User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:10, 9 February 2016 diff hist -8 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.20 Pavement Word, Symbol and Arrow Markings (MUTCD Section 3B.20): updated link
- 11:09, 9 February 2016 diff hist -9 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.20 Pavement Word, Symbol and Arrow Markings (MUTCD Section 3B.20): updated link
- 11:06, 9 February 2016 diff hist -5 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.11 Raised Pavement Markers (MUTCD Section 3B.11): updated link
- 11:04, 9 February 2016 diff hist -8 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.18 Crosswalk Markings (MUTCD Section 3B.18): updated link
- 09:52, 9 February 2016 diff hist -39 m 236.3 Administration →236.3.7.5 Distribution of Clearance Certification: Per RW, update reflects current requirements, clarifies any confusion
- 13:14, 8 February 2016 diff hist -7 m Category:1045 Paint for Structural Steel →1045.1 Apparatus: Per CM, updated link
- 12:03, 8 February 2016 diff hist +110 m Category:1045 Paint for Structural Steel →1045.1 Apparatus: Per Chem Lab and Phys Lab, added link to the "Approved and Pre-Qualified List" table
- 11:47, 8 February 2016 diff hist -194 m Main Page EPG 236.3
- 11:07, 8 February 2016 diff hist +1,250 m 236.3 Administration Per RW and FHWA, provided A-Date and clearance process for right of way on design-build projects.
- 08:36, 8 February 2016 diff hist 0 N File:Moving Files from SharePoint to CIA 2016.docx
- 08:36, 8 February 2016 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Moving Contract Files from SharePoint to CIA
- 10:43, 3 February 2016 diff hist +151 m Main Page EPG 751.50
- 10:34, 3 February 2016 diff hist +59 m 751.50 Standard Detailing Notes →G1. Concrete Bents: Per BR, clarified #5-H (L shaped) approach slab anchorage bars, end of slab, and fill face of end bent. Revised lap splice for U and V bars in end bents.
- 10:03, 3 February 2016 diff hist 0 N File:Main Page Feb 3, 2016.jpg current
- 10:03, 3 February 2016 diff hist +261 m Main Page
- 09:29, 3 February 2016 diff hist +246 m 751.35 Concrete Pile Cap Integral End Bents adjusted figures
- 09:07, 3 February 2016 diff hist 0 N File:751.35.4.4 plan.jpg current
- 09:06, 3 February 2016 diff hist 0 N File:751.35.4. sections.jpg current
- 09:06, 3 February 2016 diff hist 0 N File:751.35.4.3 skewed.jpg current
- 09:05, 3 February 2016 diff hist 0 N File:751.35.4.3 sections.jpg current
- 09:05, 3 February 2016 diff hist 0 N File:751.35.4.3.jpg current
- 09:05, 3 February 2016 diff hist 0 N File:751.35.4.2 section d-d.jpg current
- 09:04, 3 February 2016 diff hist 0 N File:751.35.4.2 sections.jpg current
- 09:04, 3 February 2016 diff hist 0 N File:751.35.4.2 2016.jpg current
- 09:04, 3 February 2016 diff hist 0 N File:751.35.4.1 section d-d.jpg current
- 09:03, 3 February 2016 diff hist 0 N File:751.35.4.1 sections.jpg current
- 09:03, 3 February 2016 diff hist 0 N File:751.35.4.1 2016.jpg current
- 09:02, 3 February 2016 diff hist 0 N File:751.35.3.5 section d-d.jpg current
- 09:02, 3 February 2016 diff hist 0 N File:751.35.3.5 section a-a.jpg current
- 09:02, 3 February 2016 diff hist 0 N File:751.35.3.5 detached wing.jpg current
- 09:01, 3 February 2016 diff hist 0 N File:751.35.3.5.jpg current
- 09:01, 3 February 2016 diff hist 0 N File:751.35.3.4 plan skewed.jpg current
- 09:01, 3 February 2016 diff hist 0 N File:751.35.3.4 plan squared.jpg current
- 09:00, 3 February 2016 diff hist 0 N File:751.35.3.4 elevation.jpg current
- 09:00, 3 February 2016 diff hist 0 N File:751.35.3.4 keyed.jpg current
- 08:59, 3 February 2016 diff hist 0 N File:751.35.3.4.jpg current
- 08:53, 3 February 2016 diff hist 0 N File:751.35.3.3 plan skewed.jpg current
- 08:53, 3 February 2016 diff hist 0 N File:751.35.3.3 plan squared.jpg current
- 08:53, 3 February 2016 diff hist 0 N File:751.35.3.3 elevation.jpg current
- 08:52, 3 February 2016 diff hist 0 N File:751.35.3.3 keyed.jpg current
- 08:51, 3 February 2016 diff hist 0 N File:751.35.3.3.jpg current
- 08:51, 3 February 2016 diff hist -455 m 751.35 Concrete Pile Cap Integral End Bents Per BR, clarified #5-H (L shaped) approach slab anchorage bars, end of slab, and fill face of end bent. Revised lap splice for U and V bars in end bents.
- 12:29, 2 February 2016 diff hist 0 N File:751.34.3.2 sections near left wing.jpg current
- 12:28, 2 February 2016 diff hist 0 N File:751.34.3.2 part section A-A.jpg current
- 12:28, 2 February 2016 diff hist -45 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per BR, clarified #5-H (L shaped) approach slab anchorage bars, end of slab & fill face of end bent. Revised U & V lap splice
- 09:42, 2 February 2016 diff hist +102 m Category:941 Permits and Access Requests updated links
- 09:40, 2 February 2016 diff hist +47 m 626.3 Construction Inspection Guidelines for Sec 626 updated link
- 09:38, 2 February 2016 diff hist +6 m Category:626 Rumble Strips updated links
- 09:34, 2 February 2016 diff hist +3 m 643.3 Policy, Standards and Regulations →643.3.4.1 Major Routes (Interstate System or Other Freeways): updated link
- 09:32, 2 February 2016 diff hist +3 m Category:Safe and Sound →Pavements and Depth Transitions: updated link