Difference between revisions of "Category:460 General Requirements for Bituminous Construction"
m (Per CM, updated link to Asphalt Roadway Report) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width=" | + | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="300px" align="right" |
|- | |- | ||
|'''Forms''' | |'''Forms''' | ||
Line 13: | Line 13: | ||
|[[Media:460 Form Bin Percentages and Scale Settings.doc|Bin Percentages and Scale Settings]] | |[[Media:460 Form Bin Percentages and Scale Settings.doc|Bin Percentages and Scale Settings]] | ||
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/forms/CM/Asphalt_Roadway_Report.xlsm Asphalt Roadway Report] |
|- | |- | ||
|[[Media:403 Form Profilograph Report.doc|Profilograph Report]] | |[[Media:403 Form Profilograph Report.doc|Profilograph Report]] | ||
Line 25: | Line 25: | ||
|[[Media:403 Figure Consensus Testing.pdf|Consensus Testing]] | |[[Media:403 Figure Consensus Testing.pdf|Consensus Testing]] | ||
|- | |- | ||
− | |[[Media:403 QAQC Questions and Answers.pdf|QAQC Questions and Answers | + | |[[Media:403 QAQC Questions and Answers.pdf|QAQC Questions and Answers]] |
|- | |- | ||
|[[Media:460 Figure Superpave Lessons Learned (Segregation).pdf|Superpave Lessons Learned (Segregation)]] | |[[Media:460 Figure Superpave Lessons Learned (Segregation).pdf|Superpave Lessons Learned (Segregation)]] |
Latest revision as of 10:01, 8 December 2021
The General Requirements for Bituminous Construction is to guide the bituminous plant and roadway inspectors in the inspection of construction of various types of hot mix asphalt pavements. These articles contain information common to all bituminous specification sections. However, this is not a contract document and is to be used solely as a commentary on the Standard Specifications.
It is the inspector’s responsibility to assure that all contract requirements are met. The inspectors will be familiar with the Standard Specifications and all contract documents. It is the contractor’s responsibility to produce an acceptable product that meets the requirements of the contract. Each should recognize and respect the position of the other. Maintain, within the framework of these instructions, an attitude of cooperation and professionalism toward the contractor. Do not delay operations unnecessarily. Continuous paving operations are desirable for both the quality of the product and the contractor’s production. The plant and roadway inspectors are directly responsible to the Resident Engineer (RE). Any misunderstandings that the inspector cannot readily resolve should be promptly brought to the RE’s attention. The plant inspector and roadway inspector should keep in close contact with each other.
Articles in "460 General Requirements for Bituminous Construction"
The following 6 pages are in this category, out of 6 total.