User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:54, 21 June 2022 diff hist +17 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.8 Pedestrian Detectors (MUTCD Section 4E.08): Per EPS, the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 08:36, 17 June 2022 diff hist -43 m Main Page updated broken links
- 07:24, 17 June 2022 diff hist +311 m LPA:136.13 LPA Policy Changes EPG 136.8
- 11:26, 16 June 2022 diff hist +824 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance for LPA ROW Staff negotiators.
- 08:38, 15 June 2022 diff hist -58 m 751.8 LFD Culverts Per BR, deleted archaic EPG 751.8 LFD Culverts current
- 11:18, 8 June 2022 diff hist -27 m LPA:136.3 Federal Aid Basics →136.3.5 STIP/TIP: updated broken link
- 15:11, 3 June 2022 diff hist +39 m 642.8 Sidewalk Design Criteria Per EPS, revised PROWAG and TPAR links
- 09:22, 3 June 2022 diff hist +52 m Recent Policy Changes in the EPG EPG 236.5
- 09:17, 3 June 2022 diff hist +69 m 236.5 Property Management →236.5.25.5 Risk Assessment: Per RW, sovereign immunity limits increased in January 2022 and require MoDOT to increase per occurrence coverage from $3.0 M to $3.5 M
- 08:20, 3 June 2022 diff hist 0 m 751.1 Preliminary Design Per TP, updated Major Highway System map
- 08:19, 3 June 2022 diff hist 0 m Category:941 Permits and Access Requests Per TP, updated Major Highway System map
- 08:19, 3 June 2022 diff hist 0 m 822.5 Definitions Per TP, updated Major Highway System map current
- 08:18, 3 June 2022 diff hist 0 m 822.1 Vegetation Management for Major Roads Per TP, updated Major Highway System map current
- 08:17, 3 June 2022 diff hist 0 m 748.2 Roadway Design Criteria Per TP, updated Major Highway System map current
- 08:17, 3 June 2022 diff hist 0 m 643.3 Policy, Standards and Regulations Per TP, updated Major Highway System map
- 08:16, 3 June 2022 diff hist 0 m Category:643 Utility Procedures Per TP, updated Major Highway System map current
- 08:16, 3 June 2022 diff hist 0 m 626.3 Construction Inspection Guidelines for Sec 626 Per TP, updated Major Highway System map current
- 08:16, 3 June 2022 diff hist 0 m 626.2 Centerline Rumble Strips Per TP, updated Major Highway System map
- 08:15, 3 June 2022 diff hist 0 m 626.1 Edgeline Rumble Strips Per TP, updated Major Highway System map current
- 08:14, 3 June 2022 diff hist 0 m 620.12 Construction Inspection for Sec 620 Per TP, updated Major Highway System map
- 08:14, 3 June 2022 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Per TP, updated Major Highway System map
- 08:12, 3 June 2022 diff hist 0 m 236.13 Designing Right of Way Plans Per TP, updated Major Highway System map
- 08:12, 3 June 2022 diff hist 0 m Category:232 Facility Selection Per TP, updated Major Highway System map
- 08:11, 3 June 2022 diff hist 0 m 231.4 Shoulder Width Per TP, updated Major Highway System map
- 08:10, 3 June 2022 diff hist 0 m 144.5 Pavement Maintenance Per TP, updated Major Highway System map
- 08:09, 3 June 2022 diff hist 0 m Category:144 Practical Operations Per TP, updated Major Highway System map current
- 08:08, 3 June 2022 diff hist 0 m 133.5 Operator’s Guide for Anti-Icing Per TP, updated Major Highway System map current
- 08:07, 3 June 2022 diff hist 0 N File:144 Major Highway System 2022.pdf current
- 08:06, 3 June 2022 diff hist 0 m 121.5 Asset Management Per TP, updated Major Highway System map
- 15:06, 2 June 2022 diff hist +12 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:57, 2 June 2022 diff hist +559 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:46, 2 June 2022 diff hist +1 m LPA:136.8 Local Public Agency Land Acquisition Per RW, increased the value of waiver valuations to $25,000 (from $10,000), per FHWA's approval in 2021
