April 2017 diff hist +1 m Main Page
- 13:42, 20 April 2017 diff hist -3 m Category:101 Standard Forms →Construction and Contractor Related
- 13:31, 20 April 2017 diff hist 0 m Main Page
- 13:28, 20 April 2017 diff hist +89 m Main Page
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 19, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page 2 April 20, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 20, 2017.jpg current
- 13:22, 20 April 2017 diff hist +1,454 m Main Page
- 11:15, 20 April 2017 diff hist +287 m 751.9 LFD Seismic Per BR, added "Additional Info" box linking to the Bridge Seismic Design Process Flowchart
- 12:47, 19 April 2017 diff hist +58 m Main Page
- 15:02, 18 April 2017 diff hist 0 m Main Page
- 07:08, 18 April 2017 diff hist 0 N File:104.6 Bridge Scoping Checklist.docx current
- 07:08, 18 April 2017 diff hist -12 m 104.6 Project Scoping Checklists Per BR, updated Bridge Scoping Checklist
- 14:24, 17 April 2017 diff hist +157 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR and CM, added form, MoDOT Workforce Pre-Construction Diversity Plan Report.
- 09:10, 14 April 2017 diff hist +101 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.4 Automated Flagger Assistance Devices (MUTCD 6E.04): added link
- 09:08, 14 April 2017 diff hist +101 m 616.19 Quality Standards for Temporary Traffic Control Devices added link
- 09:05, 14 April 2017 diff hist +422 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: inserted links
- 08:58, 14 April 2017 diff hist -6 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02)
- 08:49, 14 April 2017 diff hist +1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 08:46, 14 April 2017 diff hist +52 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02): inserted link
- 10:59, 13 April 2017 diff hist 0 N File:903.7.49.1 2017.jpg current
- 10:59, 13 April 2017 diff hist +5 m 903.7 Conventional Road Guide Signs →903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50): Per TS, updated Fig. 903.7.49.1 to clarify proper use of signs
- 11:08, 12 April 2017 diff hist -4 m Main Page
- 10:46, 12 April 2017 diff hist +15 m Main Page
- 10:44, 12 April 2017 diff hist 0 N File:Main Page 4 April 12, 2017.jpg current
- 10:44, 12 April 2017 diff hist 0 N File:Main Page 3 April 12, 2017.jpg current
- 10:44, 12 April 2017 diff hist 0 N File:Main Page 2 April 12, 2017.jpg current
- 10:44, 12 April 2017 diff hist 0 N File:Main Page April 12, 2017.jpg current
- 10:43, 12 April 2017 diff hist -618 m Main Page
- 07:13, 12 April 2017 diff hist +50 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings): Per BR, minor clarifications
- 14:37, 11 April 2017 diff hist +206 m 236.3 Administration Per RW, updated links
- 14:27, 11 April 2017 diff hist -1 m Main Page
- 14:22, 11 April 2017 diff hist -9 m Category:409 Seal Coat
- 13:56, 11 April 2017 diff hist +239 m Main Page EPG 751
- 13:21, 11 April 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.1 Reinforcing Holes
- 13:20, 11 April 2017 diff hist 0 N File:751.35.5.1 end of girder.jpg current
- 13:20, 11 April 2017 diff hist 0 N File:751.35.5.1 end of stringer.jpg current
- 13:19, 11 April 2017 diff hist 0 N File:751.35.3.4 2017.jpg current
- 13:18, 11 April 2017 diff hist 0 N File:751.35.3.3 2017.jpg current
- 13:17, 11 April 2017 diff hist +290 m 751.35 Concrete Pile Cap Integral End Bents Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:39, 11 April 2017 diff hist 0 N File:751.22.3.10 part plan skewed.jpg current
- 12:38, 11 April 2017 diff hist -62 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:28, 11 April 2017 diff hist -35 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:27, 11 April 2017 diff hist +19 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:25, 11 April 2017 diff hist 0 N File:751.11.3.6 side 2017.jpg current
