User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:15, 22 July 2011 diff hist +28 m Category:109 Measurement and Payment Per CM updated a QRG, Line Item Adjustments
- 14:02, 22 July 2011 diff hist 0 N File:Line Item Adjustments July 22, 2011.doc current
- 14:01, 22 July 2011 diff hist +14 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM updated a QRG, Line Item Adjustments
- 08:11, 22 July 2011 diff hist +72 m 236.7 Negotiation →236.7.1.7 Public Information Brochure: Link to brochure
- 08:07, 22 July 2011 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) July 22 2011.pdf
- 08:06, 22 July 2011 diff hist -372 m 236.7 Negotiation Per RW Section, updated Form 7-8.2
- 14:41, 21 July 2011 diff hist 0 N File:101 survey.jpg current
- 14:40, 21 July 2011 diff hist 0 N File:101CM.jpg current
- 14:40, 21 July 2011 diff hist 0 N File:101 Bridge.jpg current
- 14:40, 21 July 2011 diff hist +107 m Category:101 Standard Forms added photos
- 12:07, 21 July 2011 diff hist +59 m Main Page added Big Bag link
- 10:57, 21 July 2011 diff hist -1 m 234.6 Diverging Diamond Interchanges →234.6.1 Introduction: Per Springfield district, updated links to Innovation publications
- 09:58, 21 July 2011 diff hist +47 m Main Page EPG 751.14
- 09:50, 21 July 2011 diff hist -636 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per Bridge, removal of H10.16 and H 10.86
- 09:33, 21 July 2011 diff hist +16 m 751.14 Steel Superstructure →751.14.3.4 Wide Flange Splice Tables: Bridge discovered and corrected the errors in the "Total Number of Bolts"
- 07:24, 21 July 2011 diff hist 0 N File:1045.2.5.jpg current
- 07:24, 21 July 2011 diff hist +109 m Category:1045 Paint for Structural Steel →1045.2.5 High Solids Inorganic Zinc Silicate Coating: new photo
- 15:45, 20 July 2011 diff hist -50 m Help Article →Division Contacts: updated divisional contacts
- 08:37, 20 July 2011 diff hist +6 m 751.40 LFD Widening and Repair →751.40.2.6 Temporary Traffic Control Device: cosmetic adjustment
- 08:34, 20 July 2011 diff hist 0 N File:751.40 Temporary Traffic Control Device Section Thru Roadway July 20, 2011.jpg current
- 08:34, 20 July 2011 diff hist +4 m 751.40 LFD Widening and Repair →751.40.2.6 Temporary Traffic Control Device: Corrected figure, per Bridge
- 15:45, 19 July 2011 diff hist 0 N File:104.13 new.jpg current
- 15:45, 19 July 2011 diff hist +4 104.13 Construction Inspection Guidance for Sec 104 →Final Proposal
- 09:13, 19 July 2011 diff hist -60 m 236.6 Appraisal and Appraisal Review →236.6.5.10 Contracting Specialty Appraisals: removal of archaic link
- 15:43, 18 July 2011 diff hist -2 m 616.14 Work Zone Safety and Mobility Policy updated link to MUTCD
- 15:41, 18 July 2011 diff hist -3 m 616.18 Construction Inspection Guidelines for Sec 616 →Material (for Sec 616.2): Updated MUTCD link
- 15:40, 18 July 2011 diff hist -2 m 616.23 Traffic Control for Field Operations Updated MUTCD link
- 15:37, 18 July 2011 diff hist -4 m 616.19 Quality Standards for Temporary Traffic Control Devices updated links to MUTCD
- 14:50, 18 July 2011 diff hist +48 m 620.1 General (MUTCD Chapter 3A) →620.1.3 Materials (MUTCD Section 3A.03): Per Traffic, update of two JSPs (epoxy and high build)
- 14:48, 18 July 2011 diff hist 0 N File:620 High Build Wet Reflective Pavement Markings for Grooves.doc current
- 14:48, 18 July 2011 diff hist 0 N File:620 Epoxy Wet Reflective Pavement Markings for Grooves.doc current
- 14:47, 18 July 2011 diff hist +48 m Category:620 Pavement Marking Per Traffic, update of two JSPs (epoxy and high build)
- 07:44, 18 July 2011 diff hist 0 N File:Main Page July 18, 2011.jpg current
- 07:44, 18 July 2011 diff hist +136 m Main Page new photo
- 13:38, 15 July 2011 diff hist +44 m Category:109 Measurement and Payment Per CM, updated four more QRGs
- 13:34, 15 July 2011 diff hist 0 N File:Change Orders – Value Engineering July 2011.doc current
- 13:34, 15 July 2011 diff hist 0 N File:Change Orders – Time Adjustment July 2011.doc current
- 13:34, 15 July 2011 diff hist 0 N File:Change Orders – Mobilization and Contract Bond July 2011.doc current
- 13:33, 15 July 2011 diff hist 0 N File:Change Orders July 2011.doc current
- 13:33, 15 July 2011 diff hist +22 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated four more QRGs
- 12:09, 15 July 2011 diff hist -121 m Category:109 Measurement and Payment Per CM, updated two QRGs; removed archaic "Change Order - Forwarding for Review" QRG
- 11:28, 15 July 2011 diff hist 0 N File:Change order zero dollar July 2011.doc current
- 11:28, 15 July 2011 diff hist 0 N File:Change order reports July 2011.doc current
- 11:27, 15 July 2011 diff hist +20 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated two QRGs
- 15:08, 14 July 2011 diff hist +29 Category:101 Standard Forms →Quick Reference Guides (QRGs)
- 13:52, 14 July 2011 diff hist 0 m Category:1080 Structural Steel Fabrication
- 13:43, 14 July 2011 diff hist +43 Category:1080 Structural Steel Fabrication
- 09:47, 14 July 2011 diff hist +437 m Category:1080 Structural Steel Fabrication Added videos
- 09:05, 14 July 2011 diff hist +168 m 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: Repacement, per Bridge, of verbiage inadvertently removed
- 13:05, 13 July 2011 diff hist -6 m Category:104 Scope Updated STIP link