User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:49, 16 December 2011 diff hist +183 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.4 Links to Other Resources: Per LPA, added two links
- 16:08, 14 December 2011 diff hist 0 N File:139 Daniel Boone.jpg current
- 16:08, 14 December 2011 diff hist +214 m Category:139 Design - Build Added Daniel Boone project link
- 14:15, 14 December 2011 diff hist 0 N File:236.7 Form 7-8.1a.docx
- 14:14, 14 December 2011 diff hist 0 N File:236.7 Form 7-8.1.docx
- 14:14, 14 December 2011 diff hist +12 m 236.7 Negotiation minor adjustment of file name
- 14:13, 14 December 2011 diff hist +17 m 236.7 Negotiation Per RW, updated Form 7-8.1 and added Form 7-8.1a.
- 13:57, 14 December 2011 diff hist +148 m 236.11 Mediation Per RW, added new Form 11.2.2a.
- 13:51, 14 December 2011 diff hist 0 N File:236.6.5.3a Renewal Application fo Employment as Contract Appraiser (Form 6.5.3a).docx
- 13:51, 14 December 2011 diff hist 0 N File:236.6.5.3 Application for Employment as Contract Appraiser (Form 6.5.3) Dec 2011.docx
- 13:50, 14 December 2011 diff hist +188 m 236.6 Appraisal and Appraisal Review Per RW, updated Form 236.6.5.3 and added new Form 236.6.5.3a
- 09:32, 14 December 2011 diff hist 0 N File:134.3 PSC Approval Letter Request to Execute Sup Contract DBE.docx
- 09:32, 14 December 2011 diff hist 0 N File:134.3 PSC Approval to Solicit Consultants Letter.docx
- 09:31, 14 December 2011 diff hist -236 m Category:134 Engineering Professional Services →134.3 Engineering Professional Services Guidelines: Per Design, updated two PSC approval forms
- 09:30, 14 December 2011 diff hist -72 m Category:101 Standard Forms →Engineering Professional Services: Per Design, updated a PSC approval form
- 15:30, 13 December 2011 diff hist +1 m Main Page
- 13:44, 13 December 2011 diff hist +231 m Main Page EPG 751.1
- 13:26, 13 December 2011 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents updated link
- 13:25, 13 December 2011 diff hist 0 m 751.34 Concrete Pile Cap Non-Integral End Bents updated link
- 13:25, 13 December 2011 diff hist 0 m 751.31 Open Concrete Intermediate Bents updated link
- 13:23, 13 December 2011 diff hist +267 m 751.2 Loads →751.2.2 Transient Loads: Per Bridge, to coincide with the release of AASHTO Guildelines on Blast Loading, additional guidance provided to consider blast loading as another load
- 13:20, 13 December 2011 diff hist +709 m 751.1 Preliminary Design →751.1.2.32 Aesthetic Enhancements: Per Bridge, to coincide with the release of AASHTO Guildelines on Blast Loading, additional guidance provided to consider blast loading as another load
- 09:23, 12 December 2011 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per Bridge, updated section reference
- 15:56, 9 December 2011 diff hist 0 m Category:102 Bidding Requirements and Conditions minor update
- 12:16, 9 December 2011 diff hist 0 N File:Main Page 4 Dec 8, 2011.jpg current
- 12:16, 9 December 2011 diff hist 0 N File:Main Page 3 Dec 8, 2011.jpg current
- 12:15, 9 December 2011 diff hist 0 N File:Main Page 2 Dec 8, 2011.jpg current
- 12:15, 9 December 2011 diff hist 0 N File:Main Page Dec 8, 2011.jpg current
- 12:15, 9 December 2011 diff hist -178 m Main Page new photos
- 09:16, 8 December 2011 diff hist 0 N File:100.1.2.2.jpg current
- 09:15, 8 December 2011 diff hist +35 m Category:100 GENERAL →100.1.2.2 The Associated General Contractors of Missouri - Missouri Department of Transportation Joint Cooperative Committee: added AGC photo
- 09:07, 8 December 2011 diff hist +54 m Category:1106 Carbide-Tipped Snowplow Blades added video link
- 16:12, 6 December 2011 diff hist +118 m Main Page EPG 133.4.1
- 15:54, 6 December 2011 diff hist +18 m Category:144 Practical Operations NW district continuous operation routes updated, per Maintenance.
- 15:53, 6 December 2011 diff hist 0 N File:144.1 nw dec 2011.pdf current
- 15:52, 6 December 2011 diff hist 0 N File:144.1 continuous operations dec 2011.pdf current
- 15:52, 6 December 2011 diff hist +18 m 133.4 Snow and Ice Control Operations NW district continuous operation routes updated, per Maintenance
- 15:00, 5 December 2011 diff hist -302 m Main Page EPG 236.5.21
- 14:57, 5 December 2011 diff hist -1,355 m 236.5 Property Management E 236.5.21.1 Billboard Clause was removed and the remaining portion of the subarticle renumbered, per RW
- 14:53, 5 December 2011 diff hist -200 m 236.7 Negotiation E 236.5.21.1 Billboard Clause was removed and the remaining portion of the subarticle renumbered, per RW
- 13:47, 5 December 2011 diff hist +26 m Main Page EPG 751.50
- 13:30, 5 December 2011 diff hist -162 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per Bridge, A5.5 removed. The A5.5 definition is included in the standard specifications and is therefore redundant on our plans.
- 13:26, 5 December 2011 diff hist 0 N File:751.1 Prelim Design SI&A form (pg 2).jpg current
- 13:25, 5 December 2011 diff hist 0 N File:751.1 Prelim Design SI&A form (pg 1).jpg current
- 13:25, 5 December 2011 diff hist +12 m 751.1 Preliminary Design →751.1.2.12 Replacing an Existing Structure: Per Bridge, updated figure of SI&A form
- 14:44, 2 December 2011 diff hist -48 m Main Page
- 14:32, 2 December 2011 diff hist +114 m Main Page EPG 751.40.4.3
- 14:13, 2 December 2011 diff hist -18 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, numerous minor revisions to bring the EPG guidance into compliance with the standard plans for thrie beam.
- 13:59, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.jpg current
- 13:57, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Details of Post.jpg current