- 12:24, 11 April 2017 diff hist 0 N File:751.11.3.6 beam chair.jpg current
- 12:24, 11 April 2017 diff hist 0 N File:751.11.3.6 front elevation 2017.jpg current
- 12:24, 11 April 2017 diff hist +150 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:22, 11 April 2017 diff hist +24 m 751.50 Standard Detailing Notes →G1. Concrete Bents
- 11:12, 11 April 2017 diff hist +3 m LPA:136.13 LPA Policy Changes
- 11:12, 11 April 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:11, 11 April 2017 diff hist 0 N File:136.9.3 April 11 2017.docx
- 11:11, 11 April 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE) Fig 136.9.3 further corrected
- 11:02, 11 April 2017 diff hist +18 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per CM, minor clarification
- 10:57, 11 April 2017 diff hist +6 m LPA:136.13 LPA Policy Changes
- 10:56, 11 April 2017 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 10:56, 11 April 2017 diff hist 0 N File:136.9.3 April 2017.docx
- 10:55, 11 April 2017 diff hist +42 m LPA:136.9 Plans, Specs and Estimates (PSE) minor correction for Fig. 136.9.3
- 13:22, 10 April 2017 diff hist +63 m Main Page EPG 750.7.3
- 12:53, 10 April 2017 diff hist +1 m 750.7 Non-Hydraulic Considerations →750.7.3.2 Hydraulic Requirements
- 12:46, 10 April 2017 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.3.2 Hydraulic Requirements
- 12:45, 10 April 2017 diff hist 0 N File:750.7.3.2.jpg current
- 12:45, 10 April 2017 diff hist -539 m 750.7 Non-Hydraulic Considerations →750.7.3 Environmental Requirements: Per BR, updated with the new Corps of Engineers Regional Condition, which affects culvert design.
- 15:21, 7 April 2017 diff hist -2 m 620.3 Roundabout Markings (MUTCD Chapter 3C) →620.3.1 General (MUTCD Section 3C.1)
- 15:16, 7 April 2017 diff hist -4 m 748.2 Roadway Design Criteria →748.2.2.4 Replacement Structures
- 15:14, 7 April 2017 diff hist -2 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal
- 15:10, 7 April 2017 diff hist -2 m 751.22 Prestressed Concrete I Girders
- 15:08, 7 April 2017 diff hist -2 m Category:126 Location Study and Alternatives Analysis
- 15:07, 7 April 2017 diff hist -2 m Category:747 Bridge Reports and Layouts
- 15:05, 7 April 2017 diff hist -3 m 321.2 Geotechnical Guidelines →321.2.3.5 Practical Considerations
- 15:04, 7 April 2017 diff hist -6 m 751.38 Spread Footings
- 15:02, 7 April 2017 diff hist -8 m Category:806 Pollution, Erosion and Sediment Control
- 14:59, 7 April 2017 diff hist -4 m Category:105 Control of Work
- 14:50, 7 April 2017 diff hist -2 m Category:703 Concrete Masonry Construction →703.1.11.1 Form Construction
- 14:47, 7 April 2017 diff hist -4 m Category:123 Federal-Aid Highway Program
- 14:45, 7 April 2017 diff hist -4 m Category:1029 Fabricating Prestressed Concrete Members for Bridges
- 14:43, 7 April 2017 diff hist -4 m Category:239 Construction Inspection Guidelines for Final Plans →239.14 Roadway Cross-sections
- 14:42, 7 April 2017 diff hist -2 m Category:108 Prosecution and Progress →108.11 Termination of Contract for Convenience of the Commission
- 14:41, 7 April 2017 diff hist -2 m Category:774 Cathodic Protection →774.1.3 Design Guidelines
- 14:39, 7 April 2017 diff hist -2 m 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation →Commentary on EPG 321.3.5 Uncertainty Modifiers to Account for Quantity of Tests
- 14:37, 7 April 2017 diff hist -4 m 320.1 Preliminary Geotechnical Report
- 14:35, 7 April 2017 diff hist -12 m 616.5 Flagger Control (MUTCD Chapter 6E)