- 10:45, 2 June 2022 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.7.2 Reinforcement
- 10:43, 2 June 2022 diff hist +4 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:42, 2 June 2022 diff hist +72 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 13:23, 1 June 2022 diff hist +429 m Recent Policy Changes in the EPG EPG 751
- 12:23, 1 June 2022 diff hist +8 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Concrete Shear Blocks: updated a link
- 11:29, 1 June 2022 diff hist +24 m 751.50 Standard Detailing Notes updated links
- 11:26, 1 June 2022 diff hist -92 m 751.11 Bearings updated links
- 11:23, 1 June 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams updated links
- 11:21, 1 June 2022 diff hist 0 m 751.9 LFD Seismic updated links current
- 11:13, 1 June 2022 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 11:10, 1 June 2022 diff hist 0 N File:751.22.3.10 Open2.jpg current
- 11:09, 1 June 2022 diff hist 0 N File:751.22.3.10 Open1.jpg current
- 11:08, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed2.jpg current
- 11:05, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed1.jpg current
- 11:03, 1 June 2022 diff hist 0 N File:751.22.3.9.3 2022.jpg current
- 11:01, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU2.jpg current
- 10:59, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU1.jpg current
- 10:58, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee2.jpg current
- 10:57, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee1.jpg current
- 10:55, 1 June 2022 diff hist 0 N File:751.22.3.9.2 IGirders2.jpg current
- 10:53, 1 June 2022 diff hist 0 N File:751.22.3.9.2 IGirders1.jpg current
- 10:51, 1 June 2022 diff hist 0 N File:751.22.3.9.1.3.jpg current
- 10:49, 1 June 2022 diff hist 0 N File:751.22.3.9.1.2 2022.jpg current
- 10:49, 1 June 2022 diff hist 0 N File:751.22.3.9.1.1 2022.jpg current
- 10:46, 1 June 2022 diff hist 0 N File:751.22.3.8.2 NU2.jpg current
- 10:43, 1 June 2022 diff hist 0 N File:751.22.3.8.2 NU1.jpg current
- 10:41, 1 June 2022 diff hist 0 N File:751.22.3.8.2 BulbTee2.jpg current
- 10:38, 1 June 2022 diff hist 0 N File:751.22.3.8.2 BulbTee1.jpg current
- 10:35, 1 June 2022 diff hist 0 N File:751.22.3.8.2 I Girders2.jpg current
- 10:32, 1 June 2022 diff hist 0 N File:751.22.3.8.2 I Girders1.jpg current
- 10:26, 1 June 2022 diff hist 0 N File:751.22.3.8.1.2.jpg current
- 10:23, 1 June 2022 diff hist 0 N File:751.22.3.8.1.1.jpg current
- 10:20, 1 June 2022 diff hist 0 N File:751.22.3.7.4.3.jpg current
- 10:18, 1 June 2022 diff hist 0 N File:751.22.3.7.4.2.jpg current
- 10:16, 1 June 2022 diff hist 0 N File:751.22.3.7.4.1.jpg current
- 10:13, 1 June 2022 diff hist 0 N File:751.22.3.7.3.jpg current
- 10:11, 1 June 2022 diff hist 0 N File:751.22.3.7.2 Change2.jpg current
- 10:09, 1 June 2022 diff hist 0 N File:751.22.3.7.2 Change1.jpg current
- 10:06, 1 June 2022 diff hist 0 N File:751.22.3.7.2 NU2.jpg current
- 10:04, 1 June 2022 diff hist 0 N File:751.22.3.7.2 NU1.jpg current
- 10:02, 1 June 2022 diff hist 0 N File:751.22.3.7.2 BulbTee2.jpg current
- 10:00, 1 June 2022 diff hist 0 N File:751.22.3.7.2 BulbTee1.jpg current
- 09:58, 1 June 2022 diff hist 0 N File:751.22.3.7.2 I Girders2.jpg current
- 09:58, 1 June 2022 diff hist 0 N File:751.22.3.7.2 I Girders1.jpg current
- 09:32, 1 June 2022 diff hist +148 m 751.22 Prestressed Concrete I Girders →751.22.3.7 Closed Concrete Intermediate Diaphragms: Per BR, Concrete diaphragms on bridges.
