User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:29, 11 April 2022 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: minor update to ADA Checklist links
- 10:28, 11 April 2022 diff hist 0 m LPA:136.11 Local Public Agency Construction minor update to ADA Checklist links
- 10:27, 11 April 2022 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) minor update to ADA Checklist links
- 10:25, 11 April 2022 diff hist 0 m Category:101 Standard Forms →Construction and Materials: minor update to ADA Checklist link
- 07:10, 11 April 2022 diff hist -157 m 171.4 Shoulders and Approaches →S&A(C2) Culvert Ends: updated broken std plan links
- 15:19, 6 April 2022 diff hist +2 m 153.20 Right of Way Per RW and CCO, minor updates to RW51 contract requirements. This agreement should include the approval as to form and attestation signature.
- 12:40, 6 April 2022 diff hist +6 m Category:101 Standard Forms →Bridge
- 12:39, 6 April 2022 diff hist +79 m Category:101 Standard Forms →Bridge: Per BR, updated link to Culvert Hydraulics Report
- 15:16, 5 April 2022 diff hist +24 m Recent Policy Changes in the EPG EPG 127.2.5
- 15:11, 5 April 2022 diff hist +386 m 127.2 Historic Preservation and Cultural Resources →127.2.5 Approximate Timelines for Section 106 Compliance: Per Env'l, Clarifying the timelines for completing the Section 106 of the National Historic Preservation Act review process
- 14:38, 5 April 2022 diff hist -46 m 642.8 Sidewalk Design Criteria Per CM, updated links to ADA Checklist
- 14:37, 5 April 2022 diff hist -46 m Category:150 Quality Management Per CM, updated links to ADA Checklist
- 14:36, 5 April 2022 diff hist -46 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per CM, updated links to ADA Checklist
- 14:35, 5 April 2022 diff hist -92 m LPA:136.11 Local Public Agency Construction Per CM, updated links to ADA Checklist
- 14:33, 5 April 2022 diff hist -92 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, updated links to ADA Checklist
- 14:31, 5 April 2022 diff hist -46 m Category:101 Standard Forms →Construction and Materials: Per CM, updated ADA Checklist links
- 12:17, 5 April 2022 diff hist +95 m Category:940 Access Management Per TS, updated link to "Managing Access to Missouri's Highways" brochure current
- 11:30, 5 April 2022 diff hist -28 m 642.8 Sidewalk Design Criteria
- 10:52, 5 April 2022 diff hist +191 m 642.8 Sidewalk Design Criteria Per CM, minor revisions to the ADA Checklist
- 10:51, 5 April 2022 diff hist +152 m Category:150 Quality Management Per CM, minor revisions to the ADA Checklist
- 10:48, 5 April 2022 diff hist +198 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per CM, minor revisions to ADA Checklist
- 10:45, 5 April 2022 diff hist +11 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.10 ADA Checklist
- 10:44, 5 April 2022 diff hist +401 m LPA:136.11 Local Public Agency Construction Per CM, minor revisions to the ADA Checklist
- 10:36, 5 April 2022 diff hist +347 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, minor revisions to the ADA Checklist
- 10:21, 5 April 2022 diff hist +149 m Category:101 Standard Forms →Construction and Materials: Per CM, minor revisions to ADA Checklist
- 12:16, 4 April 2022 diff hist +208 m Category:105 Control of Work →105.16 Controversies and Claims for Adjustment (Sec 105.16): Per CM, minor clarification
- 11:13, 1 April 2022 diff hist -17 m Help Article →Division Contacts
- 14:30, 31 March 2022 diff hist 0 N File:202.1 detonation.docx current
- 14:30, 31 March 2022 diff hist +244 m Category:202 Removal of Buildings and Structures added "Detonating an I-35 ramp bridge" current
- 13:21, 29 March 2022 diff hist 0 N File:127.13 Soundwall brochure.pdf current
- 13:20, 29 March 2022 diff hist +64 m 127.13 Noise Per Env'l, added Sound Wall brochure for general information
- 07:14, 29 March 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.5 Camber, Haunching and Girder Steps: updated link
- 15:21, 28 March 2022 diff hist +23 m Recent Policy Changes in the EPG
- 15:20, 28 March 2022 diff hist +33 m Recent Policy Changes in the EPG EPG 751.50
- 15:15, 28 March 2022 diff hist -373 m 751.50 Standard Detailing Notes Per BR, removed references to web coil ties in bulb-tee and NU girders
- 13:30, 28 March 2022 diff hist +1 m Category:101 Standard Forms →Materials Related: Per CM, updated broken link
- 13:27, 21 March 2022 diff hist -38 m 616.18 Construction Inspection Guidelines for Sec 616 →Safety Requirements (for Sec 616.3): deleted outdated photo of PPE
- 11:04, 18 March 2022 diff hist +5 m Help Article →EPG Ballot Cycles
- 11:03, 18 March 2022 diff hist +3 m Help Article →EPG Ballot Cycles
- 11:02, 18 March 2022 diff hist -21 m Help Article →EPG Ballot Cycles
- 11:01, 18 March 2022 diff hist +19 m Help Article →EPG Ballot Cycles
- 11:01, 18 March 2022 diff hist -19 m Help Article →EPG Ballot Cycles: updated schedule
- 08:25, 17 March 2022 diff hist -190 m 643.2 Local Utility Adjustments - Public and Private updated broken links
- 08:17, 17 March 2022 diff hist -36 643.4 Railroads updated broken links
- 15:19, 16 March 2022 diff hist -9 m Recent Policy Changes in the EPG
- 15:17, 16 March 2022 diff hist +75 m Recent Policy Changes in the EPG EPG 109.11
- 15:08, 16 March 2022 diff hist +4,839 m Category:109 Measurement and Payment →109.11 Compensation for Project Delays (for Sec 109.11): Per CM, expanded guidance to produce more uniform administration of delay claims
- 12:59, 16 March 2022 diff hist -969 m 106.17 New Product Evaluation Per CM, deleted archaic info in "How MoDOT Employees Report Product Tests" and updated the location of the New Products Coordinator from Organizational Results to Construction and Materials.
- 11:22, 14 March 2022 diff hist -14 m 1045.5 Policy on Color of Structural Steel Paint updated link current
- 10:15, 14 March 2022 diff hist +13 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updated broken link