User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:16, 30 November 2011 diff hist 0 N File:136.14.3.1 Obligation Request Form Nov 2011.docx
- 09:15, 30 November 2011 diff hist -696 m LPA:136.12 Figures, Glossary and Other Useful Links Per LP Administrator, the Obligation Request Form was updated
- 10:44, 28 November 2011 diff hist +115 m Category:101 Standard Forms →Construction and Materials: Per CM, added new form, Prestress Deficiency Report
- 14:23, 23 November 2011 diff hist +111 m Main Page EPG 751.14.5
- 14:03, 23 November 2011 diff hist +5 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Clarification, per Bridge
- 13:55, 23 November 2011 diff hist 0 N File:751.14 lateral bracing detail a.jpg current
- 13:54, 23 November 2011 diff hist 0 N File:751.14 longitudinal web stiffener.jpg current
- 13:54, 23 November 2011 diff hist 0 N File:751.14 int web stiffener.jpg current
- 13:53, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 finger plate detail a.jpg current
- 13:53, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 finger plate detail d.jpg current
- 13:52, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 detail a.jpg current
- 13:52, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 detail c.jpg current
- 13:51, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - 42 thru 48.jpg current
- 13:50, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - 36 thru 40.jpg current
- 13:50, 23 November 2011 diff hist 0 N File:751.14 End Diaphragm Connections.jpg current
- 13:49, 23 November 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - optional.jpg current
- 13:48, 23 November 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - preferred.jpg current
- 13:48, 23 November 2011 diff hist 0 N File:751.14 diaphragm connection.jpg current
- 13:47, 23 November 2011 diff hist 0 N File:751.14 Intermediate Diaphragm Connection Plate Optional.jpg current
- 13:46, 23 November 2011 diff hist 0 N File:751.14 Intermediate Diaphragm Connection Plate Preferred.jpg current
- 13:45, 23 November 2011 diff hist 0 N File:751.14 bearing stiffener connections - end diaphragms optional.jpg current
- 13:44, 23 November 2011 diff hist 0 N File:751.14 bearing stiffener connections - end diaphragms preferred.jpg current
- 13:44, 23 November 2011 diff hist 0 N File:751.14 bearing stiffener connections - no end diaphragms.jpg current
- 13:43, 23 November 2011 diff hist +7,861 m 751.14 Steel Superstructure →751.14.5 Details: Per Bridge, revised guidance for greater consistency. EPG 751.14.5.10 added to illustrate consistency in application.
- 13:14, 23 November 2011 diff hist +8 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, re-aligned text
- 13:08, 23 November 2011 diff hist +94 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: link added
- 13:07, 23 November 2011 diff hist +125 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Per LP Administrator, added link to Form 1590 FFATA
- 09:51, 23 November 2011 diff hist +30 m Category:774 Cathodic Protection Per Bridge, updated link to Cathodic System Evaluation form
- 09:49, 23 November 2011 diff hist +90 m Category:101 Standard Forms →Bridge Maintenance: Per Bridge, added Cathodic System Evaulation form
- 12:19, 22 November 2011 diff hist +171 m Main Page EPG 941.19
- 12:05, 22 November 2011 diff hist 0 N File:941.19 Effect of Grade on SSD.xlsx current
- 11:31, 22 November 2011 diff hist +1 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge,corrected clear spacing requirement for drilled shafts
- 11:18, 22 November 2011 diff hist +6 m 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: Per Bridge, clarification
- 10:35, 22 November 2011 diff hist +309 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, updated design specification note to be used on bridge plans.
- 09:41, 22 November 2011 diff hist -248 m Main Page EPG 774
- 09:17, 22 November 2011 diff hist -1 m Category:774 Cathodic Protection →774.5.2 Routine Cathodic System Evaluation: Section A: clarification
- 09:15, 22 November 2011 diff hist -5 m Category:774 Cathodic Protection updated link
- 09:13, 22 November 2011 diff hist 0 N File:774 Cathodic System Evaluation Example2.docx current
- 09:13, 22 November 2011 diff hist 0 N File:774 Cathodic System Evaluation Example1.docx current
- 09:13, 22 November 2011 diff hist 0 N File:774 Cathodic System Evaluation.docx
- 09:12, 22 November 2011 diff hist +2,108 m Category:774 Cathodic Protection Per Bridge, updated outdated material. Revised forms for better clarity.
- 13:37, 18 November 2011 diff hist 0 m Main Page
- 08:33, 17 November 2011 diff hist +2 m Category:106.3.2 Material Inspection Test Methods Per CM, updated MTRAC logo current
- 08:32, 17 November 2011 diff hist 0 N File:106.3.2.jpg current
- 08:32, 17 November 2011 diff hist +2 m 106.3 Samples, Tests and Cited Specifications →106.3.2 Material Inspection Test Methods: Per CM, updated MTRAC logo
- 09:38, 16 November 2011 diff hist +1 m Category:144 Practical Operations →144.1 Winter Operations Changes
- 09:38, 16 November 2011 diff hist -15 m Category:144 Practical Operations →144.1 Winter Operations Changes: Per CM, updated link
- 16:07, 15 November 2011 diff hist 0 m Category:138 Project Development Chronology updated link
- 15:37, 14 November 2011 diff hist 0 N File:910.2.1 Nov 2011.jpg current
- 15:37, 14 November 2011 diff hist 0 N File:910 Nov 2011.jpg current