- 14:33, 7 April 2017 diff hist -3 m 750.1 Open Channels →750.1.4.3.2 Step-Backwater Analysis
- 14:32, 7 April 2017 diff hist -2 m 147.1 Alternative Technical Concepts →147.1.2 Cons of ATCs
- 14:30, 7 April 2017 diff hist -6 m 910.3 Dynamic Message Signs (DMS)
- 14:28, 7 April 2017 diff hist -4 m Category:409 Seal Coat
- 14:26, 7 April 2017 diff hist -4 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation
- 14:25, 7 April 2017 diff hist -2 m Category:235 Preliminary Plans →235.8.1 Exemptions
- 14:23, 7 April 2017 diff hist -2 m 620.1 General (MUTCD Chapter 3A) →620.1.4.2 Contrast Marking
- 14:23, 7 April 2017 diff hist -3 m 620.12 Construction Inspection for Sec 620 →620.12.7.2 Construction Requirements (Sec 620.90.3)
- 14:22, 7 April 2017 diff hist -2 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.4 Advance Warning Area (MUTCD 6C.04)
- 14:21, 7 April 2017 diff hist -2 m 901.16 Construction Inspection Guidelines for Sec 901
- 14:19, 7 April 2017 diff hist -4 m 750.3 Bridges →750.3.1 Hydraulic Considerations for Bridge Layout
- 14:17, 7 April 2017 diff hist -2 m 640.1 Pavement Drainage →640.1.2.4 Intercept on Continuous Grade
- 14:16, 7 April 2017 diff hist -2 m 607.1 Applications
- 14:14, 7 April 2017 diff hist -2 m 770.8 Maintenance of Bridge Substructure →770.8.2 Timber Piling and Caps
- 14:01, 7 April 2017 diff hist -2 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.5 Work Affecting Pedestrian and Bicycle Facilities (MUTCD 6G.05)
- 14:00, 7 April 2017 diff hist -2 m Category:413 Surface Treatments and Preventive Maintenance current
- 13:59, 7 April 2017 diff hist -2 m 748.4 Headwater and Backwater →748.4.1 Headwater
- 13:57, 7 April 2017 diff hist -2 m 616.20 Flagger Training
- 13:56, 7 April 2017 diff hist -2 m 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance →570.5.1.1 Material current
- 13:55, 7 April 2017 diff hist -2 m Category:1045 Paint for Structural Steel →1045.2.6 Polyurethane System G Final Coating
- 13:54, 7 April 2017 diff hist -2 m 902.2 Traffic Control Signals (MUTCD Chapter 4B)
- 13:54, 7 April 2017 diff hist -2 m Category:1019 Cement →1019.3 Sampling
- 13:52, 7 April 2017 diff hist -2 m Category:642 Pedestrian Facilities
- 13:51, 7 April 2017 diff hist -4 m 640.2 Median Drainage current
- 13:51, 7 April 2017 diff hist -2 m 902.8 Traffic Control Signals and Hybrid Beacons for Emergency Vehicle Access (MUTCD Chapter 4G) →902.8.4 Emergency-Vehicle Hybrid Beacons (MUTCD Section 4G.04)
- 13:49, 7 April 2017 diff hist -2 m 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)
- 13:49, 7 April 2017 diff hist -2 m Category:605 Underdrainage →605.4.2 Underdrain Installation
- 13:47, 7 April 2017 diff hist -2 m 620.8 Islands →620.8.4 Island Marking Colors (MUTCD Section 3I.04)
- 13:46, 7 April 2017 diff hist -2 m 902.13 Lane-Use Control Signals (MUTCD Chapter 4M) →902.13.3 Design of Lane-Use Control Signals (MUTCD Section 4M.03) current
- 13:45, 7 April 2017 diff hist -2 m 616.2 Fundamental Principles (MUTCD Chapter 6B) current
- 13:44, 7 April 2017 diff hist -3 m Category:143 Practical Design →143.2.2 Grading
- 13:43, 7 April 2017 diff hist -6 m 321.1 Design of Earth Slopes
- 13:41, 7 April 2017 diff hist -6 m 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
- 13:39, 7 April 2017 diff hist -6 m 902.10 Traffic Control Signals for Freeway Entrance Ramps (MUTCD Chapter 4I) →902.10.2 Design of Freeway Entrance Ramp Control Signals (MUTCD Section 4I.02)
- 12:33, 7 April 2017 diff hist -151 m 606.2 Guard Cable →606.2.5 Maintenance and Repair: Per MT, EPG 120 Interstate Maintenance Expectations was recommended to be removed from the EPG with no replacement.
