User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:31, 17 June 2011 diff hist 0 N File:402 June 17 2011 Contract Leveling Course Guidelines.doc current
- 10:30, 17 June 2011 diff hist +6 m Category:402 Bituminous Surface Leveling Per DE and Traffic, most of the sheets in the Traffic Control CLC Templates updated to be in line with current guidance. CLC Guidelines and JSP also updated.
- 09:18, 17 June 2011 diff hist -36 m Main Page EPG 619
- 09:14, 17 June 2011 diff hist -541 m 616.17 Pavement Edge Treatment Per Traffic, Pavement Edge Treatment info was moved to EPG 619 to coordinate with pay items. No change was made to the guidance. current
- 09:10, 17 June 2011 diff hist +66 Category:600 INCIDENTAL CONSTRUCTION new article, EPG 619
- 09:09, 17 June 2011 diff hist +941 N Category:619 Pavement Edge Treatment Per Traffic, Pavement Edge Treatment info was moved from EPG 616.17 to this article to coordinate with pay items. Old EPG 616.17 had no appreciable history since its 2007 beginning. It had 2120 hits.
- 08:53, 16 June 2011 diff hist -9 m Category:134 Engineering Professional Services →134.3.2.6 Supplemental Agreements: PerDesign, updated form
- 08:51, 16 June 2011 diff hist -9 m Category:134 Engineering Professional Services →134.3 Engineering Professional Services Guidelines: Per Design, supplemental PSC approval letter has been updated
- 08:45, 16 June 2011 diff hist -80 m 171.6 Roadsides →RDS(A4) Heritage Database Information (HDI)
- 07:46, 15 June 2011 diff hist +342 m Main Page Fastforward
- 13:57, 13 June 2011 diff hist -158 m Main Page EPG 751 System I
- 13:49, 13 June 2011 diff hist -15 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, guidance added to accommodate new System I, per Sec 1081
- 13:42, 13 June 2011 diff hist +1,590 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per Bridge, guidance added to accommodate new System I, per Sec 1081.
- 13:34, 13 June 2011 diff hist +93 m 751.50 Standard Detailing Notes →A4. Protective Coatings: Per Bridge, guidance added to accommodate new System I, per Sec 1081.
- 12:54, 13 June 2011 diff hist +269 m Main Page EPG 751. revisions
- 12:34, 13 June 2011 diff hist +37 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: addition of link
- 12:31, 13 June 2011 diff hist -2 m 751.22 Prestressed Concrete I Girders →751.22.2.4 Shear: Per Bridge, minor correction of the appearance of a variable
- 12:19, 13 June 2011 diff hist +32 m 751.37 Drilled Shafts →751.37.6 Structural Resistance of Drilled Shafts: Per Bridge, additional of guidance for minimum spacing in EPG 751.37,6.1; removal of a suggested range in EPG 751.37.6.2; and correction of Vs.
- 12:10, 13 June 2011 diff hist +101 m 751.5 Structural Detailing Guidelines →751.5.10 Reinforcing Steel Detailing: Per Bridge, clarification by adding "see EPG 751.37.2.1..." note to Min. Spacing - Ties... in chart
- 11:28, 13 June 2011 diff hist +40 m 751.10 General Superstructure →751.10.3.2 Details: Per Bridge, limits corrected for "No Wearing Surface" cantilevers (to less than 3'-8")
- 11:08, 13 June 2011 diff hist 0 N File:751.22 Intermediate Diaphragms Part Section.jpg current
- 11:08, 13 June 2011 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per Bridge, the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure.
- 11:26, 10 June 2011 diff hist +215 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.10.14
- 11:24, 10 June 2011 diff hist -1 m 136.10 Construction Authorization and Letting →136.10.14 Request for Concurrence
- 11:24, 10 June 2011 diff hist -387 m Main Page EPG 136.10
- 11:21, 10 June 2011 diff hist +3,603 m 136.10 Construction Authorization and Letting Per LPA Coordinator, expanded guidance for LPA's request for concurrence.
- 10:28, 8 June 2011 diff hist +68 m Main Page
- 10:25, 8 June 2011 diff hist -1 m Main Page
- 10:24, 8 June 2011 diff hist 0 N File:Main Page 3 June 8, 2011.jpg current
- 10:24, 8 June 2011 diff hist 0 N File:Main Page 2b June 8, 2011.jpg current
- 10:24, 8 June 2011 diff hist 0 N File:Main Page 2a June 8, 2011.jpg current
- 10:23, 8 June 2011 diff hist +279 m Main Page new photos
- 09:48, 7 June 2011 diff hist 0 N File:Main Page 4 June 2011.jpg current
- 09:48, 7 June 2011 diff hist -189 m Main Page new photo
- 09:10, 7 June 2011 diff hist -97 m Main Page EPG 907.3
- 09:07, 7 June 2011 diff hist +58 m 907.3 Travel Safe Zones →Recommendations: Traffic Safety Quality Circle recommends a min. length of 1 mile for the Travel Safe Zones.
- 15:27, 6 June 2011 diff hist +335 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.10.11
- 15:22, 6 June 2011 diff hist +98 m 136.10 Construction Authorization and Letting →136.10.11 Bidder Qualification Language: Per LPA Coordinator, two subtitles added for clarification
- 15:00, 2 June 2011 diff hist +605 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: 2011 specbook update
- 14:56, 2 June 2011 diff hist +74 m 136.13 Glossary link established
- 14:50, 2 June 2011 diff hist 0 N File:136.10.1 Checklist for Bid Proposal (Fig. 10-1R) Jun 2011.xls current
- 14:50, 2 June 2011 diff hist -14 m 136.10 Construction Authorization and Letting Per LPA Coordinator, reference to specbook updated. Fig. 136.10.1 also updated so as not to refer to the 2004 specbook
- 14:44, 2 June 2011 diff hist -5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.11 Plans, Specifications and Estimate (PS&E) Submittal: Per LPA Coordinator, reference to specbook updated
- 14:42, 2 June 2011 diff hist -16 m 136.13 Glossary Per LPA Coordinator, reference to specbook updated
- 11:11, 2 June 2011 diff hist +14 m Category:903 Highway Signing
- 11:09, 2 June 2011 diff hist +145 m Category:903 Highway Signing new sign shop tour video
- 11:07, 2 June 2011 diff hist +93 m 606.2 Guard Cable new video
- 11:02, 2 June 2011 diff hist +282 m Category:760 General Construction Inspection for Structures video of bridge construction
- 10:32, 2 June 2011 diff hist +6 m 236.7 Negotiation Updated links to contract RW25, per RW
- 09:13, 1 June 2011 diff hist +20 m Main Page EEO Resource Manual