User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:56, 10 July 2015 diff hist -2 m Main Page
- 09:17, 9 July 2015 diff hist +109 m Main Page EPG 751.10, EPG 751.14
- 09:14, 9 July 2015 diff hist +80 m 751.10 General Superstructure →751.10.2.1 Precast Prestressed (P/C P/S) Concrete Panel Forms - Design: added link
- 09:10, 9 July 2015 diff hist +3,872 m 751.14 Steel Superstructure →751.14.4 Composite Design: Per BR, added guidance and details about making steel girders and beams composite.
- 08:38, 9 July 2015 diff hist +138 m 751.10 General Superstructure →751.10.2 Stay-in-Place Bridge Deck Forms: Per BR, added guidance to accommodate making steel girders and beams composite.
- 07:51, 9 July 2015 diff hist +74 m Main Page EPG 806
- 07:48, 9 July 2015 diff hist +691 m Category:806 Pollution, Erosion and Sediment Control →Temporary Stream Crossing ( Sec. 806.100): Per Environmental, updated guidance to bring it into compliance with Sec 303.2
- 14:40, 8 July 2015 diff hist +51 m 751.13 Expansion Joint Systems →751.13.4.3 Joint System Details (Steel Structures): Per BR, note text added for asterisk in the diagram
- 13:36, 8 July 2015 diff hist -156 m Main Page EPG 620
- 13:28, 8 July 2015 diff hist -10 m 620.1 General (MUTCD Chapter 3A) →620.1.7 Permanent Pavement Markings
- 13:27, 8 July 2015 diff hist 0 N File:620.1.7.jpg current
- 13:27, 8 July 2015 diff hist +35 m 620.1 General (MUTCD Chapter 3A) →620.1.7 Permanent Pavement Markings: Per TS, helpful photos added to text
- 13:24, 8 July 2015 diff hist 0 N File:620 decision.jpg current
- 13:24, 8 July 2015 diff hist +42 m Category:620 Pavement Marking →Pavement Marking Guidelines: Per TS, added decision tree figure
- 13:07, 8 July 2015 diff hist +178 m Category:620 Pavement Marking →Pavement Marking Guidelines: Per TS, clarification of paint types available to contractors
- 09:28, 8 July 2015 diff hist +22 m 751.37 Drilled Shafts →Table 751.37.1.1 Summary of drilled shaft dimensions with minimum and maximum values: Per BR, note #1 clarified
- 09:18, 8 July 2015 diff hist 0 m 751.40 LFD Widening and Repair 751.40 Widening and Repair (Non-LRFD) moved to 751.40 Widening and Repair (Non-LFD): Per BR, updated article's title - from "Non- LRFD" to "Non-LFD". No other changes needed.
- 09:18, 8 July 2015 diff hist +50 N 751.40 Widening and Repair (Non-LRFD) 751.40 Widening and Repair (Non-LRFD) moved to 751.40 Widening and Repair (Non-LFD): Per BR, updated article's title - from "Non- LRFD" to "Non-LFD". No other changes needed.
- 14:55, 7 July 2015 diff hist 0 N File:Main Page July 7, 2015.jpg current
- 14:54, 7 July 2015 diff hist -19 m Main Page
- 10:41, 7 July 2015 diff hist -608 m Main Page EPG 109.12
- 10:28, 7 July 2015 diff hist 0 N File:109.12 Truth Table July 2015.docx current
- 10:26, 7 July 2015 diff hist +251 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, under our agreement with FHWA, Level 2 change orders will be sent to FHWA for review.
- 10:07, 7 July 2015 diff hist +158 m Category:450 Bituminous Pavement Design
- 10:04, 7 July 2015 diff hist 0 N File:450 Options.pdf current
- 10:03, 7 July 2015 diff hist +105 m Category:450 Bituminous Pavement Design Per CM, added figure for min. placement depths and %AC by volume for asphalt treatment options
- 09:02, 7 July 2015 diff hist +151 m Main Page updated links
- 08:36, 7 July 2015 diff hist +114 m Category:401 Bituminous Base and Pavement →401.2.4 Gradation Control (Sec 401.5): Per CM, correction to match spec that the AC be be within 0.3% of the job-mix formula
- 08:01, 7 July 2015 diff hist +27 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.43.1 Temporary Stop Signs at Signalized Intersections: corrected incorrect reference
- 07:54, 7 July 2015 diff hist -4 m Category:104 Scope updated link
- 07:48, 7 July 2015 diff hist -4 m 104.7 Scoping Estimates updated link
- 07:46, 7 July 2015 diff hist -4 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated link
- 07:41, 7 July 2015 diff hist -8 m 121.3 The Statewide Transportation Improvement Program (STIP) updated link
- 12:55, 6 July 2015 diff hist 0 m Main Page
- 13:25, 2 July 2015 diff hist 0 m Main Page
- 15:19, 1 July 2015 diff hist -170 m Main Page EPG 403.1.19 and EPG 502.2
- 15:13, 1 July 2015 diff hist 0 m Category:502 Portland Cement Concrete Base and Pavement →502.2 Material Inspection
- 15:12, 1 July 2015 diff hist 0 m Category:403 Asphaltic Concrete Pavement
- 15:11, 1 July 2015 diff hist +277 m Category:502 Portland Cement Concrete Base and Pavement →502.2 Material Inspection: Per CM, tamper proof bags will be used for these situations and will bring guidance into compliance with the specs and FHWA direction.
- 15:05, 1 July 2015 diff hist +355 m Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19): Per CM, tamper proof bags will be used for these situations and will bring guidance into compliance with the specs and FHWA direction.
- 12:58, 1 July 2015 diff hist 0 N File:Main Page July 1, 2015.jpg current
- 12:57, 1 July 2015 diff hist -55 m Main Page
- 12:39, 1 July 2015 diff hist -301 m 751.50 Standard Detailing Notes →I1. General: Per BR, I1.10a was removed since it is no longer used on plans
- 12:14, 30 June 2015 diff hist -106 m Main Page EPG 143.2, EPG 106.3.2.86
- 10:54, 30 June 2015 diff hist +13 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion →106.3.2.86.3 Procedure
- 10:54, 30 June 2015 diff hist 0 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion
- 10:53, 30 June 2015 diff hist 0 N File:106.3.2.86 casting knife profile.jpg current
- 10:53, 30 June 2015 diff hist 0 N File:106.3.2.86 casting knife.jpg current
- 10:52, 30 June 2015 diff hist +190 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion
- 10:30, 30 June 2015 diff hist +4,303 Nm 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion Per CM, new MoDOT Test Method