- 12:31, 7 April 2017 diff hist -74 m Category:171 Maintenance Policy and Operations Per MT, MT is removing references to maintaining clear zones and is, instead, using policy in EPG 822 for all RW areas. RDS(E10) deleted.
- 12:29, 7 April 2017 diff hist -245 m 171.6 Roadsides →171.6.4 Vegetation Management: Per MT, MT is removing references to maintaining clear zones and is, instead, using policy in EPG 822 for all RW areas. RDS(E10) deleted.
- 09:08, 7 April 2017 diff hist -618 m 750.2 Culverts Per BR, revised to correlate with 4/9/2015 EPG 750.7.3 Corps of Engineers Regional Condition affecting culvert design revision
- 15:06, 6 April 2017 diff hist -47 m Main Page EPG 751.50
- 14:53, 6 April 2017 diff hist +844 m 751.50 Standard Detailing Notes →H7. Slab Drains: Per BR, correlated slab drain notes with all the slab drain standard drawings.
- 12:56, 6 April 2017 diff hist +482 m 153.5 Bridge Per BR and Commission, added BR19 info
- 13:19, 5 April 2017 diff hist -37 m 902.16 The Mobility Plan – Effective Arterial Management removed archaic link
- 12:58, 5 April 2017 diff hist +17 m 153.13 Highway Safety Per HS and Commission, provided guidance for HS05
- 12:43, 5 April 2017 diff hist -78 m Category:100 GENERAL Per MT, EPG 120 Interstate Maintenance Expectations was recommended to be removed from the EPG with no replacement.
- 12:39, 5 April 2017 diff hist -2,656 m 120.9 Uninterrupted Traffic Flow current
- 12:38, 5 April 2017 diff hist -2,072 m 120.8 Welcome Centers current
- 12:37, 5 April 2017 diff hist -3,124 m 120.7 Drainage Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:37, 5 April 2017 diff hist -5,084 m 120.6 Roadsides Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:36, 5 April 2017 diff hist -4,803 m 120.5 Roadside Features Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:36, 5 April 2017 diff hist -6,308 m 120.4 Traffic Control Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:35, 5 April 2017 diff hist -4,394 m 120.3 Bridges Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:35, 5 April 2017 diff hist -2,903 m 120.2 Shoulders Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:34, 5 April 2017 diff hist -4,355 m 120.1 Pavements Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:34, 5 April 2017 diff hist -10,311 m Category:120 Interstate Maintenance Expectations Per MT, EPG 120 was recommended to be removed from the EPG with no replacement. current
- 09:10, 5 April 2017 diff hist -640 m Main Page EPG 127.4
- 08:24, 5 April 2017 diff hist +72 m 127.4 Wetlands and Streams →127.4.1.1 Overview
- 08:19, 5 April 2017 diff hist +901 m 127.4 Wetlands and Streams →127.4.1.1 Overview: Per BR, added guidance for determination of stream classification.
