User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:45, 16 July 2013 diff hist 0 m 104.7 Scoping Estimates Per Design, updated Cost Estimate Guide
- 13:17, 16 July 2013 diff hist 0 m Main Page
- 14:17, 15 July 2013 diff hist 0 N File:720.1.1.jpg current
- 14:17, 15 July 2013 diff hist +33 Category:720 Mechanically Stabilized Earth Wall Systems
- 14:12, 15 July 2013 diff hist 0 N File:751.22.1.1.jpg current
- 14:12, 15 July 2013 diff hist +36 m 751.22 Prestressed Concrete I Girders →751.22.1 General: new photo
- 14:00, 15 July 2013 diff hist 0 N File:127.13.1.jpg current
- 13:59, 15 July 2013 diff hist +35 m 127.13 Noise new photo
- 13:38, 15 July 2013 diff hist 0 N File:Main Page July 15, 2013.jpg current
- 13:37, 15 July 2013 diff hist -83 m Main Page new photo
- 12:08, 15 July 2013 diff hist -15 m 643.3 Policy, Standards and Regulations →643.3.2 Roadway Classification: updated link
- 13:25, 12 July 2013 diff hist +81 m LPA:136.13 LPA Policy Changes Fig. 136.3.19
- 13:23, 12 July 2013 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.19 updated
- 13:23, 12 July 2013 diff hist 0 N File:Fig.136.3.19 2013.pdf
- 13:22, 12 July 2013 diff hist +10 m LPA:136.3 Federal Aid Basics Per Bridge, the BEAP Consultant List was updated
- 10:43, 12 July 2013 diff hist 0 N File:Main Page July 12, 2013.jpg current
- 10:43, 12 July 2013 diff hist -172 m Main Page EPG 751.1.2.18
- 10:02, 12 July 2013 diff hist 0 N File:751.1.2.18 M40a Guidance.docx
- 10:02, 12 July 2013 diff hist +389 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): Per Bridge, added guidance for filling out the Sounding Request Form M-40a, especially about bridge and roadway classifications.
- 09:21, 12 July 2013 diff hist +8 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.4 Steel Girder or Beam End Bent: Per Bridge, a couple of clarifications
- 09:20, 12 July 2013 diff hist +282 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per Bridge, several clarifications
- 14:35, 11 July 2013 diff hist -15 m Main Page
- 12:35, 11 July 2013 diff hist +366 m Main Page EPG 751.11 and EPG 751.22
- 11:12, 11 July 2013 diff hist +2 m Category:134 Engineering Professional Services
- 11:09, 11 July 2013 diff hist +4 m Category:134 Engineering Professional Services
- 10:52, 11 July 2013 diff hist +89 m Main Page EPG 134.3
- 10:46, 11 July 2013 diff hist 0 N File:134.3.1.doc current
- 10:44, 11 July 2013 diff hist -2,940 m Category:134 Engineering Professional Services Per Design and Audits & Investigations, revisions result from AI ceasing the pre-negotiations reviews & shifting the reviews to project managers and/or contract administrators. Added Fig. 134.3.1.
- 10:20, 11 July 2013 diff hist +1,921 m 751.11 Bearings Per Bridge, clarified usage of plain and laminated bearing pads. Added bearing pad length requirements for P/S NU girders and P/S Spread Box Beams.
- 10:03, 11 July 2013 diff hist +13 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths
- 10:00, 11 July 2013 diff hist 0 N File:751.22.1.4 coping detail.jpg current
- 09:59, 11 July 2013 diff hist 0 N File:751.22.1.4 Non-integral end bents.jpg current
- 09:59, 11 July 2013 diff hist 0 N File:751.22.1.4 Integral end bents.jpg current
- 09:58, 11 July 2013 diff hist +209 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths: Per Bridge, clarified usage of plain and laminated bearing pads. Added bearing pad length requirements for P/S NU girders and P/S Spread Box Beams.
- 09:27, 11 July 2013 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.14
- 09:26, 11 July 2013 diff hist +148 m LPA:136.13 LPA Policy Changes Fig. 136.4.14
- 09:25, 11 July 2013 diff hist 0 N File:Fig. 136.4.14 July 2013.doc current
- 09:24, 11 July 2013 diff hist +3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.14's checklist to be more helpful
- 08:54, 11 July 2013 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.9 MoDOT Review of Consultant Contract
- 08:40, 11 July 2013 diff hist +535 m LPA:136.13 LPA Policy Changes EPG 136.4
- 08:35, 11 July 2013 diff hist +581 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA and Audits and Investigations, revisions result from AI ceasing the pre-negotiations reviews and shifting the reviews to project managers and/or contract administrators
- 07:57, 11 July 2013 diff hist 0 N File:Main Page 2 July 11, 2013.jpg current
- 07:57, 11 July 2013 diff hist 0 N File:Main Page July 11, 2013.jpg current
- 07:56, 11 July 2013 diff hist +66 m Main Page new photos
- 13:45, 10 July 2013 diff hist -16 m 751.6 General Quantities →751.6.2.17 Excavation
- 11:27, 10 July 2013 diff hist -45 m Main Page EPG 751.6.2
- 11:21, 10 July 2013 diff hist +100 m 751.50 Standard Detailing Notes →B3c. Slabs: Per Bridge, updated note to clarify measurement
- 11:18, 10 July 2013 diff hist -170 m 751.6 General Quantities Per Bridge, expanded guidance for Bridge Slabs (formerly "Slab Quantity")
- 09:02, 10 July 2013 diff hist +103 m Main Page EPG 121.3
- 08:37, 10 July 2013 diff hist +18 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP link