Difference between revisions of "Work Zone Safety and Mobility Policy Resources"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (updated link)
m (Per TS, updated WZ Inspection Form)
Line 15: Line 15:
 
|[[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]]||[http://wwwi/intranet/tr/ttc/programs.htm ''QuickZone'']
 
|[[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]]||[http://wwwi/intranet/tr/ttc/programs.htm ''QuickZone'']
 
|-
 
|-
|[[media:WZ Inspection.docx|''Work Zone Inspection Form'']]||[[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]]
+
|[[media:WZ Inspection 2016.pdf|''Work Zone Inspection Form'']]||[[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]]
 
|-
 
|-
 
|[http://www.modot.mo.gov/workzones/TrainingandPolicies.htm ''Transportation Management Plan Strategy Matrix''] <sup>(1)</sup>||[[:Category:612 Impact Attenuators#612.1 Truck-Mounted Attenuators|EPG 612.1 Truck-Mounted Attenuators]]
 
|[http://www.modot.mo.gov/workzones/TrainingandPolicies.htm ''Transportation Management Plan Strategy Matrix''] <sup>(1)</sup>||[[:Category:612 Impact Attenuators#612.1 Truck-Mounted Attenuators|EPG 612.1 Truck-Mounted Attenuators]]

Revision as of 11:31, 17 June 2016