- 09:52, 4 April 2017 diff hist +468 m 153.7 Construction and Materials Per CM and Commission, provided guidance for CM02 and CM14
- 08:45, 4 April 2017 diff hist +98 m 153.22 Transportation Planning Per TP and Commission, provided guidance for TP04
- 13:33, 3 April 2017 diff hist +48 m 237.5 Special Provisions →237.5.1 Job Special Provisions: updated link
- 13:32, 3 April 2017 diff hist -11 m 237.5 Special Provisions updated JSP link
- 12:53, 3 April 2017 diff hist +1 m Main Page
- 11:47, 30 March 2017 diff hist -53 m Category:101 Standard Forms →Checklist: Per LPA and CM, updated D-12 link
- 11:46, 30 March 2017 diff hist 0 N File:D-12 Form.docx current
- 11:45, 30 March 2017 diff hist -106 m 237.9 Submission of Plans and Supporting Documents Per LPA and CM, updated D-12 link
- 14:59, 29 March 2017 diff hist -13 m Category:747 Bridge Reports and Layouts Per BR, updated link
- 11:05, 29 March 2017 diff hist 0 m Main Page
- 10:45, 29 March 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 10:43, 29 March 2017 diff hist -544 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, updated A1.3
- 10:36, 29 March 2017 diff hist 0 m 751.36 Driven Piles →751.36.2 Steel Pile
- 10:35, 29 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing
- 08:41, 29 March 2017 diff hist +418 m Main Page Figs. 616.6.87.1 and .2
- 08:39, 29 March 2017 diff hist -351 m 153.5 Bridge Per Commission, removed unused BR14
- 08:29, 29 March 2017 diff hist 0 N File:Fig 616.6.87.2 2017.jpg current
- 08:29, 29 March 2017 diff hist +10 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per CM, revised two location notes and the color of the rumbles in the legend to aid designers in completing temporary traffic control plans.
- 08:27, 29 March 2017 diff hist 0 N File:Fig 616.6.87.1 2017.jpg current
- 08:25, 29 March 2017 diff hist 0 N File:Fig 616.6.87.1 2017.pdf
- 15:38, 28 March 2017 diff hist +216 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 15:36, 28 March 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 15:35, 28 March 2017 diff hist 0 N File:136.9.3 2017.docx
- 15:35, 28 March 2017 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, amended Fig 136.3.9 to reflect changes made to EPG on Wage Rate. Deleted State Only Prevailing wage option in section 9.
- 12:32, 28 March 2017 diff hist -8 m 153.23 Utility updated links
- 12:25, 28 March 2017 diff hist +53 m 153.23 Utility updated links
- 12:18, 28 March 2017 diff hist -13 m 153.19 Multimodal Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan, Jenni Jones and Comm Secr, updated tables to relfect current contract listings
- 14:29, 27 March 2017 diff hist 0 N File:153.8 DE07 Instr 2017.pdf current
- 14:29, 27 March 2017 diff hist +5 m 153.9 Design
- 14:29, 27 March 2017 diff hist 0 N File:153.10 FS08 Instr 2017.pdf current
- 14:28, 27 March 2017 diff hist +5 m 153.11 Financial Services
- 13:46, 27 March 2017 diff hist +203 m Main Page E 153
- 09:40, 27 March 2017 diff hist -6 m 153.10 Design – Escrow
- 09:37, 27 March 2017 diff hist +18 m 153.10 Design – Escrow
- 09:37, 27 March 2017 diff hist +18 m 153.9 Design
- 09:36, 27 March 2017 diff hist +18 m 153.8 Customer Relations
- 09:35, 27 March 2017 diff hist +18 m 153.7 Construction and Materials
- 09:34, 27 March 2017 diff hist +6 m 153.5 Bridge
- 09:23, 27 March 2017 diff hist +351 m 153.5 Bridge Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:05, 27 March 2017 diff hist +222 m 153.7 Construction and Materials Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:51, 27 March 2017 diff hist +763 m 153.9 Design Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:19, 27 March 2017 diff hist -15 m 153.10 Design – Escrow Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:14, 27 March 2017 diff hist -470 m 153.11 Financial Services Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 12:34, 24 March 2017 diff hist +226 m 153.12 General Services Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 10:14, 24 March 2017 diff hist +371 m 153.13 Highway Safety Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 10:09, 24 March 2017 diff hist -329 m 153.14 Human Resources Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:56, 24 March 2017 diff hist -331 m 153.21 Traffic Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:53, 24 March 2017 diff hist +327 m 153.22 Transportation Planning Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:31, 24 March 2017 diff hist +355 m 153.23 Utility Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:11, 24 March 2017 diff hist -1 m 606.1 Guardrail minor correction
