User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:19, 22 November 2011 diff hist +171 m Main Page EPG 941.19
- 12:05, 22 November 2011 diff hist 0 N File:941.19 Effect of Grade on SSD.xlsx current
- 11:31, 22 November 2011 diff hist +1 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge,corrected clear spacing requirement for drilled shafts
- 11:18, 22 November 2011 diff hist +6 m 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: Per Bridge, clarification
- 10:35, 22 November 2011 diff hist +309 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, updated design specification note to be used on bridge plans.
- 09:41, 22 November 2011 diff hist -248 m Main Page EPG 774
- 09:17, 22 November 2011 diff hist -1 m Category:774 Cathodic Protection →774.5.2 Routine Cathodic System Evaluation: Section A: clarification
- 09:15, 22 November 2011 diff hist -5 m Category:774 Cathodic Protection updated link
- 09:13, 22 November 2011 diff hist 0 N File:774 Cathodic System Evaluation Example2.docx current
- 09:13, 22 November 2011 diff hist 0 N File:774 Cathodic System Evaluation Example1.docx current
- 09:13, 22 November 2011 diff hist 0 N File:774 Cathodic System Evaluation.docx
- 09:12, 22 November 2011 diff hist +2,108 m Category:774 Cathodic Protection Per Bridge, updated outdated material. Revised forms for better clarity.
- 13:37, 18 November 2011 diff hist 0 m Main Page
- 08:33, 17 November 2011 diff hist +2 m Category:106.3.2 Material Inspection Test Methods Per CM, updated MTRAC logo current
- 08:32, 17 November 2011 diff hist 0 N File:106.3.2.jpg current
- 08:32, 17 November 2011 diff hist +2 m 106.3 Samples, Tests and Cited Specifications →106.3.2 Material Inspection Test Methods: Per CM, updated MTRAC logo
- 09:38, 16 November 2011 diff hist +1 m Category:144 Practical Operations →144.1 Winter Operations Changes
- 09:38, 16 November 2011 diff hist -15 m Category:144 Practical Operations →144.1 Winter Operations Changes: Per CM, updated link
- 16:07, 15 November 2011 diff hist 0 m Category:138 Project Development Chronology updated link
- 15:37, 14 November 2011 diff hist 0 N File:910.2.1 Nov 2011.jpg current
- 15:37, 14 November 2011 diff hist 0 N File:910 Nov 2011.jpg current
- 15:36, 14 November 2011 diff hist +18 m Category:910 Intelligent Transportation Systems New photos
- 14:00, 14 November 2011 diff hist +126 m Main Page EPG 137
- 13:42, 14 November 2011 diff hist 0 N File:137.4.jpg current
- 13:42, 14 November 2011 diff hist -3 m Category:137 Construction Inspection Guidance for Records to be Maintained minor adjustment
- 13:39, 14 November 2011 diff hist 0 N File:137.3 good.jpg current
- 13:39, 14 November 2011 diff hist 0 N File:137.3 poor.jpg current
- 13:38, 14 November 2011 diff hist 0 N File:137.10.1 Nov 2011.jpg current
- 13:38, 14 November 2011 diff hist +353 m Category:137 Construction Inspection Guidance for Records to be Maintained Per Construction & Materials - district, office, naming convention and archiving option info was updated.
- 11:40, 14 November 2011 diff hist +207 m 233.2 At-Grade Intersections with Stop and Yield Control added links to EPG 940.9
- 11:36, 14 November 2011 diff hist +69 m 940.9 Auxiliary Acceleration and Turning Lanes →940.9.10 Offset Right- and Left-Turn Lanes: added links
- 11:30, 14 November 2011 diff hist 0 m 940.9 Auxiliary Acceleration and Turning Lanes →940.9.10 Offset Right- and Left-Turn Lanes
- 11:30, 14 November 2011 diff hist 0 N File:940.9.10 concerns.jpg current
- 11:29, 14 November 2011 diff hist 0 N File:940.9.10 benefits.jpg current
- 11:28, 14 November 2011 diff hist +174 m 940.9 Auxiliary Acceleration and Turning Lanes →940.9.10 Offset Right- and Left-Turn Lanes: Per Traffic& Hwy Safety, figures updated to clarify benefits and concerns.
- 16:14, 10 November 2011 diff hist 0 N File:138 1928 map.jpg current
- 16:13, 10 November 2011 diff hist 0 N File:138 1939 map.jpg current
- 16:12, 10 November 2011 diff hist +46 m Category:138 Project Development Chronology
- 15:59, 10 November 2011 diff hist -2,027 m 751.50 Standard Detailing Notes Per Bridge, silicone expansion joint systems is discontinued on future jobs. H5f note removed.
- 15:22, 10 November 2011 diff hist +12 m Category:138 Project Development Chronology
- 13:32, 10 November 2011 diff hist 0 m 751.10 General Superstructure Per Bridge, corrected misspelling.
- 10:32, 10 November 2011 diff hist -2 m Main Page
- 15:48, 8 November 2011 diff hist +261 m Category:138 Project Development Chronology →Speaking of road maps...: Rte 76
- 15:12, 8 November 2011 diff hist -736 m 751.40 LFD Widening and Repair →751.40.8.12.3.1 Sway Bracing: Per Bridge, for clarification, moved EPG 751.40.8.12.3.1 Sway Bracing info to EPG 32.3.2.1.
- 15:04, 8 November 2011 diff hist 0 N File:751.32.3.2.1.2.jpg current
- 15:04, 8 November 2011 diff hist 0 N File:751.32.3.2.1.1.jpg current
- 15:00, 8 November 2011 diff hist +948 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent: Per Bridge, for clarification, moved EPG 751.40.8.12.3.1 Sway Bracing info to this article.
- 13:07, 8 November 2011 diff hist -27 m Category:144 Practical Operations Per Maintenance, "with AADT of at least 2500" dropped from description of Continuous Operations Map. Districts have flexibility in ID'ing these routes.
- 13:06, 8 November 2011 diff hist -27 m 133.4 Snow and Ice Control Operations →133.4.1 Route Classifications: Per Maintenance, "with AADT of at least 2500" dropped from description of Continuous Operations Map. Districts have flexibility in ID'ing these routes.
- 11:45, 8 November 2011 diff hist -19 m Main Page EPG 751.13