- 09:24, 1 June 2022 diff hist -134 m 751.22 Prestressed Concrete I Girders →751.22.3.7.1 Dimensions: Per BR, Concrete diaphragms on bridges
- 09:13, 1 June 2022 diff hist 0 N File:751.22.3.7.1.1.jpg current
- 09:11, 1 June 2022 diff hist 0 N File:751.22.3.7.1.2.jpg current
- 09:08, 1 June 2022 diff hist -11,035 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 14:40, 31 May 2022 diff hist -10 m 236.8 Relocation Assistance Program Per RW, updated link for Form 236.8.6.12(d), Moving Cost Claim - Actual Cost - Self Move
- 14:22, 31 May 2022 diff hist 0 N File:751.22.3.5.jpg current
- 12:29, 31 May 2022 diff hist +901 m 751.22 Prestressed Concrete I Girders →751.22.3.5 Bent-up Strands: Per BR, revised guidance related to concrete diaphragms on bridges
- 12:21, 31 May 2022 diff hist 0 N File:751.11.3.6 variations.jpg current
- 12:21, 31 May 2022 diff hist 0 N File:751.11.3.6 girder.jpg current
- 12:20, 31 May 2022 diff hist 0 N File:751.11.3.6 general.jpg current
- 12:20, 31 May 2022 diff hist +1,962 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per BR, updated guidance for concrete diaphragms on bridges
- 12:10, 31 May 2022 diff hist +237 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.3 Encased Pile Cap Bent
- 12:08, 31 May 2022 diff hist +238 m 751.31 Open Concrete Intermediate Bents →751.31.4.3 Substructure Beam Overhang
- 11:07, 31 May 2022 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.5 Coil Inserts and Tie Rods
- 11:06, 31 May 2022 diff hist 0 N File:751.35.4.5.jpg current
- 11:05, 31 May 2022 diff hist +1,619 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.4 Skewed Bents: Per BR, moved integral end bent coil tie details to EPG 751.35.4.5
- 13:42, 25 May 2022 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.10.2
- 13:41, 25 May 2022 diff hist 0 N File:136.10.2 2022.docx current
- 13:41, 25 May 2022 diff hist +2 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, revised Fig. 136.10.2 Bid Concurrence Checklist to match EPG language
- 12:50, 24 May 2022 diff hist +4 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Contracts, minor update for D-12
- 12:50, 24 May 2022 diff hist +8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Contracts, minor update for D-12
- 12:48, 24 May 2022 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Contracts, minor update for D-12
- 12:47, 24 May 2022 diff hist 0 N File:D-12 May 2022.pdf
- 12:47, 24 May 2022 diff hist +4 m Category:101 Standard Forms →Checklist: Per Bidding and Contracts, minor update for D-12
- 14:00, 20 May 2022 diff hist -121 m Recent Policy Changes in the EPG EPG 941.10, EPG 907.8
- 12:54, 20 May 2022 diff hist 0 N File:941.10.2.2.1.2.jpg current
- 12:53, 20 May 2022 diff hist 0 N File:941.10.2.2.1.1.jpg current
- 12:52, 20 May 2022 diff hist 0 N File:941.10.1 LPR Independent Installation.pdf current
- 12:52, 20 May 2022 diff hist 0 N File:941.10.1 LPR Flowchart.pdf current
- 12:51, 20 May 2022 diff hist +2,994 m Category:941 Permits and Access Requests →941.10 Automated License Plate Readers and Pan-Tilt-Zoom Cameras: Per TS, guidance for the License Plate Reader was clarified and expanded for proper LPR installations as identified through processing initial requests.
- 12:31, 20 May 2022 diff hist 0 N File:907.8.jpg current
- 12:30, 20 May 2022 diff hist +3,749 N 907.8 Speed Trailers Deployed by Others Per TS, this new article for speed trailer deployment aids local law enforcement in the proper use of these devices
- 13:53, 19 May 2022 diff hist -98 m Recent Policy Changes in the EPG EPG 747.2.2.4
- 13:48, 19 May 2022 diff hist -104 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings: Per CADD, updated guidance to reflect the current use of "HEC-RAS Convertor for Open Roads Designer" spreadsheet.
