User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:47, 4 January 2013 diff hist 0 m 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths 132.2 Missouri's Blueprint to Arrive Alive moved to 132.2 Missouri's Blueprint to Save More Lives
- 08:47, 4 January 2013 diff hist +59 N 132.2 Missouri's Blueprint to Arrive Alive 132.2 Missouri's Blueprint to Arrive Alive moved to 132.2 Missouri's Blueprint to Save More Lives
- 08:30, 4 January 2013 diff hist -14 m 147.3 Job Order Contracting (JOC) Per Bidding and Contracts, guard cable jsp not sufficiently ready for display
- 08:25, 4 January 2013 diff hist +44 m 147.3 Job Order Contracting (JOC) added link
- 08:24, 4 January 2013 diff hist 0 N File:148 asphalt pavement repair 2013.doc current
- 08:24, 4 January 2013 diff hist 0 N File:148 bridge 2013.doc current
- 08:23, 4 January 2013 diff hist 0 N File:148 concrete pavement repair 2013.doc current
- 08:23, 4 January 2013 diff hist 0 N File:148 fence 2013.doc current
- 08:23, 4 January 2013 diff hist 0 N File:148 guard cable 2013.doc current
- 08:23, 4 January 2013 diff hist 0 N File:148 guardrail 2013.doc current
- 08:22, 4 January 2013 diff hist +35 m 147.3 Job Order Contracting (JOC) Per Bidding and Contract Services, updated JOC JSPs.
- 08:21, 2 January 2013 diff hist 0 m Main Page
- 14:02, 31 December 2012 diff hist +44 m Main Page EPG 105.23
- 13:44, 31 December 2012 diff hist +6,410 m Category:105 Control of Work Per CM, new subarticle. More info will follow. QM is now being included in almost all (95%) projects. QM is now being included in almost all projects. QM is not optional & is part of Bolder 5 Yr.
- 14:29, 28 December 2012 diff hist 0 m Main Page
- 13:13, 27 December 2012 diff hist -5 m Main Page
- 11:35, 27 December 2012 diff hist +7 m Main Page
- 11:34, 27 December 2012 diff hist -7 m Main Page
- 11:21, 27 December 2012 diff hist 0 N File:748.7 Figure Example Grade Separation Profile without Borings.pdf
- 11:12, 27 December 2012 diff hist 0 N File:Main Page 3 Dec 27, 2012.jpg current
- 11:12, 27 December 2012 diff hist 0 N File:Main Page 2 Dec 27, 2012.jpg current
- 11:12, 27 December 2012 diff hist 0 N File:Main Page Dec 27, 2012.jpg current
- 11:11, 27 December 2012 diff hist -59 m Main Page new photos
- 09:57, 27 December 2012 diff hist 0 N File:643.2 Certification of Consultant 2012.doc current
- 09:57, 27 December 2012 diff hist +10 m 643.2 Local Utility Adjustments - Public and Private Per Design, correct "Certification of Consultant" form now provided
- 08:14, 27 December 2012 diff hist +207 m LPA:136.13 LPA Policy Changes Fig. 136.11.9
- 08:12, 27 December 2012 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.11.9
- 08:11, 27 December 2012 diff hist +8 m LPA:136.11 Local Public Agency Construction Per LPA, updated reference of Fig. 136.11.9 from "Contractor Certification" to "Contractor DBE Certification".
- 09:30, 26 December 2012 diff hist 0 m Main Page
- 15:28, 21 December 2012 diff hist +185 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.12 Signal Indications – Design, Illumination, Color, and Shape (MUTCD Section 4D.06): Per Traffic, added reference to two documents
- 11:44, 21 December 2012 diff hist 0 m LPA:136.13 LPA Policy Changes
- 11:43, 21 December 2012 diff hist +118 m LPA:136.13 LPA Policy Changes Fig. 136.4.17
- 11:41, 21 December 2012 diff hist -3 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.17
- 11:40, 21 December 2012 diff hist 0 N File:136.4.17 Dec 2012.xlsx current
- 11:40, 21 December 2012 diff hist -6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, note in Fig. 136.4.17 added about PE ceiling or CE ceiling amounts
- 13:35, 20 December 2012 diff hist -320 m Main Page
- 13:33, 20 December 2012 diff hist 0 N File:Main Page Dec 20, 2012.jpg current
- 13:33, 20 December 2012 diff hist -516 m Main Page
- 11:55, 20 December 2012 diff hist -35 m Category:206 Excavation for Structures →206.2 Class 3 Excavation
- 10:56, 20 December 2012 diff hist -59 m Main Page EPG 206
- 10:43, 20 December 2012 diff hist 0 N File:206.2.jpg current
- 10:42, 20 December 2012 diff hist -114 Category:206 Excavation for Structures →206.2 Class 3 Excavation: Per CM, revision provides pay quantities that allow the contractor to bid more accurately
- 14:47, 19 December 2012 diff hist +1 m Main Page
- 11:52, 19 December 2012 diff hist +712 m Category:138 Project Development Chronology →Speaking of road maps...: added app info
- 08:15, 19 December 2012 diff hist +167 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per Design, updated links
- 13:33, 18 December 2012 diff hist +52 m Main Page E 101 QRG
- 13:31, 18 December 2012 diff hist 0 N File:Sample Record General December 2012.docx
- 13:30, 18 December 2012 diff hist +14 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Sample Record General QRG
- 11:03, 18 December 2012 diff hist 0 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)
- 10:53, 18 December 2012 diff hist +27 m Main Page EPG 903.5.30