Difference between revisions of "Work Zone Safety and Mobility Policy Resources"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per TS, updated WZ Inspection Form)
m (Per TS, added "Temporary Traffic Control Inspection Worksheet" as a convenience (was already in EPG 616.19))
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
|colspan="2" align="center"|'''Work Zone Safety and Mobility Policy Resources'''
 
|colspan="2" align="center"|'''Work Zone Safety and Mobility Policy Resources'''
 
|-
 
|-
|[[616.22 Advanced Work Zone Training|EPG 616.22 Advanced Work Zone Training]]||[http://epg.modot.mo.gov/index.php?title=616.6_Temporary_Traffic_Control_Zone_Devices_%28MUTCD_6F%29#616.6.60_Portable_Changeable_Message_Signs_.28MUTCD_6F.60.29 EPG 616.3 Changeable Message Signs (CMS)]
+
|[[616.22 Advanced Work Zone Training|EPG 616.22 Advanced Work Zone Training]]||[https://epg.modot.org/index.php?title=616.6_Temporary_Traffic_Control_Zone_Devices_%28MUTCD_6F%29#616.6.60_Portable_Changeable_Message_Signs_.28MUTCD_6F.60.29 EPG 616.6.60 Changeable Message Signs (CMS)]
 
|-
 
|-
 
|[[910.3 Dynamic Message Signs (DMS)|EPG 910.3 Dynamic Message Signs (DMS)]]||[[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control Plans]]
 
|[[910.3 Dynamic Message Signs (DMS)|EPG 910.3 Dynamic Message Signs (DMS)]]||[[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control Plans]]
Line 9: Line 9:
 
|[http://www.fhwa.dot.gov/modiv/oversite.htm ''FHWA/MoDOT Oversight Manual'']||[[616.20 Flagger Training|EPG 616.20 Flagger Training]]
 
|[http://www.fhwa.dot.gov/modiv/oversite.htm ''FHWA/MoDOT Oversight Manual'']||[[616.20 Flagger Training|EPG 616.20 Flagger Training]]
 
|-
 
|-
|[http://mutcd.fhwa.dot.gov/  ''Manual on Uniform Traffic Control Devices'']||[http://www.modot.mo.gov/business/standards_and_specs/documents/61610.pdf Std Plan 616.10]
+
|[http://mutcd.fhwa.dot.gov/  ''Manual on Uniform Traffic Control Devices'']||[https://www.modot.org/media/16892 Std Plan 616.10]
 
|-
 
|-
 
|[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 616]||[http://maps.modot.mo.gov/travelerinformation ''MoDOT Work Zone Map'']
 
|[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 616]||[http://maps.modot.mo.gov/travelerinformation ''MoDOT Work Zone Map'']
 
|-
 
|-
|[[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]]||[http://wwwi/intranet/tr/ttc/programs.htm ''QuickZone'']
+
|[[616.19 Quality Standards for Temporary Traffic Control Devices|EPG 616.19 Quality Standards for Temporary Traffic Control Devices]]||[[media:616.19 Inspection Worksheet 2017.docx|Temporary Traffic Control Inspection Worksheet]]
 
|-
 
|-
|[[media:WZ Inspection 2016.pdf|''Work Zone Inspection Form'']]||[[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]]
+
|[[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]]||[https://www.modot.org/work-zone-policies-and-tools ''Transportation Management Plan Strategy Matrix''] <sup>(1)</sup>
 
|-
 
|-
|[http://www.modot.mo.gov/workzones/TrainingandPolicies.htm ''Transportation Management Plan Strategy Matrix''] <sup>(1)</sup>||[[:Category:612 Impact Attenuators#612.1 Truck-Mounted Attenuators|EPG 612.1 Truck-Mounted Attenuators]]
+
|[[:Category:612 Impact Attenuators#612.1 Truck-Mounted Attenuators|EPG 612.1 Truck-Mounted Attenuators]]||[http://sharepoint/systemdelivery/TR/mo/travinfoitsworkzonemanagment/workzones/Shared%20Documents/Inspections/WorkZone_Inspection-form%202014.pdf ''Work Zone Inspection Form'']
 
|-
 
|-
|[[616.21 Work Zone Technician Training|Work Zone Technician Training]]||[[616.26 Work Zone User Training|Work Zone User Training, Web Version]]  
+
|[[616.26 Work Zone User Training|Work Zone User Training, Web Version]]||[[616.21 Work Zone Technician Training|Work Zone Technician Training]]
|-
 
|[http://wwwi/intranet/tr/ttc/documents/TTC_Inspection_Worksheet.htm ''Work Zone Inspection Sheet'']||
 
 
|-
 
|-
 
|colspan="2"|<sup>(1)</sup> After clicking the matrix located on the website page, the file must be saved in the user's computer before work can be done in it.
 
|colspan="2"|<sup>(1)</sup> After clicking the matrix located on the website page, the file must be saved in the user's computer before work can be done in it.

Latest revision as of 09:48, 25 February 2022