- 13:50, 18 May 2022 diff hist 0 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Contracts, updated D-12 link
- 13:48, 18 May 2022 diff hist 0 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Contracts, updated D-12 links
- 13:47, 18 May 2022 diff hist 0 N File:D-12 2022.pdf
- 13:47, 18 May 2022 diff hist 0 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Contracts, updated D-12 links
- 13:46, 18 May 2022 diff hist 0 m Category:101 Standard Forms →Checklist: Per Bidding and Contracts, updated D-12 links
- 12:18, 18 May 2022 diff hist +6 m 127.1 Request for Environmental Services →127.1.1.2 Process
- 08:18, 18 May 2022 diff hist +653 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:47, 17 May 2022 diff hist +68 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings
- 13:24, 17 May 2022 diff hist -95 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings
- 12:30, 17 May 2022 diff hist +176 m 751.9 LFD Seismic →751.9.3.1.4 Concrete Shear Blocks
- 15:30, 16 May 2022 diff hist +3 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26)
- 10:59, 16 May 2022 diff hist -280 m Recent Policy Changes in the EPG EPG 402 and EPG 409
- 10:50, 16 May 2022 diff hist 0 N File:409 Seal Coat Contractor Striping 2023.pdf current
- 10:48, 16 May 2022 diff hist 0 N File:409 FY2023 Contract Seal Coat Guidelines.docx current
- 10:48, 16 May 2022 diff hist 0 N File:409 FY2023 Contract Seal Coat Book Job Guidelines.docx current
- 10:47, 16 May 2022 diff hist +11 m Category:409 Seal Coat Per EPS, the Seal Coat and JSP package were updated.
- 10:39, 16 May 2022 diff hist +3 m Category:402 Bituminous Surface Leveling
- 10:32, 16 May 2022 diff hist 0 N File:402 CLC Contactor Striping 2023.pdf current
- 10:32, 16 May 2022 diff hist 0 N File:402 FY2023 Contract Leveling Course Book Job Guidelines.docx current
- 10:32, 16 May 2022 diff hist 0 N File:402 FY2023 Contract Leveling Course Guidelines.docx current
- 10:28, 16 May 2022 diff hist +78 m Category:402 Bituminous Surface Leveling Per EPS, the CLC and JSP package were updated.
- 09:55, 16 May 2022 diff hist -68 m Category:941 Permits and Access Requests Per TS, updated link
- 07:47, 13 May 2022 diff hist +94 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: Per DE Prof'l Services, updated link
- 15:14, 11 May 2022 diff hist +413 m Recent Policy Changes in the EPG EPG 751
- 14:53, 11 May 2022 diff hist 0 N File:751.22.3.14 plan.jpg current
- 14:53, 11 May 2022 diff hist 0 N File:751.22.3.14 elevation.jpg current
- 14:50, 11 May 2022 diff hist +6,094 m 751.22 Prestressed Concrete I Girders Per BR, clarified and expanded bearing anchor bolt, dowel bar, and shear block design.
- 14:40, 11 May 2022 diff hist +11,295 m 751.11 Bearings Per BR, clarified bearing anchor bolt, dowel bar, and shear block design.
- 14:28, 11 May 2022 diff hist +1,083 m 751.9 LFD Seismic →751.9.3.1 Connection Design: Per BR, clarified bearing anchor bolt, dowel bar, and shear block design.
- 13:45, 10 May 2022 diff hist +65 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Shear Blocks: Per BR
- 13:01, 10 May 2022 diff hist -33 m 132.2 Construction Inspection Guidelines for Safety Precautions →132.2.2 Traffic Control: Per CM current
- 13:00, 10 May 2022 diff hist -35 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.1 Construction Inspection Guidance for Sec 203: Per CM current
- 12:59, 10 May 2022 diff hist -33 m 616.18 Construction Inspection Guidelines for Sec 616 →Construction Requirements (for Sec 616.4): Per CM current
- 12:28, 10 May 2022 diff hist +56 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Per CM, updated links and references from archaic Documentation Records QRG to current AWP CP Documentation Records
- 12:23, 10 May 2022 diff hist +18 m 616.18 Construction Inspection Guidelines for Sec 616 →Construction Requirements (for Sec 616.4): Per CM, updated links and references from archaic Documentation Records QRG to current AWP CP Documentation Records
