Difference between revisions of "Category:101 Standard Forms"
Jump to navigation
Jump to search
m (→Materials Related: Per CM, updated form) |
m (→Quick Reference Guides (QRGs) 20px: Per CM, updated three QRGs to reflect new districts) |
||
Line 312: | Line 312: | ||
:* [[media:Change Orders – Mobilization and Contract Bond Jan 2012.docx|Change Orders – Mobilization and Contract Bond]] | :* [[media:Change Orders – Mobilization and Contract Bond Jan 2012.docx|Change Orders – Mobilization and Contract Bond]] | ||
− | :* [[media:Change Orders – Time Adjustment | + | :* [[media:Change Orders – Time Adjustment May 2012.docx|Change Orders – Time Adjustment]] |
:* [[media:Change Orders – Value Engineering July 2011.doc|Change Orders – Value Engineering]] | :* [[media:Change Orders – Value Engineering July 2011.doc|Change Orders – Value Engineering]] | ||
Line 359: | Line 359: | ||
:* [[media:Digital Signature QRG8 for ROUTINE Adobe Digital Signature Contractor.doc|Digital Signature QRG8 for ROUTINE Adobe Digital Signature Contractor]] | :* [[media:Digital Signature QRG8 for ROUTINE Adobe Digital Signature Contractor.doc|Digital Signature QRG8 for ROUTINE Adobe Digital Signature Contractor]] | ||
− | |||
− | |||
:* [[media:Disposition Remarks for PAL Materials.doc|Disposition Remarks for PAL Materials]] | :* [[media:Disposition Remarks for PAL Materials.doc|Disposition Remarks for PAL Materials]] | ||
Line 370: | Line 368: | ||
:* [[media:Filtering a SiteManager Pick List.doc|Filtering a SiteManager Pick List]] | :* [[media:Filtering a SiteManager Pick List.doc|Filtering a SiteManager Pick List]] | ||
− | :* [[media:Key Dates. | + | :* [[media:Key Dates.docx|Key Dates]] |
:* [[media:Line Item Adjustments Apr 23, 2012.docx|Line Item Adjustments]] | :* [[media:Line Item Adjustments Apr 23, 2012.docx|Line Item Adjustments]] | ||
Line 377: | Line 375: | ||
:* [[media:PAL Plant Inspection and Record.docx|PAL Plant Inspection and Record]] | :* [[media:PAL Plant Inspection and Record.docx|PAL Plant Inspection and Record]] | ||
+ | |||
+ | :* [[media:SL Reason Codes for Time Extension Change Orders.doc|SL District Reason Codes for Time Extension Change Orders]] | ||
:* [[media:Sample Record General.docx|Sample Record General Information]] | :* [[media:Sample Record General.docx|Sample Record General Information]] |
Revision as of 13:14, 22 May 2012
Contents
- 1
- 2 Bridge
- 3 Construction and Materials
- 4 Design
- 5 Maintenance
- 6 Motor Carrier Services
- 7 Planning
- 8 Resource Management
- 9 Right of Way
- 9.1 General Information
- 9.2 Right of Way Organization and Personnel
- 9.3 Administration
- 9.4 Description Writing and Titles
- 9.5 Property Management
- 9.6 Appraisal and Appraisal Review
- 9.7 Negotiation
- 9.8 Relocation Assistance Program
- 9.9 Asbestos Abatement-Removal of Building Improvement
- 9.10 Right Of Way Condemnation
- 9.11 Mediation
- 9.12 Quality Assurance Reviews
- 9.13 Designing Right of Way Plans
- 9.14 Change in Route Status Report
- 9.15 Requests from Cities for Annexations
- 9.16 Outdoor Advertising
- 9.17 Junkyards
- 9.18 Local Public Agency Land Acquisition
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
Design
Bridge
Checklist
Computer
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Resource Management
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition