User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:40, 31 January 2014 diff hist 0 N File:Subcontracts 2014.docx
- 11:40, 31 January 2014 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, clarified QRG Subcontracts
- 08:57, 31 January 2014 diff hist +58 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) updated links
- 08:34, 31 January 2014 diff hist -136 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others: Per Traffic, removed "Airport Signs" to align with existing standards
- 08:30, 31 January 2014 diff hist +148 m 903.15 Signing Agreements updated links
- 15:30, 30 January 2014 diff hist -7 m Main Page
- 15:28, 30 January 2014 diff hist 0 N File:Main Page Jan 30c, 2014.jpg current
- 15:28, 30 January 2014 diff hist 0 N File:Main Page Jan 30b, 2014.jpg current
- 15:28, 30 January 2014 diff hist 0 N File:Main Page Jan 30a, 2014.jpg current
- 15:28, 30 January 2014 diff hist -259 m Main Page new photos
- 14:16, 30 January 2014 diff hist 0 N File:Main Page Jan 29a, 2014.jpg current
- 14:15, 30 January 2014 diff hist +1 m Main Page updated photo
- 14:07, 30 January 2014 diff hist 0 N File:806 Land Disturbance Inspection 2014.pdf
- 14:07, 30 January 2014 diff hist -4 m Category:806 Pollution, Erosion and Sediment Control Per Envir'l, minor correction for Land Disturbance Inspection form
- 09:59, 30 January 2014 diff hist 0 N File:Main Page Jan 30, 2014.jpg current
- 09:59, 30 January 2014 diff hist -34 m Main Page EPG 127.13.9
- 09:10, 30 January 2014 diff hist +170 m 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per Bridge, replaced link with updated table that more accurately portrayed the available drawings
- 09:07, 30 January 2014 diff hist +584 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per Bridge, replaced link with tables that more fully portrayed the available drawings.
- 08:53, 30 January 2014 diff hist +452 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details: Per Bridge, replaced links with tables that more fully portrayed the available drawings.
- 08:29, 30 January 2014 diff hist +208 m LPA:136.13 LPA Policy Changes EPG 136.12.2
- 08:22, 30 January 2014 diff hist +10 m 127.13 Noise →127.13.9 Reasonableness: Per Envir'l, minor clarification
- 08:21, 30 January 2014 diff hist +434 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.2 Glossary: Per LPA, added CART definition
- 16:27, 29 January 2014 diff hist +48 m 751.50 Standard Detailing Notes →H6. Pouring and Finishing Concrete Slabs: updated link
- 16:21, 29 January 2014 diff hist 0 N File:Main Page Jan 29, 2014.jpg current
- 16:20, 29 January 2014 diff hist -75 m Main Page EPG 751.50, EPG 751.50
- 16:18, 29 January 2014 diff hist +7 m 751.50 Standard Detailing Notes →C2. Prestressed Girders, Beams & Panels
- 14:49, 29 January 2014 diff hist +1,701 m 751.50 Standard Detailing Notes Per Bridge, revised and added new notes to sections C2 and H2b, improved note guidance and revised note H2c1.40. "To the nearest inch" in C2a.3 was underlined.
- 14:02, 29 January 2014 diff hist +210 m LPA:136.13 LPA Policy Changes EPG 136.12.3.4
- 13:59, 29 January 2014 diff hist +853 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.4 Links to Other Resources: Per Design, updated ADAAG links
- 13:45, 29 January 2014 diff hist 0 N File:751.22.3.6 D1.jpg current
- 13:45, 29 January 2014 diff hist +5 m 751.22 Prestressed Concrete I Girders →751.22.3.6 Girder Reinforcement
- 13:41, 29 January 2014 diff hist 0 N File:751.22.3.6 C1 Type 7.jpg current
- 13:40, 29 January 2014 diff hist 0 N File:751.22.3.6 B1 and B2.jpg current
- 13:40, 29 January 2014 diff hist 0 N File:751.22.3.6 C1.jpg current
- 13:39, 29 January 2014 diff hist +268 m 751.22 Prestressed Concrete I Girders Per Bridge. In EPG 751.22.3.6, adjusted C1 bar Dimension G and overall dimension. In EPG 751.22.3.8, revised the minimum and maximum haunch of Type 6 girders, clarified guidance on girder steps.
- 12:06, 29 January 2014 diff hist -1 m 751.10 General Superstructure →751.10.2.2 Precast Prestressed (P/C P/S) Concrete Panel Forms - Details
- 12:04, 29 January 2014 diff hist 0 N File:751.10.2.2. all bridge.jpg current
- 12:02, 29 January 2014 diff hist 0 N File:751.10.1.12 partial depth.jpg current
- 12:02, 29 January 2014 diff hist 0 N File:751.10.1.12 full depth.jpg current
- 12:01, 29 January 2014 diff hist 0 N File:751.10.1.7.2.jpg current
- 12:00, 29 January 2014 diff hist 0 N File:751.10.1.7 2014.jpg current
- 11:59, 29 January 2014 diff hist +2,117 m 751.10 General Superstructure Per Br; 751.10.1.7.2: added P/C P/S panel deck cantilever reinforcm't details. 751.10.1.12: expanded deck jt guidance. 751.10.2.1: revised jt filler dimen's. 751.10.2.2: deleted duplicated info
- 10:29, 28 January 2014 diff hist +357 m LPA:136.13 LPA Policy Changes EPG 136.7.2.7
- 10:26, 28 January 2014 diff hist +98 m LPA:136.7 Design →136.7.2.7 Design Exceptions: Per LPA, minor clarification
- 10:36, 27 January 2014 diff hist +23 m Main Page
- 10:29, 27 January 2014 diff hist -180 m Main Page EPG 134.4
- 10:04, 27 January 2014 diff hist 0 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution
- 10:00, 27 January 2014 diff hist +247 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per Design, a note was added to remind PM and CAs to get funds obligated prior to issuing a NTP.
- 16:14, 24 January 2014 diff hist 0 N File:Main Page Jan 24, 2014.jpg current
- 16:13, 24 January 2014 diff hist -133 m Main Page EPG 751.1