- 12:22, 10 May 2022 diff hist +46 m 132.2 Construction Inspection Guidelines for Safety Precautions →132.2.2 Traffic Control: Per CM, updated links and references from archaic Documentation Records QRG to current AWP CP Documentation Records
- 08:48, 6 May 2022 diff hist +22 m Category:403 Asphaltic Concrete Pavement Per IS, updated CM link
- 08:48, 6 May 2022 diff hist +22 m Category:401 Bituminous Base and Pavement Per IS, updated CM link
- 08:47, 6 May 2022 diff hist +22 m 104.7 Scoping Estimates →Maintenance of Traffic Operations During Construction (Sec 104.7.3): Per IS, updated CM link
- 14:34, 3 May 2022 diff hist 0 N File:127.2.6 brochure.pdf current
- 14:33, 3 May 2022 diff hist 0 N File:127.2.6 sample letter.docx
- 14:33, 3 May 2022 diff hist -40 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated broken links
- 08:17, 3 May 2022 diff hist +16 m LPA:136.11 Local Public Agency Construction Per LPA, updated links
- 08:14, 3 May 2022 diff hist +2 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, updated link
- 08:13, 3 May 2022 diff hist +2 m LPA:136.7 Design Per LPA, updated link
- 08:12, 3 May 2022 diff hist +2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated link
- 07:57, 3 May 2022 diff hist +2 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated link
- 07:56, 3 May 2022 diff hist +2 m LPA:136.1 Introduction Per LPA, updated link
- 07:54, 3 May 2022 diff hist +2 m LPA:136 Local Public Agency (LPA) Policy Per LPA, updated link
- 07:38, 3 May 2022 diff hist +10 m Category:108 Prosecution and Progress →108.16.1 Informational Dates: updated link
- 15:05, 29 April 2022 diff hist +100 m Recent Policy Changes in the EPG
- 14:56, 29 April 2022 diff hist -49 m Recent Policy Changes in the EPG EPG 105, EPG 109.8
- 13:52, 29 April 2022 diff hist +3 m Category:105 Control of Work →105.15.2.1 Contractor Delays in Submittal of Final Acceptance Documents
- 13:45, 29 April 2022 diff hist +2 m Category:105 Control of Work →105.15.1.4 Acceptance for Maintenance (Final Inspection)
- 13:42, 29 April 2022 diff hist +268 m Category:105 Control of Work →105.15 Project Acceptance: inserted links
- 13:36, 29 April 2022 diff hist +6 m Category:105 Control of Work →105.15 Project Acceptance
- 13:36, 29 April 2022 diff hist +68 m Category:105 Control of Work →105.15 Project Acceptance: inserted link
- 13:31, 29 April 2022 diff hist +89 m Category:105 Control of Work →105.15.2.1 Contractor Delays in Submittal of Final Acceptance Documents: inserted link
- 13:20, 29 April 2022 diff hist -1,461 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, clarified and updated project acceptance guidance to current practice by deleting "Sample Letters to Address Final Paperwork Requirements for Contractors"
- 13:05, 29 April 2022 diff hist +306 m Category:109 Measurement and Payment →109.8 Final Acceptance and Payment (for Sec 109.8): Per CM, clarifying and updating guidance to current practice.
- 12:48, 29 April 2022 diff hist +96 m Category:108 Prosecution and Progress inserted links
- 12:44, 29 April 2022 diff hist -3,080 m Category:108 Prosecution and Progress →108.16.1 Informational Dates: Per CM, clarified and updated Date of Final Inspection guidance to current practice.
- 12:38, 29 April 2022 diff hist +1 m Category:108 Prosecution and Progress updated link
- 12:10, 29 April 2022 diff hist +81 m Category:105 Control of Work →105.15.2 Final Acceptance: inserted link
- 12:09, 29 April 2022 diff hist +83 m Category:105 Control of Work →105.15.2 Final Acceptance: inserted link
- 12:05, 29 April 2022 diff hist +395 m Category:105 Control of Work inserted link
- 11:29, 29 April 2022 diff hist +65 m Category:105 Control of Work inserted link
- 11:24, 29 April 2022 diff hist +60 m Category:105 Control of Work →105.15.2 Final Acceptance: uploaded link
- 11:12, 29 April 2022 diff hist +12,297 m Category:105 Control of Work Per CM, clarifying and updating guidance to current practice. Replaced EPG 105.15 Acceptance (Sec 105.15) with EPG 105.15 Project Acceptance.
