Difference between revisions of "Work Zone Safety and Mobility Policy Resources"
Jump to navigation
Jump to search
m |
m (Per TS, deleted archaic "QuickZone" and moved "Work Zone Inspection Sheet" to EPG 616.19) |
||
Line 13: | Line 13: | ||
|[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 616]||[http://maps.modot.mo.gov/travelerinformation ''MoDOT Work Zone Map''] | |[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 616]||[http://maps.modot.mo.gov/travelerinformation ''MoDOT Work Zone Map''] | ||
|- | |- | ||
− | |[[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]]||[ | + | |[[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]]||[[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]] |
|- | |- | ||
− | |[http://sharepoint/systemdelivery/TR/mo/travinfoitsworkzonemanagment/workzones/Shared%20Documents/Inspections/WorkZone_Inspection-form%202014.pdf ''Work Zone Inspection Form'']||[[ | + | |[http://sharepoint/systemdelivery/TR/mo/travinfoitsworkzonemanagment/workzones/Shared%20Documents/Inspections/WorkZone_Inspection-form%202014.pdf ''Work Zone Inspection Form'']||[[:Category:612 Impact Attenuators#612.1 Truck-Mounted Attenuators|EPG 612.1 Truck-Mounted Attenuators]] |
|- | |- | ||
− | |[https://www.modot.org/work-zone-policies-and-tools ''Transportation Management Plan Strategy Matrix''] <sup>(1)</sup>||[[ | + | |[https://www.modot.org/work-zone-policies-and-tools ''Transportation Management Plan Strategy Matrix''] <sup>(1)</sup>||[[616.26 Work Zone User Training|Work Zone User Training, Web Version]] |
|- | |- | ||
− | |[[616.21 Work Zone Technician Training|Work Zone Technician Training] | + | |[[616.21 Work Zone Technician Training|Work Zone Technician Training]]|| |
− | |||
− | |||
|- | |- | ||
|colspan="2"|<sup>(1)</sup> After clicking the matrix located on the website page, the file must be saved in the user's computer before work can be done in it. | |colspan="2"|<sup>(1)</sup> After clicking the matrix located on the website page, the file must be saved in the user's computer before work can be done in it. |
Revision as of 15:26, 23 February 2022
Return to EPG 616.14 Work Zone Safety and Mobility Policy |