User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:20, 13 December 2011 diff hist +709 m 751.1 Preliminary Design →751.1.2.32 Aesthetic Enhancements: Per Bridge, to coincide with the release of AASHTO Guildelines on Blast Loading, additional guidance provided to consider blast loading as another load
- 09:23, 12 December 2011 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per Bridge, updated section reference
- 15:56, 9 December 2011 diff hist 0 m Category:102 Bidding Requirements and Conditions minor update
- 12:16, 9 December 2011 diff hist 0 N File:Main Page 4 Dec 8, 2011.jpg current
- 12:16, 9 December 2011 diff hist 0 N File:Main Page 3 Dec 8, 2011.jpg current
- 12:15, 9 December 2011 diff hist 0 N File:Main Page 2 Dec 8, 2011.jpg current
- 12:15, 9 December 2011 diff hist 0 N File:Main Page Dec 8, 2011.jpg current
- 12:15, 9 December 2011 diff hist -178 m Main Page new photos
- 09:16, 8 December 2011 diff hist 0 N File:100.1.2.2.jpg current
- 09:15, 8 December 2011 diff hist +35 m Category:100 GENERAL →100.1.2.2 The Associated General Contractors of Missouri - Missouri Department of Transportation Joint Cooperative Committee: added AGC photo
- 09:07, 8 December 2011 diff hist +54 m Category:1106 Carbide-Tipped Snowplow Blades added video link
- 16:12, 6 December 2011 diff hist +118 m Main Page EPG 133.4.1
- 15:54, 6 December 2011 diff hist +18 m Category:144 Practical Operations NW district continuous operation routes updated, per Maintenance.
- 15:53, 6 December 2011 diff hist 0 N File:144.1 nw dec 2011.pdf current
- 15:52, 6 December 2011 diff hist 0 N File:144.1 continuous operations dec 2011.pdf current
- 15:52, 6 December 2011 diff hist +18 m 133.4 Snow and Ice Control Operations NW district continuous operation routes updated, per Maintenance
- 15:00, 5 December 2011 diff hist -302 m Main Page EPG 236.5.21
- 14:57, 5 December 2011 diff hist -1,355 m 236.5 Property Management E 236.5.21.1 Billboard Clause was removed and the remaining portion of the subarticle renumbered, per RW
- 14:53, 5 December 2011 diff hist -200 m 236.7 Negotiation E 236.5.21.1 Billboard Clause was removed and the remaining portion of the subarticle renumbered, per RW
- 13:47, 5 December 2011 diff hist +26 m Main Page EPG 751.50
- 13:30, 5 December 2011 diff hist -162 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per Bridge, A5.5 removed. The A5.5 definition is included in the standard specifications and is therefore redundant on our plans.
- 13:26, 5 December 2011 diff hist 0 N File:751.1 Prelim Design SI&A form (pg 2).jpg current
- 13:25, 5 December 2011 diff hist 0 N File:751.1 Prelim Design SI&A form (pg 1).jpg current
- 13:25, 5 December 2011 diff hist +12 m 751.1 Preliminary Design →751.1.2.12 Replacing an Existing Structure: Per Bridge, updated figure of SI&A form
- 14:44, 2 December 2011 diff hist -48 m Main Page
- 14:32, 2 December 2011 diff hist +114 m Main Page EPG 751.40.4.3
- 14:13, 2 December 2011 diff hist -18 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, numerous minor revisions to bring the EPG guidance into compliance with the standard plans for thrie beam.
- 13:59, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.jpg current
- 13:57, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Details of Post.jpg current
- 13:55, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Detail B.jpg current
- 13:54, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Part Section.jpg current
- 13:52, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section CC.jpg current
- 13:51, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section DD.jpg current
- 13:49, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Details of Post.jpg current
- 13:47, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Detail B.jpg current
- 13:46, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Section.jpg current
- 13:42, 2 December 2011 diff hist -31 751.40 LFD Widening and Repair →751.40.2.5 Filled Joints: Replacement of diagrams
- 13:40, 2 December 2011 diff hist -83 m 751.40 LFD Widening and Repair →751.40.2.4.1 Cast-in-Place Deck: Replacement of diagrams
- 13:31, 2 December 2011 diff hist +979 m 751.40 LFD Widening and Repair Per Bridge, numerous minor revisions to bring the EPG guidance into compliance with the standard plans for thrie beam.
- 12:24, 1 December 2011 diff hist 0 N File:751.32.4.2 part plan Dec 2011.jpg current
- 12:24, 1 December 2011 diff hist +9 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.2 Encased Pile Cap Bent: Correction of Part Plan detail,per Bridge
- 09:31, 1 December 2011 diff hist +1 m Main Page
- 09:08, 1 December 2011 diff hist +1 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge, clarified title for E 2.25
- 08:55, 1 December 2011 diff hist +1 m 132.4 Highway Safety Plan and Performance Plan Updated link to highway safety plan
- 10:30, 30 November 2011 diff hist +22 m Category:144 Practical Operations →144.2 Signing Operations Changes: Added Sign Management System link
- 10:28, 30 November 2011 diff hist +79 m Category:903 Highway Signing added Sign Management System link
- 09:45, 30 November 2011 diff hist +322 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.
- 09:42, 30 November 2011 diff hist 0 N File:136.6.7 Sample Solicitation Nov 2011.docx
- 09:41, 30 November 2011 diff hist 0 N File:136.6.2 Consultant Selection Criteria (Fig. 6-2) Nov 2011.doc current
- 09:36, 30 November 2011 diff hist -2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.