- 10:07, 29 April 2022 diff hist +37 m Category:107 Legal Relations and Responsibility to the Public
- 08:52, 29 April 2022 diff hist 0 m Help Article →Division Contacts
- 14:53, 28 April 2022 diff hist +174 m 127.9 Floodplain Management →127.9.3.1 Requirement Determination: Per BR, updated broken Memorandum of Agreement with SEMA current
- 12:13, 28 April 2022 diff hist +1 m Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions
- 10:14, 28 April 2022 diff hist 0 N File:616.13 WZ Impact April 2022.xlsm current
- 10:13, 28 April 2022 diff hist +12 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated WZ Impact Analysis Spreadsheet
- 07:30, 28 April 2022 diff hist -39 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.4 Survey (.dgn) file: Per CADD, updated broken link
- 07:13, 28 April 2022 diff hist -45 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.4 Survey (.dgn) file: Per CADD, updated broken link
- 15:23, 27 April 2022 diff hist 0 N File:237.14.2.5 MoDOT Linear Feature Naming Convention.pdf current
- 15:23, 27 April 2022 diff hist -123 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated broken links
- 11:25, 27 April 2022 diff hist 0 N File:237.14.3.6 Export a Completed Project for Construction.pdf current
- 11:25, 27 April 2022 diff hist 0 N File:237.14.3.1 Electronic Design Data Checklist.xlsx current
- 11:24, 27 April 2022 diff hist 0 N File:237.14.2.11 04 Make PDF Process for Contract Plans.pdf current
- 11:13, 27 April 2022 diff hist 0 N File:237.14.2.6 Civil Geometry Report.xlsx current
- 11:12, 27 April 2022 diff hist 0 N File:237.14.2.3 Survey Coordinate File Example.pdf current
- 11:11, 27 April 2022 diff hist 0 N File:237.14.2.2 Survey Report Example.pdf current
- 11:11, 27 April 2022 diff hist 0 N File:237.14.2.2 Survey Report.pdf current
- 11:10, 27 April 2022 diff hist 0 N File:237.14.2.1 Project Data Summary Report.xlsx current
- 11:10, 27 April 2022 diff hist -421 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated numerous broken links
- 14:55, 26 April 2022 diff hist -4,540 m 616.18 Construction Inspection Guidelines for Sec 616 Per CM, moved safety and sanitary guidance from EPG 616.18 to EPG 107.4. Updated EPG 616.18's Signing for Cold Milled Surfaces guidance by removing archaic verbiage about what the Changeable Message Signs are to display
- 14:34, 26 April 2022 diff hist +916 m Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions: Per CM, moved safety and sanitary guidance from EPG 616.18 to EPG 107.4
- 13:39, 26 April 2022 diff hist -11 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated verbiage to come in line with USDOL verbiage
- 09:17, 26 April 2022 diff hist +137 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG Checking For Unauthorized Sample Records
- 12:27, 25 April 2022 diff hist +33 m 102.2 Contractor Performance Rating System →102.2.5 Contractor Recognition: Per CM, clarified the conditions for contractors to receive an award based on their contractor performance rating
- 15:13, 22 April 2022 diff hist 0 N File:236.16.2 April 2022 map.jpg current
- 15:13, 22 April 2022 diff hist +6 m 236.16 Outdoor Advertising Per ODA, further updated contact info and map
- 14:51, 22 April 2022 diff hist +40 m 642.8 Sidewalk Design Criteria Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:48, 22 April 2022 diff hist +40 m Category:150 Quality Management Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:37, 22 April 2022 diff hist +40 m LPA:136.12 Figures, Glossary and Other Useful Links Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:36, 22 April 2022 diff hist +80 m LPA:136.11 Local Public Agency Construction Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:34, 22 April 2022 diff hist +80 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:30, 22 April 2022 diff hist +40 m Category:101 Standard Forms →Construction and Materials: Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 15:13, 21 April 2022 diff hist -126 m Recent Policy Changes in the EPG EPG 712.1.4
- 14:43, 21 April 2022 diff hist -374 m Category:712 Structural Steel Construction →712.1.4 Welding: Per BR, removed archaic references to field welder cards. Added language for stud welding to match Sec 712.6.3.
- 14:17, 20 April 2022 diff hist -435 m Recent Policy Changes in the EPG
- 14:01, 20 April 2022 diff hist +538 m Recent Policy Changes in the EPG EPG 137
- 13:54, 20 April 2022 diff hist +32 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, revision briefly updates information about how CM Division stores electronic contract document.
