User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:16, 12 March 2012 diff hist +1,099 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.17 Number of Signal Faces on an Approach (MUTCD Section 4D.11): Per Traffic, guidance clarified by providing additional information on where to install the reflectorized backplates.
- 12:56, 12 March 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines Feb 17, 2012.pdf
- 12:56, 12 March 2012 diff hist 0 m Category:402 Bituminous Surface Leveling uploaded pdf
- 12:31, 12 March 2012 diff hist +32 m Category:206 Excavation for Structures Per RM, added link to Risk Management manual.
- 11:08, 12 March 2012 diff hist 0 N File:Main Page Mar 12, 2012.jpg current
- 11:08, 12 March 2012 diff hist +19 m Main Page new photo
- 09:29, 12 March 2012 diff hist -2 m Main Page
- 09:27, 12 March 2012 diff hist 0 m Main Page
- 15:00, 9 March 2012 diff hist 0 m Main Page
- 14:42, 9 March 2012 diff hist +1 m 616.25 MoDOT Work Zone Guidelines
- 14:42, 9 March 2012 diff hist 0 N File:616.25 WZ Coord Contacts.docx
- 14:41, 9 March 2012 diff hist -25 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated WZ Coordinators Contacts list
- 12:10, 9 March 2012 diff hist -2 m 751.8 Concrete Box Culverts →751.8.3.1 Joints: minor correction
- 12:04, 9 March 2012 diff hist 0 m Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe →1028.2.1.4 Field Inspection: Per Bridge, replaced reference to Sec 728 with Sec 730
- 12:03, 9 March 2012 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.2.2 Roadways with ADT ≤ 3500: Per Bridge, replaced reference to Sec 728 with Sec 730
- 12:01, 9 March 2012 diff hist -76 m Category:206 Excavation for Structures Per Bridge, removal of Sec 728 link
- 10:07, 9 March 2012 diff hist +20 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 10:05, 9 March 2012 diff hist +1 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 10:04, 9 March 2012 diff hist -1 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 15:48, 8 March 2012 diff hist 0 N File:236.16 ODA Controlled Routes Description Mar 8, 2012.pdf
- 15:48, 8 March 2012 diff hist -2 m 236.16 Outdoor Advertising Per RW, updated ODA Controlled Routes description
- 15:46, 8 March 2012 diff hist 0 N File:236.17 Junkyard Controlled Routes Mar 8, 2012.pdf
- 15:46, 8 March 2012 diff hist -1 m 236.17 Junkyards Per RW, updated Junkyard Controlled Routes description
- 14:30, 8 March 2012 diff hist +32 m 236.5 Property Management Per RW, updated "Internet Posting Request" form
- 10:50, 8 March 2012 diff hist 0 m 750.4 Storm Sewers →750.4.2 Drainage System Layout Criteria: Per Bridge, minor update
- 10:15, 8 March 2012 diff hist 0 N File:907.4.jpg current
- 10:15, 8 March 2012 diff hist 0 N File:907.4 MUARP.pdf current
- 10:15, 8 March 2012 diff hist -145 m 907.4 Missouri Uniform Accident Report Per Traffic, updated to refer to 2012 MO Uniform Accident Report Preparation Manual
- 10:20, 7 March 2012 diff hist -162 m 460.3 Plant Inspection →460.3.9 Mineral Filler, Hydrated Lime, and Baghouse Fines: Per CM, archaic reference to "Mineral Filler" and "Hydrated Lime" records deleted.
- 09:48, 7 March 2012 diff hist +15 m Main Page updated 616 link
- 09:48, 7 March 2012 diff hist +55 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Special Warning Signs (MUTCD 6F.51): added link
- 09:42, 7 March 2012 diff hist +3 m Main Page
- 09:41, 7 March 2012 diff hist 0 N File:Main Page 4 Mar 7, 2012.jpg current
- 09:41, 7 March 2012 diff hist 0 N File:Main Page 3 Mar 7, 2012.jpg current
- 09:41, 7 March 2012 diff hist 0 N File:Main Page 2 Mar 7, 2012.jpg current
- 09:40, 7 March 2012 diff hist 0 N File:Main Page Mar 7, 2012.jpg current
- 09:40, 7 March 2012 diff hist -726 m Main Page new photos
- 12:52, 6 March 2012 diff hist 0 m 751.8 Concrete Box Culverts →751.8.1.5 Precast Culvert: Per Bridge, corrected link
- 11:28, 6 March 2012 diff hist -141 m Category:130 Value Engineering Per CM, updated VE Change Proposal C-104
- 11:25, 6 March 2012 diff hist 0 N File:C-104.doc current
- 11:25, 6 March 2012 diff hist -70 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, updated VE Change Proposal C-104
- 11:15, 6 March 2012 diff hist +69 m Category:1002 Aggregate for Asphaltic Concrete →1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA): Per CM, added link to suppliers for Qualified Mineral Filler for SMA.
- 11:13, 6 March 2012 diff hist +159 m 460.3 Plant Inspection →460.3.9 Mineral Filler, Hydrated Lime, and Baghouse Fines: Per CM, added link to suppliers for Qualified Mineral Filler for SMA.
- 10:49, 6 March 2012 diff hist -48 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Special Warning Signs (MUTCD 6F.51): Per Traffic and Design, "Drive Smart" and "Pt of Presence" signs are no longer Commission furnished.
- 10:24, 6 March 2012 diff hist +131 m Category:900 TRAFFIC CONTROL updated link
- 10:08, 6 March 2012 diff hist -358 m Main Page E 616
- 09:56, 6 March 2012 diff hist +48 m 616.23 Traffic Control for Field Operations added link
- 09:38, 6 March 2012 diff hist +63 N 616.30 Work Zone Capacity, Queue and Travel Delay 616.30 Work Zone Capacity, Queue and Travel Delay moved to 616.13 Work Zone Capacity, Queue and Travel Delay: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD. current
- 09:38, 6 March 2012 diff hist 0 m 616.13 Work Zone Capacity, Queue and Travel Delay 616.30 Work Zone Capacity, Queue and Travel Delay moved to 616.13 Work Zone Capacity, Queue and Travel Delay: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 09:33, 6 March 2012 diff hist +303 m Category:616 Temporary Traffic Control →2009 MUTCD Compliance: adjusted table