Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 08:32, 28 March 2024
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

27 March 2024

     13:59  751.36 Driven Piles‎‎ 6 changes history+2,476[Hoskir‎ (6×)]
     
13:59 (cur | prev) -33 Hoskir talk contribs →‎751.36.5.7.1.1 Design Values for Individual HP Pile: changes from RR3857
     
11:28 (cur | prev) +874 Hoskir talk contribs →‎751.36.5.11 Check Pile Drivability: updated per RR3857
     
11:06 (cur | prev) +129 Hoskir talk contribs →‎751.36.5.7.1.1 Design Values for Individual HP Pile: updated per RR3857
     
11:05 (cur | prev) +91 Hoskir talk contribs →‎751.36.5.7.2.1 Design Values for Individual HP Pile: updated per RR3857
     
10:25 (cur | prev) -2 Hoskir talk contribs →‎751.36.5.7.1.1 Design Values for Individual HP Pile: updated per RR3857
     
10:14 (cur | prev) +1,417 Hoskir talk contribs →‎751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn): updated per RR3857
     12:15  751.50 Standard Detailing Notes diffhist +188 Hoskir talk contribs →‎G7. Steel HP Pile: updated per RR3857 updated per RR3857
     10:28  751.1 Preliminary Design‎‎ 6 changes history+1,148[Hoskir‎ (6×)]
 m   
10:28 (cur | prev) +22 Hoskir talk contribs →‎751.1.2.22 Types of Piling: updated formatting
 m   
10:00 (cur | prev) +27 Hoskir talk contribs →‎751.1.2.31 Finishing Up Design Layout: updated formatting on table
     
09:58 (cur | prev) +174 Hoskir talk contribs →‎751.1.2.31 Finishing Up Design Layout: updated per RR3857
     
09:39 (cur | prev) +584 Hoskir talk contribs →‎751.1.2.22 Types of Piling: updated per RR3857
 m   
09:13 (cur | prev) +82 Hoskir talk contribs moved TOC to right side
 m   
09:12 (cur | prev) +259 Hoskir talk contribs →‎751.1.2.19 Soundings (Borings): updated link to Request for Final Soundings

26 March 2024

 m   13:28  Category:134 Engineering Professional Services diffhist 0 Hoskir talk contribs →‎134.2.2.3 Solicitation and Selection Step 3 – Central Office Review of Solicitation Request: updated per email from Michelle N.
     12:22  Category:139 Design - Build diffhist +213 Hoskir talk contribs →‎139.9.2 Contract Invoicing and Payment: updated per RR3856
     12:07  Category:235 Preliminary Plans diffhist +117 Hoskir talk contribs →‎235.6 Approval of Preliminary Plan: updated per RR3855

22 March 2024

 m   09:08  751.32 Concrete Pile Cap Intermediate Bents‎‎ 2 changes history0[Hoskir‎ (2×)]
 m   
09:08 (cur | prev) 0 Hoskir talk contribs →‎751.32.4.1 Typical Pile Cap Bent: updated image
 m   
09:05 (cur | prev) 0 Hoskir talk contribs →‎751.32.4.1 Typical Pile Cap Bent: changed size of image
     08:51  751.22 Prestressed Concrete I Girders diffhist +20 Hoskir talk contribs →‎751.22.3.4.1 Reinforcing Steel Details: fixed error from RR3851

21 March 2024

     12:11  751.35 Concrete Pile Cap Integral End Bents diffhist +52 Hoskir talk contribs →‎751.35.4 Reinforcement: updated per RR3851
     12:08  751.32 Concrete Pile Cap Intermediate Bents diffhist +3 Hoskir talk contribs →‎751.32.4.1 Typical Pile Cap Bent: updated per RR3851
     12:07  751.31 Open Concrete Intermediate Bents‎‎ 2 changes history+12[Hoskir‎ (2×)]
     
12:07 (cur | prev) +6 Hoskir talk contribs →‎751.31.3.5 Hammer Head Type: updated per RR3851
     
12:06 (cur | prev) +6 Hoskir talk contribs →‎751.31.3.1 Beam Cap: updated per RR3851
     12:03  751.22 Prestressed Concrete I Girders diffhist +33 Hoskir talk contribs →‎751.22.3.4.1 Reinforcing Steel Details: updated per RR3851
     12:00  751.12 Barriers, Railings, Curbs and Fences diffhist +347 Hoskir talk contribs updated 751.12.1.3-6 per RR3851
     11:57  751.11 Bearings diffhist +227 Hoskir talk contribs →‎751.11.3.5 Anchor Bolts: updated per RR3851
     11:54  751.5 Structural Detailing Guidelines diffhist +14,170 Hoskir talk contribs →‎751.5.9.2.7 Length Calculations: updated per RR3851

20 March 2024

     09:32 Move log Hoskir talk contribs moved page 616.27 Fleet Lighting to 616.27 MoDOT Fleet Lighting(per RR3854)
 m   08:37  Category:108 Prosecution and Progress diffhist +682 Hoskir talk contribs →‎108.1.1 Review and Approval of a Subcontract Request: updated per email from Jennifer S.

19 March 2024

 m   07:33  616.8 Typical Applications (MUTCD 6H) diffhist +426 Hoskir talk contribs →‎616.8.2.1 Typical Applications: added draft TA-10SD400AADT

18 March 2024

     08:43  751.5 Structural Detailing Guidelines diffhist +2,781 Hoskir talk contribs →‎751.5.9.2.1.2 Bend Shapes: added 751.5.9.2.1.2 per RR3851
 m   08:26  751.50 Standard Detailing Notes diffhist +1 Hoskir talk contribs →‎H6. Pouring and Finishing Concrete Slabs: updated note H6.4 per email from Debbie B.

14 March 2024

     14:31  902.5 Traffic Control Signal Features (MUTCD Chapter 4D) diffhist +962 Hoskir talk contribs →‎902.5.23 Signal Indications for Left-Turn Movements – General (MUTCD Section 4D.17): updated per RR3754

7 March 2024

 m   14:28  LPA:136.4 Consultant Selection and Consultant Contract Management diffhist -36 Hoskir talk contribs →‎136.4.2.4 Step 3 - Advertising the RFQ Solicitation: updated per RR3847
 m   13:47  Category:134 Engineering Professional Services diffhist +186 Hoskir talk contribs →‎134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: updated per RR3847
 m   09:22  Category:108 Prosecution and Progress diffhist -61 Hoskir talk contribs →‎108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: updated per RR3847

6 March 2024

 m   16:55  616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) diffhist 0 Legged1 talk contribs →‎616.6.47 NO CENTER LINE Sign (WO8-12) (MUTCD 6F.47): terminology
 m   16:16  Category:108 Prosecution and Progress diffhist +209 Hoskir talk contribs →‎108.1.1 Review and Approval of a Subcontract Request: updated per RR3847
 m   12:19  751.50 Standard Detailing Notes diffhist +8 Hoskir talk contribs →‎I1. General: updated per RR3846

4 March 2024

 m   12:37  Category:153 Agreements and Contracts diffhist -54 Hoskir talk contribs updated links to eAgreements
 m   11:05  236.7 Negotiation diffhist +13 Hoskir talk contribs updated link to eAgreements

29 February 2024

 m   15:26  751.50 Standard Detailing Notes diffhist +180 Hoskir talk contribs →‎I1. General: updated per RR3842