Recent changes

Jump to navigation Jump to search

Track the most recent changes to the wiki on this page.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 05:53, 29 May 2024
   
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

28 May 2024

 m   14:52  902.15 Designing a Traffic Signal‎‎ 2 changes history-27[Hoskir‎ (2×)]
 m   
14:52 (cur | prev) -36 Hoskir talk contribs →‎Table 902.15.6.2.3 Equipment -Power Requirements: updated alignment
 m   
14:40 (cur | prev) +9 Hoskir talk contribs →‎Table 902.15.6.2.3 Equipment -Power Requirements: updated formatting
 m   13:28  Recent Policy Changes in the EPG‎‎ 2 changes history+393[Hoskir‎ (2×)]
 m   
13:28 (cur | prev) +1 Hoskir talk contribs updated
 m   
13:27 (cur | prev) +392 Hoskir talk contribs updated
     10:06  Category:105 Control of Work diffhist +325 Hoskir talk contribs →‎105.15.2 Final Acceptance: updated per email from Dennis B.

23 May 2024

     15:48 Upload log Hoskir talk contribs uploaded File:751.37.1.6 01.png
     15:47  Recent Policy Changes in the EPG diffhist +699 Hoskir talk contribs updated
     15:40  751.37 Drilled Shafts‎‎ 2 changes history+1,457[Hoskir‎ (2×)]
     
15:40 (cur | prev) +1,408 Hoskir talk contribs →‎751.37.1.6 Drilled Shaft General Detail Considerations: updated per RR3878
     
15:29 (cur | prev) +49 Hoskir talk contribs →‎751.37.1.1 Dimensions and Nomenclature: updated per RR3878
     15:27  751.50 Standard Detailing Notes diffhist +675 Hoskir talk contribs →‎G8. Drilled Shaft: updated per RR3878
     12:16  Category:409 Seal Coat diffhist -718 Hoskir talk contribs updated Contract Seal Coat information
     12:15  Category:402 Bituminous Surface Leveling diffhist -578 Hoskir talk contribs updated CLC
 m   11:26  Job Special Provisions diffhist +4 Hoskir talk contribs updated CLC and Seal Coat packages

22 May 2024

     14:50  616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) diffhist +1 Hoskir talk contribs →‎Table 616.3.6 Recommended Length of Longitudinal Buffer Spaces: updated per RR3874
     14:47  Category:408 Prime Coat diffhist +1,345 Hoskir talk contribs →‎408.1.5 Method of Measurement (Sec 408.5): published per RR3877