- 13:07, 20 April 2022 diff hist -30 m 127.29 Stormwater →127.29.4.3 MCM 3: Illicit Discharge Detection and Elimination (IDDE) Program: Per Env'l, updated broken link
- 10:59, 20 April 2022 diff hist -314 m Recent Policy Changes in the EPG EPG 903.3.4.3
- 10:47, 20 April 2022 diff hist +895 m Recent Policy Changes in the EPG EPG 802, EPG 805, EPG 806.1, EPG 806.8
- 10:30, 20 April 2022 diff hist +36 m Category:805 Seeding →805.2.3 Construction Requirements (Sec 805.3): added link current
- 09:11, 20 April 2022 diff hist +1,205 m Recent Policy Changes in the EPG EPG 612, 616.6, 616.18, 616.19, 616.23, 617.1, 617.2, 1063, 1064
- 08:37, 20 April 2022 diff hist +60 m Recent Policy Changes in the EPG EPG 403.1.19
- 08:36, 20 April 2022 diff hist +21 m Category:403 Asphaltic Concrete Pavement
- 13:43, 19 April 2022 diff hist -662 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.6.3 Erosion Control Measures: Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.
- 13:39, 19 April 2022 diff hist 0 m 806.2 Sediment Control Measures updated link
- 13:38, 19 April 2022 diff hist -2 m 806.1 Erosion Control Measures updated link
- 13:36, 19 April 2022 diff hist -6 m 750.6 Erosion Control and Energy Dissipation updated links
- 13:27, 19 April 2022 diff hist -166 806.1 Erosion Control Measures Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.
- 12:49, 19 April 2022 diff hist +2 m Category:805 Seeding
- 12:43, 19 April 2022 diff hist +9,214 Category:805 Seeding Guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment. New guidance for cool season and warm season grasses is available. A new seed species picture guide is available in EPG 805.2.4 Acceptance to assist with general inspection and acceptance of vegetative covers.
- 12:27, 19 April 2022 diff hist +1,642 Category:802 Mulching Per Env'l, guidance for mulching reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment. Mulching will not be required for final seeded areas where temporary seeding is planned for temporary stabilization of areas to receive warm season grasses. current
- 11:22, 19 April 2022 diff hist +424 Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19): Per CM, the maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots.
- 11:09, 19 April 2022 diff hist -306 903.3 Ground-Mounted Sign Supports Per TS, in EPG 903.3.4.3 Perforated Square Steel Tube Posts (PSST), guidance for PSST anchor installations has been updated and clarified.
- 10:37, 19 April 2022 diff hist -38 Category:1064 Temporary Concrete Traffic Barrier Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. current
- 10:36, 19 April 2022 diff hist +13 Category:1063 Temporary Traffic Control Devices Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. current
- 10:34, 19 April 2022 diff hist -1,503 617.2 Construction Inspection Guidelines for Sec 617 Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.
- 10:29, 19 April 2022 diff hist +36 617.1 Temporary Traffic Barriers Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:17, 19 April 2022 diff hist -217 616.23 Traffic Control for Field Operations →616.23.2.5 Temporary Traffic Control Devices: Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:15, 19 April 2022 diff hist -2 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.15 Traffic Management
- 10:12, 19 April 2022 diff hist -208 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.7 Changeable Message Sign/Flashing Arrow Panels/Traffic Signals: Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:09, 19 April 2022 diff hist -125 616.18 Construction Inspection Guidelines for Sec 616 Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:04, 19 April 2022 diff hist -632 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 09:56, 19 April 2022 diff hist -3 Category:612 Impact Attenuators Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 14:31, 18 April 2022 diff hist +167 m Recent Policy Changes in the EPG EPG 236.7
- 14:26, 18 April 2022 diff hist +1,138 m 236.7 Negotiation Per RW, additional guidance for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company.
- 08:01, 18 April 2022 diff hist 0 N File:236.16.2 2022 map.jpg current
- 08:00, 18 April 2022 diff hist -16 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: Per ODA, updated contact info and map
- 14:42, 14 April 2022 diff hist 0 m 236.6 Appraisal and Appraisal Review →236.6.3.3 Waiver Valuation: Per RW, increased the maximum threshold for waiver valuation reports from $10,000 to $25,000, per FHWA consent.
- 14:38, 14 April 2022 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, increased the maximum threshold for waiver valuation reports from $10,000 to $25,000, per FHWA consent.