User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:05, 1 October 2013 diff hist 0 N File:Fig.136.3.24.docx
- 09:04, 1 October 2013 diff hist +9,819 m LPA:136.3 Federal Aid Basics Per Traffic and Design, EPG 906 has been moved to EPG 136.3. Modified language reflects Design timelines and processes. A main change: TEAP studies will be provided through on-call consultants
- 08:38, 1 October 2013 diff hist +279 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per Bridge, a note was added to clarify camber the diagram
- 14:28, 30 September 2013 diff hist +308 m 616.23 Traffic Control for Field Operations minor note about EPG articles added
- 08:27, 30 September 2013 diff hist +36 m Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2.13 Inspection of Completed Members
- 08:26, 30 September 2013 diff hist 0 N File:1029.2.13.jpg current
- 11:21, 27 September 2013 diff hist +189 m LPA:136.13 LPA Policy Changes EPG 136.7.2.6.1
- 11:18, 27 September 2013 diff hist +488 m LPA:136.7 Design →136.7.2.6.1 Utility Relocations: Per LPA, new guidance for the Utility Status Letter to be prepared by the LPA
- 09:07, 27 September 2013 diff hist -95 m Main Page EPG 907.6
- 08:48, 27 September 2013 diff hist +364 m 907.6 Fatal Crash Reviews Per Traffic, clarification of under what conditions fatal crash reviews are required
- 07:41, 26 September 2013 diff hist -7,220 m 236.3 Administration completed corrections from 9/19/13 including removal of EPG 236.11 Safe and Sound (which is now no longer needed)
- 07:38, 26 September 2013 diff hist 0 m 236.4 Description Writing and Titles updated link
- 07:37, 26 September 2013 diff hist 0 m 236.11 Mediation updated link
- 07:37, 26 September 2013 diff hist 0 m 236.6 Appraisal and Appraisal Review updated link
- 07:35, 26 September 2013 diff hist 0 m 236.7 Negotiation updated link
- 13:38, 25 September 2013 diff hist -1 m Main Page
- 13:36, 25 September 2013 diff hist +16 m Main Page
- 13:35, 25 September 2013 diff hist -10 m Main Page
- 13:35, 25 September 2013 diff hist +10 m Main Page
- 13:26, 25 September 2013 diff hist 0 File:Main Page Sep 25, 2013.jpg uploaded a new version of "Image:Main Page Sep 25, 2013.jpg" current
- 13:14, 25 September 2013 diff hist 0 N File:Main Page 2 Sep 25, 2013.jpg current
- 13:14, 25 September 2013 diff hist 0 N File:Main Page Sep 25, 2013.jpg
- 13:13, 25 September 2013 diff hist -588 m Main Page EPG 748.7
- 12:34, 25 September 2013 diff hist +96 m 748.7 Bridge Reports and Layouts →748.7.3.12 Submission: Per Bridge, new info about submitting Bridge Survey Reports. The added text clarifies what needs to be submitted.
- 12:11, 25 September 2013 diff hist +42 m 748.8 Development in Floodplains →748.9.1 Floodplain Development Permit: updated link
- 12:10, 25 September 2013 diff hist 0 N File:101 Floodplain Development Permit Application.docx
- 12:10, 25 September 2013 diff hist +85 m Category:101 Standard Forms →Bridge: Per Bridge, updated Floodplain Development Permit form. Updated links in EPG 127.9.3.5 and EPG 748.9.1 to the newest version of the form.
- 08:21, 25 September 2013 diff hist -136 m 236.3 Administration Per RW, removed Supplemental Page form
- 08:10, 25 September 2013 diff hist -10 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way →140.1 Right of Way Encroachments, Maintenance Policy RDS(D1): corrected a link
- 07:25, 25 September 2013 diff hist +1 m 902.15 Designing a Traffic Signal →902.15.1.1 Preliminary Layout
- 07:24, 25 September 2013 diff hist 0 N File:902.15.1.2 1S.jpg current
- 07:24, 25 September 2013 diff hist 0 N File:902.15.1.2 11S.jpg current
- 07:23, 25 September 2013 diff hist +561 m 902.15 Designing a Traffic Signal added photos and guidance for the indications
- 13:31, 24 September 2013 diff hist 0 m 127.13 Noise updated links
- 13:29, 24 September 2013 diff hist 0 m 127.13 Noise updated link
- 13:27, 24 September 2013 diff hist 0 m 127.13 Noise →127.13.12 Information for Local Government Officials: updated link
- 12:28, 24 September 2013 diff hist -59 m 127.13 Noise →127.13.10 Noise Wall Public Meeting and Voting: Per Environmental, clarified guidance by removing an inadvertently included sentence from the previous revision
- 10:19, 24 September 2013 diff hist -213 m Main Page EPG 110.3
- 10:13, 24 September 2013 diff hist +553 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per ECR, provided new guidance to clarify how contractors must submit documentation for the wages of apprentices
- 09:50, 24 September 2013 diff hist +149 m LPA:136.13 LPA Policy Changes Fig. 136.4.7
- 09:49, 24 September 2013 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.7
- 09:48, 24 September 2013 diff hist 0 N File:136.4.7 Sept 2013.doc current
- 09:48, 24 September 2013 diff hist +4 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated the formatting of this figure
- 07:34, 24 September 2013 diff hist +1 m Main Page
- 13:51, 23 September 2013 diff hist +141 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 13:49, 23 September 2013 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 13:49, 23 September 2013 diff hist 0 N File:136.9.3 Sept 2013.doc
- 13:49, 23 September 2013 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, this figure was updated to include sample contract forms.
- 13:03, 23 September 2013 diff hist +247 m LPA:136.12 Figures, Glossary and Other Useful Links new figures in EPG 136.10
- 12:59, 23 September 2013 diff hist +219 m LPA:136.13 LPA Policy Changes EPG 136.10