User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:33, 15 March 2012 diff hist 0 N File:236.6.4.4 Adjustment of Value or Just Compensation Form 6.4.4 Mar 2012.doc current
- 13:33, 15 March 2012 diff hist +27 m 236.6 Appraisal and Appraisal Review Per RW, updated Adjustment of Value or Just Compensation form.
- 11:17, 15 March 2012 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) Mar 15, 2012.pdf
- 11:17, 15 March 2012 diff hist 0 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 10:52, 15 March 2012 diff hist -530 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Special Warning Signs (MUTCD 6F.51)
- 10:49, 15 March 2012 diff hist -66 m Main Page undid previous EPG 616.6.51 banner
- 10:40, 15 March 2012 diff hist +64 m Main Page EPG 616.6.51
- 10:17, 15 March 2012 diff hist 0 N File:616.6.51.jpg current
- 10:17, 15 March 2012 diff hist +530 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Special Warning Signs (MUTCD 6F.51): Per Traffic, guidance provided for the "Completed as Promised" decal and new RATE OUR WORK ZONE sign.
- 09:50, 15 March 2012 diff hist +130 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) uploaded Fig. 616.2.4
- 09:44, 15 March 2012 diff hist +288 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) updated links
- 09:35, 15 March 2012 diff hist -81 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per Design, "Point of Presence" signing is to be included in the job estimate as construction signing.
- 09:25, 15 March 2012 diff hist -81 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Special Warning Signs (MUTCD 6F.51): Per Design, Point of Presence responsibilities clarified
- 09:20, 15 March 2012 diff hist +30 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.16 Temporary Two-Lane, Two-Way Operations: updated link
- 09:17, 15 March 2012 diff hist +39 m 236.11 Mediation Per RW, updated link to Form 11.2.2a
- 08:48, 15 March 2012 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) Mar 14, 2012.pdf
- 07:51, 15 March 2012 diff hist +30 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.50
- 07:50, 15 March 2012 diff hist +30 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.50: updated link
- 07:48, 15 March 2012 diff hist +71 m 616.23 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: Per Traffic, updated "NO CENTER STRIPE" sign to "NO CENTER LINE".
- 14:29, 14 March 2012 diff hist 0 N File:616.25 WZ Coord Contacts Mar 14, 2012.docx
- 14:29, 14 March 2012 diff hist +13 m 616.25 MoDOT Work Zone Guidelines →Strategies to Improve Work Zones: Per Traffic, updated WZ Coordinators Contacts list
- 14:20, 14 March 2012 diff hist -2 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 12:08, 13 March 2012 diff hist 0 N File:Diaries.docx
- 12:08, 13 March 2012 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Diaries QRG.
- 11:24, 13 March 2012 diff hist +11 m Category:702 Load-Bearing Piles →702.1.3 Test Piles (Sec 702.2.5): minor correction
- 07:33, 13 March 2012 diff hist -112 m 902.19 Construction Inspection Guidelines for Sec 902 →Installation Of Posts And Signal Heads (for Sec 902.5): Per Traffic, reference to aluminum housings was removed to comply with Sec 1092.1.1 (which requires polycarbonate housing)
- 15:25, 12 March 2012 diff hist +66 m Main Page EPG 902.5 and EPG 101
- 15:19, 12 March 2012 diff hist 0 N File:Sample Record General.docx
- 15:19, 12 March 2012 diff hist -8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Sample Record General Information
- 15:16, 12 March 2012 diff hist +1,099 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.17 Number of Signal Faces on an Approach (MUTCD Section 4D.11): Per Traffic, guidance clarified by providing additional information on where to install the reflectorized backplates.
- 12:56, 12 March 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines Feb 17, 2012.pdf
- 12:56, 12 March 2012 diff hist 0 m Category:402 Bituminous Surface Leveling uploaded pdf
- 12:31, 12 March 2012 diff hist +32 m Category:206 Excavation for Structures Per RM, added link to Risk Management manual.
- 11:08, 12 March 2012 diff hist 0 N File:Main Page Mar 12, 2012.jpg current
- 11:08, 12 March 2012 diff hist +19 m Main Page new photo
- 09:29, 12 March 2012 diff hist -2 m Main Page
- 09:27, 12 March 2012 diff hist 0 m Main Page
- 15:00, 9 March 2012 diff hist 0 m Main Page
- 14:42, 9 March 2012 diff hist +1 m 616.25 MoDOT Work Zone Guidelines
- 14:42, 9 March 2012 diff hist 0 N File:616.25 WZ Coord Contacts.docx
- 14:41, 9 March 2012 diff hist -25 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated WZ Coordinators Contacts list
- 12:10, 9 March 2012 diff hist -2 m 751.8 Concrete Box Culverts →751.8.3.1 Joints: minor correction
- 12:04, 9 March 2012 diff hist 0 m Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe →1028.2.1.4 Field Inspection: Per Bridge, replaced reference to Sec 728 with Sec 730
- 12:03, 9 March 2012 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.2.2 Roadways with ADT ≤ 3500: Per Bridge, replaced reference to Sec 728 with Sec 730
- 12:01, 9 March 2012 diff hist -76 m Category:206 Excavation for Structures Per Bridge, removal of Sec 728 link
- 10:07, 9 March 2012 diff hist +20 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 10:05, 9 March 2012 diff hist +1 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 10:04, 9 March 2012 diff hist -1 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 15:48, 8 March 2012 diff hist 0 N File:236.16 ODA Controlled Routes Description Mar 8, 2012.pdf
- 15:48, 8 March 2012 diff hist -2 m 236.16 Outdoor Advertising Per RW, updated ODA Controlled Routes description