Related changes
Jump to navigation
Jump to search
Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
18 April 2024
07:50 | Category:941 Permits and Access Requests diffhist +751 Hoskir talk contribs updated per RR3871 |
12 April 2024
|
m 10:51 | 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) 2 changes history+83 [Hoskir (2×)] | |||
m |
|
10:51 (cur | prev) +38 Hoskir talk contribs →902.5.29 Guidelines for Use of the Flashing Yellow Left Arrow (FYA): updated link | |||
m |
|
10:45 (cur | prev) +45 Hoskir talk contribs →902.5.23 Signal Indications for Left-Turn Movements – General (MUTCD Section 4D.17): updated left turn phasing document |
m 10:08 | LPA:136.8 Local Public Agency Land Acquisition diffhist -5 Hoskir talk contribs updated links to form 136.8.34 |
8 April 2024
07:41 | 903.6 Warning Signs diffhist +2,380 Hoskir talk contribs →903.6.58 NOTICE Plaque (W16-18P) (MUTCD Section 2A.15): updated per RR3865 |
1 April 2024
07:50 | LPA:136.4 Consultant Selection and Consultant Contract Management diffhist +3,602 Hoskir talk contribs →136.4.2 Solicitation & Selection Process: updated per RR3817 |
m 07:45 | 616.8 Typical Applications (MUTCD 6H) diffhist -90 Hoskir talk contribs took draft of TA-10SD400AADT |
28 March 2024
15:12 | Category:941 Permits and Access Requests diffhist -5 Hoskir talk contribs →941.7.2 Evaluating the Measurements: updated per RR3858 |
m 13:32 | 903.3 Ground-Mounted Sign Supports diffhist +52 Hoskir talk contribs →903.3.3.1 Mounting Height – U-Channel, Wood, Perforated Square Steel Tube (PSST) and Pipe Posts (MUTCD Section 2A.18): updated per email from Tom H. |
27 March 2024
|
13:59 | 751.36 Driven Piles 6 changes history+2,476 [Hoskir (6×)] | |||
|
13:59 (cur | prev) -33 Hoskir talk contribs →751.36.5.7.1.1 Design Values for Individual HP Pile: changes from RR3857 | ||||
|
11:28 (cur | prev) +874 Hoskir talk contribs →751.36.5.11 Check Pile Drivability: updated per RR3857 | ||||
|
11:06 (cur | prev) +129 Hoskir talk contribs →751.36.5.7.1.1 Design Values for Individual HP Pile: updated per RR3857 | ||||
|
11:05 (cur | prev) +91 Hoskir talk contribs →751.36.5.7.2.1 Design Values for Individual HP Pile: updated per RR3857 | ||||
|
10:25 (cur | prev) -2 Hoskir talk contribs →751.36.5.7.1.1 Design Values for Individual HP Pile: updated per RR3857 | ||||
|
10:14 (cur | prev) +1,417 Hoskir talk contribs →751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn): updated per RR3857 |
12:15 | 751.50 Standard Detailing Notes diffhist +188 Hoskir talk contribs →G7. Steel HP Pile: updated per RR3857 updated per RR3857 |
|
10:28 | 751.1 Preliminary Design 6 changes history+1,148 [Hoskir (6×)] | |||
m |
|
10:28 (cur | prev) +22 Hoskir talk contribs →751.1.2.22 Types of Piling: updated formatting | |||
m |
|
10:00 (cur | prev) +27 Hoskir talk contribs →751.1.2.31 Finishing Up Design Layout: updated formatting on table | |||
|
09:58 (cur | prev) +174 Hoskir talk contribs →751.1.2.31 Finishing Up Design Layout: updated per RR3857 | ||||
|
09:39 (cur | prev) +584 Hoskir talk contribs →751.1.2.22 Types of Piling: updated per RR3857 | ||||
m |
|
09:13 (cur | prev) +82 Hoskir talk contribs moved TOC to right side | |||
m |
|
09:12 (cur | prev) +259 Hoskir talk contribs →751.1.2.19 Soundings (Borings): updated link to Request for Final Soundings |
26 March 2024
m 13:28 | Category:134 Engineering Professional Services diffhist 0 Hoskir talk contribs →134.2.2.3 Solicitation and Selection Step 3 – Central Office Review of Solicitation Request: updated per email from Michelle N. |
12:22 | Category:139 Design - Build diffhist +213 Hoskir talk contribs →139.9.2 Contract Invoicing and Payment: updated per RR3856 |
12:07 | Category:235 Preliminary Plans diffhist +117 Hoskir talk contribs →235.6 Approval of Preliminary Plan: updated per RR3855 |
22 March 2024
|
m 09:08 | 751.32 Concrete Pile Cap Intermediate Bents 2 changes history0 [Hoskir (2×)] | |||
m |
|
09:08 (cur | prev) 0 Hoskir talk contribs →751.32.4.1 Typical Pile Cap Bent: updated image | |||
m |
|
09:05 (cur | prev) 0 Hoskir talk contribs →751.32.4.1 Typical Pile Cap Bent: changed size of image |
08:51 | 751.22 Prestressed Concrete I Girders diffhist +20 Hoskir talk contribs →751.22.3.4.1 Reinforcing Steel Details: fixed error from RR3851 |
21 March 2024
12:11 | 751.35 Concrete Pile Cap Integral End Bents diffhist +52 Hoskir talk contribs →751.35.4 Reinforcement: updated per RR3851 |
12:08 | 751.32 Concrete Pile Cap Intermediate Bents diffhist +3 Hoskir talk contribs →751.32.4.1 Typical Pile Cap Bent: updated per RR3851 |
|
12:07 | 751.31 Open Concrete Intermediate Bents 2 changes history+12 [Hoskir (2×)] | |||
|
12:07 (cur | prev) +6 Hoskir talk contribs →751.31.3.5 Hammer Head Type: updated per RR3851 | ||||
|
12:06 (cur | prev) +6 Hoskir talk contribs →751.31.3.1 Beam Cap: updated per RR3851 |
12:03 | 751.22 Prestressed Concrete I Girders diffhist +33 Hoskir talk contribs →751.22.3.4.1 Reinforcing Steel Details: updated per RR3851 |
12:00 | 751.12 Barriers, Railings, Curbs and Fences diffhist +347 Hoskir talk contribs updated 751.12.1.3-6 per RR3851 |
11:57 | 751.11 Bearings diffhist +227 Hoskir talk contribs →751.11.3.5 Anchor Bolts: updated per RR3851 |
11:54 | 751.5 Structural Detailing Guidelines diffhist +14,170 Hoskir talk contribs →751.5.9.2.7 Length Calculations: updated per RR3851 |