106.6 Handling Material
Jump to navigation
Jump to search
Materials shall be handled in such a manner as to ensure that the quality of material is preserved. It is the contractor's responsibility to ensure that appropriate measures are taken to guarantee that material being incorporated into the project has not been damaged, segregated or contaminated due to poor handling practices.