User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:03, 10 June 2014 diff hist +209 m 748.5 Matching Existing Structures Per Bridge, added env'l requirements for culverts. Clarified that hydraulic performance isn’t actually matched in most cases, but is used as the design criteria for the new structure. current
- 07:53, 10 June 2014 diff hist -1 m 748.4 Headwater and Backwater →748.4.2 Backwater from Obstruction to Flow
- 07:52, 10 June 2014 diff hist 0 N File:748.4.2.jpg current
- 07:52, 10 June 2014 diff hist 0 N File:748.4.1.jpg current
- 07:49, 10 June 2014 diff hist +1,446 m 748.4 Headwater and Backwater Per Bridge, max. headwater depth is now to be based on a ration of the headwaters to the dia. of the culvert
- 07:30, 10 June 2014 diff hist 0 m 750.3 Bridges updated link
- 07:25, 10 June 2014 diff hist -26 m Main Page QRG Digital Signature for Adobe Pro 10 (Contractors)
- 07:15, 10 June 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) 2014.docx
- 07:14, 10 June 2014 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Digital Signature for Adobe Pro 10 (Contractors)
- 15:13, 9 June 2014 diff hist 0 N File:748.3.5.4 Vertical.jpg current
- 15:12, 9 June 2014 diff hist 0 N File:748.3.5.4 Continuous.jpg current
- 15:12, 9 June 2014 diff hist +2,346 m 748.3 Freeboard Per Bridge, re-titled and reorganized article for clarity. Provided definitions and guidance to determine limits of freeboard for bridges on steep grades or vertical curve.
- 14:49, 9 June 2014 diff hist 0 m 748.3 Freeboard 748.3 Bridge Freeboard moved to 748.3 Freeboard: Bridge freeboard is only one type of freeboard. Re-titled to reflect this fact.
- 14:49, 9 June 2014 diff hist +29 N 748.3 Bridge Freeboard 748.3 Bridge Freeboard moved to 748.3 Freeboard: Bridge freeboard is only one type of freeboard. Re-titled to reflect this fact. current
- 14:44, 9 June 2014 diff hist +429 m 748.2 Roadway Design Criteria Per Bridge, reorganized and re-titled article for greater clarity. Terminology clarified.
- 14:35, 9 June 2014 diff hist 0 m 748.2 Roadway Design Criteria 748.2 Roadway Overtopping moved to 748.2 Roadway Design Criteria: Confusion of "Roadway Overtopping" and "Overtopping Flood" was addressed
- 14:35, 9 June 2014 diff hist +43 N 748.2 Roadway Overtopping 748.2 Roadway Overtopping moved to 748.2 Roadway Design Criteria: Confusion of "Roadway Overtopping" and "Overtopping Flood" was addressed current
- 14:30, 9 June 2014 diff hist -2 m Category:748 Hydraulics and Drainage current
- 14:29, 9 June 2014 diff hist -14 m Category:748 Hydraulics and Drainage Per Bridge, minor clarification
- 12:07, 9 June 2014 diff hist +34 m Category:501 Concrete →501.1 Construction Inspection for Sec 501: new photo
- 12:06, 9 June 2014 diff hist 0 N File:501.1.1.jpg current
- 11:20, 9 June 2014 diff hist +70 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per Bridge, clarifications
- 11:12, 9 June 2014 diff hist -1 m 751.10 General Superstructure →751.10.2.2 Precast Prestressed (P/C P/S) Concrete Panel Forms - Details: Per Bridge, minor clarification
- 10:33, 9 June 2014 diff hist -137 m Main Page EPG 131.2
- 10:21, 9 June 2014 diff hist +309 m 131.2 Proprietary Items and Public Interest Findings Per EPG, guidance revised to better reflect the requirements of CFR 635.411
- 09:25, 9 June 2014 diff hist +124 m Main Page EPG 110.1
- 09:10, 9 June 2014 diff hist +742 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per ECR, additional guidance for acceptable location of the full wage order. Also, description of a spreadsheet of wages inlieu of the full wage order.
- 07:15, 9 June 2014 diff hist +4 m 236.5 Property Management →236.5.25.3 Valuation – Compensation for Leases: Per RW, now authorization is to be provided by RW Director instead of district engineer
- 12:21, 6 June 2014 diff hist 0 N File:Main Page June 7, 2014.jpg current
- 12:21, 6 June 2014 diff hist -434 m Main Page EPG 751.1.3.6
- 11:08, 6 June 2014 diff hist +162 m Category:409 Seal Coat →409.1 Design: Per Bridge, revision to match guidance with current bridge asphalt overlay seal coat policy.
- 11:05, 6 June 2014 diff hist 0 m 770.7 Maintenance of Bridge Superstructure →770.7.4 Bituminous Mat Resurfacing: Per Bridge, revision to match guidance with current bridge asphalt overlay seal coat policy.
- 11:04, 6 June 2014 diff hist +317 m 751.1 Preliminary Design →751.1.3.5 Structural Rehabilitation Checklist: Per Bridge, revision to match guidance with current bridge asphalt overlay seal coat policy.
- 11:02, 6 June 2014 diff hist -4 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, revisions to match guidance with current bridge asphalt overlay seal coat policy.
- 10:51, 6 June 2014 diff hist +11 m Category:712 Structural Steel Construction →712.2.5.2 Surface Preparation: Per CM, updated link to Qualified Protective Coatings for Machine Finished Surfaces
- 09:23, 6 June 2014 diff hist 0 m Category:712 Structural Steel Construction →712.2.5.2 Surface Preparation: Per CM, updated spec links
- 09:09, 6 June 2014 diff hist -7 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: Per CM, updated link to Form C-220
- 15:22, 5 June 2014 diff hist 0 N File:Main Page 2 June 6, 2014.jpg current
- 15:22, 5 June 2014 diff hist 0 N File:Main Page June 6, 2014.jpg current
- 15:21, 5 June 2014 diff hist -194 m Main Page EPG 106.4, EPG 501.1.5
- 15:04, 5 June 2014 diff hist -123 m Category:501 Concrete →501.1.5 Measurement of Material (Sec 501.6): Per CM, guidance clarified to explain QC/QA roles for concrete plant inspections. This is part of the broader QM initiative implemented in past 2 yrs.
- 14:56, 5 June 2014 diff hist -59 m 106.4 Plant Inspections Per CM, guidance revised to explain QC/QA roles for concrete plant inspections. This is a clarification of the broader QM initiative that we’ve been implementing over the past 2 yrs.
- 14:46, 5 June 2014 diff hist 0 N File:941 SSD.pdf current
- 14:46, 5 June 2014 diff hist -128 m Category:941 Permits and Access Requests Per Traffic, replaced SSD chart with Green Book's Exhibit 3-1
- 12:04, 5 June 2014 diff hist -54 m Category:107 Legal Relations and Responsibility to the Public updated link
- 09:56, 5 June 2014 diff hist -9 m Category:470 Bituminous Asphalt Maintenance →470.7.1 Patching Methods: Per EPG, "dangerous" removed to avoid legal exposures
- 09:54, 5 June 2014 diff hist -28 m Category:409 Seal Coat Per EPG, "and dangerous" removed
- 11:12, 4 June 2014 diff hist -1 m Main Page
- 11:11, 4 June 2014 diff hist -20 m Main Page
- 09:24, 4 June 2014 diff hist 0 N File:Main Page June 4, 2014.jpg current