- 16:08, 28 February 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.4.9
- 16:08, 28 February 2013 diff hist 0 N File:136.4.9 Feb 2013.doc current
- 16:07, 28 February 2013 diff hist +8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, in Fig. 136.4.9 a sentence added regarding a city not being staffed to do engineering work and the need to hire a consultant.
- 15:58, 28 February 2013 diff hist -12 m Main Page EPG 751.50
- 15:56, 28 February 2013 diff hist +267 m 751.50 Standard Detailing Notes →I1. General: Per Bridge, added new note, I1.67 for field welding new stiffeners or new connection connection plates to existing steel.
- 15:35, 28 February 2013 diff hist +209 m Main Page EPG 134
- 14:54, 28 February 2013 diff hist +813 m Category:134 Engineering Professional Services Per Design, updated electronic and hard copy distribution of contracts and supplemental agreements.
- 13:44, 28 February 2013 diff hist +50 m Main Page
- 13:40, 28 February 2013 diff hist +1 m Main Page
- 13:35, 28 February 2013 diff hist 0 File:Main Page 4 Feb 28, 2013.jpg uploaded a new version of "Image:Main Page 4 Feb 28, 2013.jpg" current
- 13:35, 28 February 2013 diff hist 0 N File:Main Page 4 Feb 28, 2013.jpg
- 13:34, 28 February 2013 diff hist +419 m Main Page new photo
- 12:07, 28 February 2013 diff hist -12 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per Design, removed one email group
- 15:52, 27 February 2013 diff hist -1 m Main Page
- 15:26, 27 February 2013 diff hist +6 m Main Page
- 15:03, 27 February 2013 diff hist +90 m Main Page EPG 751.37
- 14:56, 27 February 2013 diff hist +785 m 751.37 Drilled Shafts →751.37.6 Structural Resistance of Drilled Shafts: Per Bridge, clarified column and drilled shaft longitudinal reinforcement requirements and drilled shaft transverse reinforcement requirements.
- 14:13, 27 February 2013 diff hist +351 m 751.31 Open Concrete Intermediate Bents →751.31.2.3 General Design Assumptions: Per Bridge, clarified column and drilled shaft longitudinal reinforcement requirements and drilled shaft transverse reinforcement requirements.
- 13:54, 27 February 2013 diff hist 0 N File:Main Page 5 Feb 27, 2013.jpg current
- 13:54, 27 February 2013 diff hist 0 N File:Main Page 4 Feb 27, 2013.jpg current
- 13:54, 27 February 2013 diff hist 0 N File:Main Page 3 Feb 27, 2013.jpg current
- 13:54, 27 February 2013 diff hist 0 N File:Main Page 2 Feb 27, 2013.jpg current
- 13:53, 27 February 2013 diff hist +157 m Main Page new photos
- 12:20, 27 February 2013 diff hist +36 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant: Per Design, updated members of the PSC
- 16:23, 26 February 2013 diff hist +180 m LPA:136.13 LPA Policy Changes Fig. 136.4.7
- 16:22, 26 February 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig. 136.4.7
- 16:21, 26 February 2013 diff hist 0 N File:136.4.7 Feb 2013.doc current
- 16:21, 26 February 2013 diff hist +16 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.7, Sample Solicitation & Sample Scope of Services updated to include "right of way plans" in the sample scope of services
- 15:46, 26 February 2013 diff hist +2 m Main Page
- 15:45, 26 February 2013 diff hist 0 N File:Main Page Feb 26, 2013.jpg current
- 15:45, 26 February 2013 diff hist +76 m Main Page new photo
- 14:32, 26 February 2013 diff hist 0 m Main Page
- 12:02, 26 February 2013 diff hist +1,495 m 751.40 LFD Widening and Repair Per Bridge, numerous archaic references replaced with EPG links
- 15:58, 25 February 2013 diff hist 0 m Main Page
- 15:49, 25 February 2013 diff hist +931 m LPA:136.13 LPA Policy Changes expanded info based on 2/21/13 LPA Bulletin
- 11:38, 25 February 2013 diff hist -8 m LPA:136 Local Public Agency (LPA) Policy minor update
- 09:37, 25 February 2013 diff hist +298 m LPA:136.13 LPA Policy Changes EPG 136.11.12
- 09:34, 25 February 2013 diff hist -1 m LPA:136.11 Local Public Agency Construction →136.11.12 Consultantant Administration
- 09:34, 25 February 2013 diff hist -34 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7 Step 6 - Consultant Contract Negotiations
- 09:33, 25 February 2013 diff hist -16 m LPA:136.11 Local Public Agency Construction →136.11.12 Consultant Construction Engineering Services
- 09:29, 25 February 2013 diff hist +226 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7 Step 6 - Consultant Contract Negotiations: Per LPA, link provided to updated EPG 136.11.12.
- 09:25, 25 February 2013 diff hist +1,216 m LPA:136.11 Local Public Agency Construction →136.11.12 Consultant Construction Engineering Services: Per LPA, update giving more guidance on construction administration expectations. Also, 136.11.12 re-titled.
- 14:14, 22 February 2013 diff hist 0 N File:616.23.1 non-motorize 2013.jpg current
- 14:14, 22 February 2013 diff hist +5 m 616.23 Traffic Control for Field Operations →616.23.1 Definitions: new photo
- 13:52, 22 February 2013 diff hist -9 m Main Page
- 13:29, 22 February 2013 diff hist 0 N File:Main Page Feb 22, 2013.jpg current
- 13:29, 22 February 2013 diff hist -68 m Main Page new photo
- 12:25, 22 February 2013 diff hist +32 m Category:128 Conceptual Studies →128.4 Pavement Rehabilitation Projects for Freeways: new photo
- 12:25, 22 February 2013 diff hist 0 N File:128.4.jpg current
- 10:26, 22 February 2013 diff hist +1,643 m Talk:941.37 Welcome To Monuments for Cities : current