- 08:05, 24 March 2017 diff hist -375 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)
- 08:01, 24 March 2017 diff hist +1,235 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per Brandi Baldwin and Commission's Secretary, updated to reflect current eAgreement process
- 07:50, 24 March 2017 diff hist +572 m Category:153 Agreements and Contracts Per Brandi Baldwin and Commission's Secretary, updated to reflect current eAgreement process
- 14:17, 23 March 2017 diff hist -933 m 903.15 Signing Agreements updated archaic links
- 14:15, 23 March 2017 diff hist -36 m 903.14 Memorial Signs updated archaic link
- 14:01, 23 March 2017 diff hist -36 m 903.13 State and Federal Recreation and Historic Site Signing updated archaic link
- 13:59, 23 March 2017 diff hist -72 m 903.10 General Service Signs updated archaic links
- 13:57, 23 March 2017 diff hist -36 m 903.9 General Information Signs →903.9.11 Custom City Limit and Custom County Line Signs (I4-1a, I4-2b, I4-2c, I6-1a): updated archaic link
- 13:53, 23 March 2017 diff hist -36 m 903.5 Regulatory Signs →903.5.43 Noise Ordinance Signing: updated archaic link
- 13:49, 23 March 2017 diff hist -90 m 903.18 Signing for School Areas updated archaic link
- 12:18, 23 March 2017 diff hist +140 m Category:613 Pavement Repair added video
- 09:36, 23 March 2017 diff hist -100 m 903.18 Signing for School Areas →903.19.5.1 School Assembly Installation Contracts: updated archaic link
- 09:30, 23 March 2017 diff hist -72 m 902.11 Traffic Control for Schools →902.11.1 School Crossing Indications at Existing Signal: updated archaic links
- 10:38, 22 March 2017 diff hist +1 m 153.20 Right of Way minor correction
- 13:36, 21 March 2017 diff hist -337 m Main Page EPG 153.19
- 13:20, 21 March 2017 diff hist -136 m 153.20 Right of Way Per RW, updated ROW agreement information to current procedures
- 11:16, 21 March 2017 diff hist +2 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings)
- 14:45, 20 March 2017 diff hist +65 m 751.50 Standard Detailing Notes →G5. CIP Concrete Pile (Notes for Bridge Standard Drawings): Per BR, several minor clarifications
- 13:52, 20 March 2017 diff hist +14 m 751.50 Standard Detailing Notes →G5b Open Ended Cast-in Place (OECIP) Concrete Pile
- 13:51, 20 March 2017 diff hist +106 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile
- 13:50, 20 March 2017 diff hist +13 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile
- 13:49, 20 March 2017 diff hist -5 m 751.50 Standard Detailing Notes →B3a. Bridges
- 13:46, 20 March 2017 diff hist -1 m 751.50 Standard Detailing Notes →G5b Open Ended Cast-in Place (OCECIP) Concrete Pile
- 13:45, 20 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →G5. CIP Concrete Pile (Notes for Bridge Standard Drawings)
- 12:58, 20 March 2017 diff hist -250 m Main Page EPG 616.1
- 12:42, 20 March 2017 diff hist +55 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: inserted link
- 11:13, 20 March 2017 diff hist +495 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: Per EPG, clarified grading limits and associated std plans
- 14:50, 17 March 2017 diff hist +118 m 751.50 Standard Detailing Notes Per BR, std details further revised to accommodate galvanized piling
- 14:39, 17 March 2017 diff hist +2,609 m 751.50 Standard Detailing Notes →G5. 20" and 24" CIP Piles: Per BR, renamed "CIP Concrete Piles (Notes for Bridge Standard Drawings" and expanded to accommodate galvanized piling
- 12:57, 17 March 2017 diff hist -9 m Other Aspects of Pavement Design →Shoulder Surface: Per EPG, guidance involving "should" and interstates was futher clarified
