- 11:07, 20 February 2014 diff hist 0 m Main Page
- 16:06, 19 February 2014 diff hist +97 m Main Page EPG 131.1 and EPG 626.1
- 15:58, 19 February 2014 diff hist 0 N File:131.1.4.1.2.jpg current
- 15:57, 19 February 2014 diff hist 0 N File:131.1.4.1.1.jpg current
- 15:57, 19 February 2014 diff hist +2,578 131.1 Design Exception Process Per Design, generally rewritten to improve the review and approval process and clarify roles and responsibilities by obtaining concurrence during the early stage of the process.
- 15:53, 19 February 2014 diff hist 0 m 748.7 Bridge Reports and Layouts updated a link
- 15:44, 19 February 2014 diff hist +120 Category:626 Rumble Strips →626.1 Edgeline Rumble Strips: Per Design, EPG 626.1 was revised to offer the option for offsetting the rumble strips or their limited use in urban areas.
- 15:10, 19 February 2014 diff hist +103 m Main Page EPG 127.13.9
- 14:56, 19 February 2014 diff hist +174 127.13 Noise →127.13.9 Reasonableness: Per Design, the warrant for the inclusion of sound walls on a project will now use an area (sq. ft.) threshold that remains static regardless of market conditions.
- 15:16, 18 February 2014 diff hist +29 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design
- 14:37, 18 February 2014 diff hist 0 N File:Main Page Feb 18, 2014.jpg current
- 14:37, 18 February 2014 diff hist +948 m Main Page EPG 134
- 13:46, 18 February 2014 diff hist +184 m Category:134 Engineering Professional Services
- 13:43, 18 February 2014 diff hist 0 N File:134.2.4.doc current
- 13:43, 18 February 2014 diff hist 0 N File:134.2.2.doc current
- 13:42, 18 February 2014 diff hist +434 m Category:134 Engineering Professional Services →134.2 Solicitation and Selection Process: Per Design, added two new checklists: Fig 134.2.2 Processing Std. Consultant Contracts Checklist and Fig 134.2.4 Processing On-Call/MOU Consultant Contr.
- 13:16, 18 February 2014 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.8.1
- 13:15, 18 February 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Form 136.8.1
- 13:14, 18 February 2014 diff hist 0 N File:136.8.1 2014.doc current
- 13:13, 18 February 2014 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.1
- 14:13, 14 February 2014 diff hist 0 m Main Page
- 11:05, 13 February 2014 diff hist 0 N File:Main Page Feb 13, 2014.jpg current
- 11:05, 13 February 2014 diff hist -317 m Main Page new photo
- 13:59, 11 February 2014 diff hist -29 m Main Page EPG 751.12
- 13:27, 11 February 2014 diff hist -6 m 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Per Bridge, note updated to reflect welder certification requirements changed last yea
- 12:19, 11 February 2014 diff hist 0 N File:901 2014.jpg current
- 12:18, 11 February 2014 diff hist 0 m Category:901 Lighting new photo
- 16:27, 10 February 2014 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences 751.12 Protective Barricades moved to 751.12 Protective Barriers: Per Bridge, revised title from Protective Barricades
- 16:27, 10 February 2014 diff hist +40 N 751.12 Protective Barricades 751.12 Protective Barricades moved to 751.12 Protective Barriers: Per Bridge, revised title from Protective Barricades current
- 10:22, 10 February 2014 diff hist 0 m Main Page
- 10:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10d, 2014.jpg current
- 10:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10c, 2014.jpg current
- 10:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10b, 2014.jpg current
- 10:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10a, 2014.jpg current
- 10:19, 10 February 2014 diff hist 0 N File:Main Page Feb 10, 2014.jpg current
- 10:19, 10 February 2014 diff hist -336 m Main Page
- 13:07, 7 February 2014 diff hist +64 m 751.40 LFD Widening and Repair
- 13:05, 7 February 2014 diff hist +64 m 751.37 Drilled Shafts
- 13:03, 7 February 2014 diff hist +64 m 751.10 General Superstructure
- 13:00, 7 February 2014 diff hist +63 m 751.13 Expansion Joint Systems
- 11:02, 7 February 2014 diff hist +26 m 751.37 Drilled Shafts
- 10:59, 7 February 2014 diff hist +26 m 751.40 LFD Widening and Repair
- 10:55, 7 February 2014 diff hist +27 m 751.13 Expansion Joint Systems
- 10:51, 7 February 2014 diff hist +12 m 751.10 General Superstructure →751.10.2.2 Precast Prestressed (P/C P/S) Concrete Panel Forms - Details
- 09:32, 7 February 2014 diff hist +81 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: added and updated links, per Bridge
- 09:26, 7 February 2014 diff hist +72 m 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: added link, per Bridge
- 09:23, 7 February 2014 diff hist +72 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details: added link
- 09:19, 7 February 2014 diff hist -27 m 751.50 Standard Detailing Notes minor correction and clarifications, per Bridge
- 09:10, 7 February 2014 diff hist +7 m 751.22 Prestressed Concrete I Girders →751.22.3 Details: Per Bridge, minor corrections
- 09:06, 7 February 2014 diff hist +72 m 751.10 General Superstructure Per Bridge, links added and minor corrections