Difference between revisions of "Category:100 GENERAL"
Jump to navigation
Jump to search
m (Per CM, EPG 100.1 and EPG 100.2 presented archaic info as well as information that is presented in other articles. They were deleted.) |
m |
||
Line 53: | Line 53: | ||
<categorytree mode=all>147 Innovative Contracting</categorytree> | <categorytree mode=all>147 Innovative Contracting</categorytree> | ||
<categorytree mode=all>148 Accelerated Bridge Construction (ABC)</categorytree> | <categorytree mode=all>148 Accelerated Bridge Construction (ABC)</categorytree> | ||
− | <categorytree mode=all>149 Project Delivery | + | <categorytree mode=all>149 Project Delivery Determination and Initial Risk Assessment</categorytree> |
<categorytree mode=all>150 Quality Management</categorytree> | <categorytree mode=all>150 Quality Management</categorytree> | ||
<categorytree mode=all>151 Administrative Rule Creation or Modification Process</categorytree> | <categorytree mode=all>151 Administrative Rule Creation or Modification Process</categorytree> |
Revision as of 09:54, 26 January 2022
EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding). |