- 10:12, 17 March 2017 diff hist 0 m Category:101 Standard Forms →Bridge
- 10:10, 17 March 2017 diff hist 0 N File:101 No Rise Certificate 2017.pdf
- 10:10, 17 March 2017 diff hist 0 N File:101 Floodplain Development Permit Application 2017.pdf current
- 10:09, 17 March 2017 diff hist -4 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” and “No-Rise Certificate” by correcting title for SEMA contact and adding digital signatures and seal blocks
- 09:51, 17 March 2017 diff hist +75 m Main Page EPG 616.14.10
- 09:42, 17 March 2017 diff hist +10 m Category:Safe and Sound updated link
- 09:41, 17 March 2017 diff hist +10 m Category:105 Control of Work updated link
- 09:40, 17 March 2017 diff hist 0 N File:616.14.10 TMP.pdf current
- 09:39, 17 March 2017 diff hist +1,591 m 616.14 Work Zone Safety and Mobility Policy Per DE Liaison, clarified existing expectations for WZ Transportation Management Plan
- 08:26, 17 March 2017 diff hist -21 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, updated links to four posters
- 07:24, 17 March 2017 diff hist -62 m Main Page EPG 751.50
- 07:19, 17 March 2017 diff hist +389 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per BR, it is not required for AASHTO’s design live load for ornamental pedestrian fencing to be applied simultaneously
- 13:32, 16 March 2017 diff hist -253 m Main Page EPG 236.16.9
- 13:18, 16 March 2017 diff hist -487 m 236.16 Outdoor Advertising →236.16.9 Maintenance and Repair of Outdoor Advertising: Per RW, revised process for sending ODA courtesy letter
- 11:19, 16 March 2017 diff hist 0 N File:751.1.2.19 Guidance 2016 June.xlsx
- 11:11, 16 March 2017 diff hist +4 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 11:07, 16 March 2017 diff hist -47 m 751.1 Preliminary Design →751.1.2.19.3 Required Documents: Per BR, updated Foundation Report due date
- 10:30, 16 March 2017 diff hist +22 m Other Aspects of Pavement Design →Shoulder Surface: Per DE, minor clarification for Type A3 shoulder use
- 09:18, 16 March 2017 diff hist 0 N File:616.14 WZ Questions 2017.docx current
- 09:17, 16 March 2017 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Minor updates to Work Zone Questions for the Core Team
- 08:38, 16 March 2017 diff hist +307 m Main Page EPG 903.18
- 08:16, 16 March 2017 diff hist 0 N File:903 18 4.pdf current
- 08:15, 16 March 2017 diff hist 0 N File:903 18 2.pdf current
- 08:15, 16 March 2017 diff hist +795 m 903.17 Delineation and Object Markers Per TS, clarified Object Marker usage policy including figures showing standard installation details.
- 07:23, 16 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:21, 16 March 2017 diff hist 0 N File:751.50 Layer 2.jpg current
- 07:21, 16 March 2017 diff hist +29 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:20, 16 March 2017 diff hist 0 N File:751.50 Layer 1.jpg current
- 07:19, 16 March 2017 diff hist +28 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:13, 16 March 2017 diff hist +105 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:22, 15 March 2017 diff hist +119 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:14, 15 March 2017 diff hist 0 N File:751.50 ksf.jpg current
- 15:14, 15 March 2017 diff hist 0 N File:751.50 ftlb.jpg current
- 15:14, 15 March 2017 diff hist +61 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:10, 15 March 2017 diff hist 0 N File:751.50 kip.jpg current
- 15:10, 15 March 2017 diff hist -150 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:02, 15 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:00, 15 March 2017 diff hist 0 N File:751.50 ft.jpg current
- 15:00, 15 March 2017 diff hist -89 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:58, 15 March 2017 diff hist +5 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:57, 15 March 2017 diff hist 0 N File:751.50 ea.jpg current
- 14:57, 15 March 2017 diff hist -454 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:04, 15 March 2017 diff hist +1,417 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 13:39, 15 March 2017 diff hist +83 m 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout