User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:34, 12 March 2014 diff hist 0 N File:237.9 MHTC Agenda Item Checklist.docx
- 07:33, 12 March 2014 diff hist -72 m 237.9 Submission of Plans and Supporting Documents Per Design, updated MHTC Agenda Item Checklist form
- 15:27, 11 March 2014 diff hist +92 m 236.13 Designing Right of Way Plans updated links
- 15:02, 11 March 2014 diff hist +88 m Main Page
- 15:00, 11 March 2014 diff hist -1,336 m 236.3 Administration →236.3.5.2 Expenditure Accounting: Per RW, clarifications based on newer electronic practices.
- 14:24, 11 March 2014 diff hist 0 N File:Main Page Mar 11, 2014.jpg current
- 14:24, 11 March 2014 diff hist +138 m Main Page new photo
- 09:53, 11 March 2014 diff hist +204 m LPA:136.13 LPA Policy Changes Fig. 136.9.4
- 09:51, 11 March 2014 diff hist -5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.4
- 09:50, 11 March 2014 diff hist 0 N File:136.9.4 2014.doc
- 09:49, 11 March 2014 diff hist -10 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, minor clarification of titles in Fig. 136.9.4. "Resident Engineer" and "Area Engineer" replaced with "Engineer of Record"
- 14:42, 10 March 2014 diff hist 0 N File:123 Stewardship-Oversight Agreement addendum.pdf current
- 14:40, 10 March 2014 diff hist +518 m Category:123 Federal-Aid Highway Program Updated FHWA agreement info with 2011 addendum
- 14:24, 10 March 2014 diff hist -573 m Other Aspects of Pavement Design →Minor Roads: immediately previous revision reversed
- 13:44, 10 March 2014 diff hist +573 Other Aspects of Pavement Design
- 07:11, 10 March 2014 diff hist +236 m LPA:136.13 LPA Policy Changes EPG 136.10.8
- 07:05, 10 March 2014 diff hist +22 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award: Per LPA, minor clarification
- 10:04, 7 March 2014 diff hist +376 m LPA:136.13 LPA Policy Changes EPG 136.4.2.4.3.1
- 10:02, 7 March 2014 diff hist +31 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.3.1 Selecting a Consultant from the LPA On-Call Consultant List: Per LPA, minor clarification
- 09:22, 7 March 2014 diff hist -25 m Main Page
- 09:21, 7 March 2014 diff hist 0 N File:Main Page Mar 7, 2014.jpg current
- 09:21, 7 March 2014 diff hist +341 m Main Page
- 15:14, 6 March 2014 diff hist 0 N File:Main Page Mar 6, 2014.jpg current
- 15:14, 6 March 2014 diff hist +482 m Main Page new photo
- 13:54, 6 March 2014 diff hist -5 m LPA:136.3 Federal Aid Basics Updated links for techincal reasons
- 09:02, 6 March 2014 diff hist +328 m LPA:136.13 LPA Policy Changes EPG 136.3.8.11
- 08:59, 6 March 2014 diff hist +66 m LPA:136.3 Federal Aid Basics →136.3.8.11 Traffic Engineering Assistance Program (TEAP): Per LPA, inserted link for LPA )n-Call Consultant List
- 08:16, 6 March 2014 diff hist 0 N File:236.3 Form A419 2014.docx
- 08:16, 6 March 2014 diff hist +10 m 236.3 Administration Per RW, updated Form A-419
- 15:45, 5 March 2014 diff hist -163 m Main Page EPG 236.3.5.2
- 15:18, 5 March 2014 diff hist -141 m 236.3 Administration Per RW, the Payroll Cover Letter is no longer needed.
- 09:27, 5 March 2014 diff hist +3 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated WZ Coordination Contacts link
- 09:18, 5 March 2014 diff hist +625 m LPA:136.13 LPA Policy Changes EPG 136.3.8.7 TAP
- 09:02, 5 March 2014 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management updated link
- 09:00, 5 March 2014 diff hist +2 m Category:754 Bridge Engineering Assistance Program (BEAP) updated link
- 09:00, 5 March 2014 diff hist 0 m Category:906 Traffic Engineering Assistance Program (TEAP) updated link current
- 08:59, 5 March 2014 diff hist +3,619 m LPA:136.3 Federal Aid Basics Per LPA, eligible project sponsor info was deleted & replaced with a link to EPG 136.1.2.2 to ensure consistency in definition of eligible sponsors. Also, EPG 136.3.18 moved to 136.3.8.7.
- 14:22, 4 March 2014 diff hist +277 m Main Page EPG 1080, EPG 751.50
- 11:24, 4 March 2014 diff hist -264 m 751.50 Standard Detailing Notes Per Bridge; in A1 adjusted piles' design unit stresses; in G5 clarified that closure plates are required & are included in pile price; in G6 added pile grade to items to be included in remarks column
- 09:55, 4 March 2014 diff hist -1,431 m 901.17 Material Inspection for Sec 901 →Procedure: Per CM, high strength bolt, nut and washer sampling info moved to EPG 1080
- 09:54, 4 March 2014 diff hist -1,614 m 903.22 Material Inspection for Sec 903 →903.23.2 Procedure: Per CM, high strength bolt, nut and washer sampling info moved to EPG 1080
- 09:52, 4 March 2014 diff hist -2,024 m 902.20 Material Inspection for Sec 902 →Procedure: Per CM, high strength bolt, nut and washer sampling info moved to EPG 1080
- 09:48, 4 March 2014 diff hist -3,198 m Category:712 Structural Steel Construction Per CM, high strength bolt, nut and washer sampling info moved to EPG 1080
- 09:23, 4 March 2014 diff hist +7,051 m Category:1080 Structural Steel Fabrication Per CM, consolidated requirements for nuts, bolts, and washers. Sample sizes have been changed to 6 pieces (nuts, bolts or washers). AASHTO M298 has been discontinued and was replaced with ASTM B695.
- 12:27, 3 March 2014 diff hist +35 m Category:206 Excavation for Structures →206.2 Class 3 Excavation: Per CM, diagram reintroduced into article.
- 09:28, 3 March 2014 diff hist 0 N File:Main Page Mar 3, 2014.jpg current
- 09:27, 3 March 2014 diff hist -470 m Main Page new photo
- 16:11, 28 February 2014 diff hist 0 m Main Page
- 11:48, 28 February 2014 diff hist +39 m Category:700 STRUCTURES AND HYDRAULICS added photo
- 11:46, 28 February 2014 diff hist 0 N File:700 st louis.jpg current