User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:40, 21 December 2012 diff hist -6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, note in Fig. 136.4.17 added about PE ceiling or CE ceiling amounts
- 13:35, 20 December 2012 diff hist -320 m Main Page
- 13:33, 20 December 2012 diff hist 0 N File:Main Page Dec 20, 2012.jpg current
- 13:33, 20 December 2012 diff hist -516 m Main Page
- 11:55, 20 December 2012 diff hist -35 m Category:206 Excavation for Structures →206.2 Class 3 Excavation
- 10:56, 20 December 2012 diff hist -59 m Main Page EPG 206
- 10:43, 20 December 2012 diff hist 0 N File:206.2.jpg current
- 10:42, 20 December 2012 diff hist -114 Category:206 Excavation for Structures →206.2 Class 3 Excavation: Per CM, revision provides pay quantities that allow the contractor to bid more accurately
- 14:47, 19 December 2012 diff hist +1 m Main Page
- 11:52, 19 December 2012 diff hist +712 m Category:138 Project Development Chronology →Speaking of road maps...: added app info
- 08:15, 19 December 2012 diff hist +167 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per Design, updated links
- 13:33, 18 December 2012 diff hist +52 m Main Page E 101 QRG
- 13:31, 18 December 2012 diff hist 0 N File:Sample Record General December 2012.docx
- 13:30, 18 December 2012 diff hist +14 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Sample Record General QRG
- 11:03, 18 December 2012 diff hist 0 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)
- 10:53, 18 December 2012 diff hist +27 m Main Page EPG 903.5.30
- 10:18, 18 December 2012 diff hist +17 m LPA:136.10 Advertisement for Bid and Project Award →136.10.7.1.2 Responsible Bidder: updated link
- 10:15, 18 December 2012 diff hist +12 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.7: updated link
- 10:14, 18 December 2012 diff hist +11 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) updated links
- 10:13, 18 December 2012 diff hist -80 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) updated links
- 10:08, 18 December 2012 diff hist +11 m 903.20 Signing for Bicycle Facilities updated link
- 10:08, 18 December 2012 diff hist +11 m 234.6 Diverging Diamond Interchanges →234.6.2.2.12 Signals: updated link.
- 10:05, 18 December 2012 diff hist +11 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.17 Do Not Block Intersection Markings (MUTCD Section 3B.17): updated link
- 10:04, 18 December 2012 diff hist +11 m 903.19 Signing for Rail and Light Rail Transit Grade Crossings →903.20.8 Turn Restrictions During Preemption (MUTCD Section 8B.08): updated link
- 10:03, 18 December 2012 diff hist +11 m Main Page
- 10:02, 18 December 2012 diff hist -12 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes
- 10:00, 18 December 2012 diff hist 0 N File:R10-30.jpg current
- 09:59, 18 December 2012 diff hist 0 N File:R10-15.jpg current
- 09:59, 18 December 2012 diff hist +437 m 903.5 Regulatory Signs Per Traffic, general clarifications to EPG 903.5.30.
- 08:33, 18 December 2012 diff hist 0 Main Page
- 08:25, 18 December 2012 diff hist -159 m Main Page EPG 606.2.3
- 15:32, 17 December 2012 diff hist 0 m Main Page
- 08:43, 14 December 2012 diff hist 0 m Main Page
- 08:39, 14 December 2012 diff hist 0 N File:Main Page Dec 14, 2012.jpg current
- 08:39, 14 December 2012 diff hist -74 m Main Page new photo
- 11:48, 13 December 2012 diff hist 0 N File:Main Page 4 Dec 13, 2012.jpg current
- 11:48, 13 December 2012 diff hist +54 m Main Page new photo
- 08:11, 13 December 2012 diff hist -1 Main Page
- 08:10, 13 December 2012 diff hist +39 m Main Page
- 16:09, 12 December 2012 diff hist +308 m 106.19 Materials Acceptance →106.19.2.3 Leftover Material: Per CM, clarification
- 15:57, 12 December 2012 diff hist 0 N File:Main Page 3 Dec 12, 2012.jpg current
- 15:57, 12 December 2012 diff hist +653 m Main Page EPG 172
- 15:04, 12 December 2012 diff hist -487 m Category:172 Maintenance Facility Performance Expectations Environmental Compliance Per Environmental, minor clarifications and added a link to tools to assist with SPCC plan development.
- 08:46, 12 December 2012 diff hist 0 N File:Main Page Dec 12, 2012.jpg current
- 08:45, 12 December 2012 diff hist -122 m Main Page new photo
- 14:43, 11 December 2012 diff hist -54 m Main Page EPG 134
- 14:27, 11 December 2012 diff hist +930 m Category:134 Engineering Professional Services Per Design, added numerous group email addresses as well as an adjustment in the distribution and copies of executed contracts.
- 15:40, 10 December 2012 diff hist +6 m 902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C) Per Traffic, updated link
- 13:54, 10 December 2012 diff hist -8 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per Design, forms presented in numerical order
- 12:15, 10 December 2012 diff hist +101 m Main Page EPG 108.11