User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:26, 1 June 2016 diff hist +113 903.9 General Information Signs →903.9.13 Welcome To Signs for Cities: Per TR, updated guidance
- 10:18, 1 June 2016 diff hist +194 m Main Page EPG 751.5.9, EPG 751.12, EPG 751.37
- 10:17, 1 June 2016 diff hist -3 m 751.37 Drilled Shafts →751.37.6.4 Transverse Reinforcement
- 10:16, 1 June 2016 diff hist +44 m 751.37 Drilled Shafts →751.37.6.4 Transverse Reinforcement: inserted link
- 10:02, 1 June 2016 diff hist +36 751.50 Standard Detailing Notes →K1. General: Per BR, updated Note K1.5
- 10:00, 1 June 2016 diff hist +1,305 751.37 Drilled Shafts →751.37.6.4 Transverse Reinforcement: Per BR, added '''No. 4. Determine Maximum Transverse Shaft Reinforcement Spacing at the Anchorage of Column Reinforcement
- 09:50, 1 June 2016 diff hist +527 m 751.31 Open Concrete Intermediate Bents Per BR, minor clarifications
- 09:27, 1 June 2016 diff hist +796 m 751.24 Retaining Walls Per BR, minor clarification
- 09:16, 1 June 2016 diff hist +14 m 751.22 Prestressed Concrete I Girders →751.22.3.6 Girder Reinforcement
- 09:14, 1 June 2016 diff hist 0 N File:751.22.3.6 section reinforcement.jpg current
- 09:07, 1 June 2016 diff hist +214 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: Per BR, see EPG 751.12.2
- 09:03, 1 June 2016 diff hist 0 File:751.12.2.10 3.jpg uploaded a new version of "Image:751.12.2.10 3.jpg" current
- 09:03, 1 June 2016 diff hist 0 File:751.12.2.10 2.jpg uploaded a new version of "Image:751.12.2.10 2.jpg" current
- 09:02, 1 June 2016 diff hist 0 File:751.12.2.10 1.jpg uploaded a new version of "Image:751.12.2.10 1.jpg" current
- 08:58, 1 June 2016 diff hist 0 N File:751.12.2.10 3.jpg
- 08:58, 1 June 2016 diff hist 0 N File:751.12.2.10 2.jpg
- 08:58, 1 June 2016 diff hist 0 N File:751.12.2.10 1.jpg
- 08:58, 1 June 2016 diff hist 0 N File:751.12.2.9 section.jpg current
- 08:57, 1 June 2016 diff hist 0 N File:751.12.2.9 part.jpg current
- 08:57, 1 June 2016 diff hist 0 N File:751.12.2.7.jpg
- 08:56, 1 June 2016 diff hist 0 N File:751.12.2.6.jpg current
- 08:56, 1 June 2016 diff hist -1 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.5 SBC for Wing with Detached Wing Wall
- 08:56, 1 June 2016 diff hist 0 N File:751.12.2.5 Integral.jpg current
- 08:55, 1 June 2016 diff hist 0 N File:751.12.2.5 Non-integral.jpg current
- 08:55, 1 June 2016 diff hist 0 File:751.12.2.3 continuous 2.jpg uploaded a new version of "Image:751.12.2.3 continuous 2.jpg"
- 08:54, 1 June 2016 diff hist 0 N File:751.12.2.3 continuous 2.jpg
- 08:54, 1 June 2016 diff hist 0 N File:751.12.2.3 continuous 1.jpg
- 08:54, 1 June 2016 diff hist +134 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: added continuous concrete slab figures, inadvertently omitted
- 08:50, 1 June 2016 diff hist 0 N File:751.12.2.3 Non-integral 2.jpg
- 08:50, 1 June 2016 diff hist 0 N File:751.12.2.3 Non-integral 1.jpg
- 08:49, 1 June 2016 diff hist 0 N File:751.12.2.3 Integral 2.jpg
- 08:49, 1 June 2016 diff hist 0 N File:751.12.2.3 Integral 1.jpg
- 08:49, 1 June 2016 diff hist 0 N File:751.12.2.2 2 1-4 wearing.jpg current
- 08:48, 1 June 2016 diff hist 0 N File:751.12.2.2 1 3-4 wearing.jpg current
- 08:48, 1 June 2016 diff hist 0 N File:751.12.2.2 no wearing.jpg current
- 08:48, 1 June 2016 diff hist 0 N File:751.12.2.1.jpg current
- 08:47, 1 June 2016 diff hist -13,873 751.12 Barriers, Railings, Curbs and Fences →751.12.2 Safety Barrier Bridge Curbs (NJ Shape): Per BR, addresses code changes for development and splicing of reinforcement with the 2015 Interim revisions of the AASHTO LRFD Bridge Design Spec
- 08:11, 1 June 2016 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences Per BR, minor correction
- 07:38, 1 June 2016 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.9.2.7.4 Development of Standard Hooked Deformed Bars in Tension
- 07:36, 1 June 2016 diff hist 0 N File:751.5.9.2.7.4 steps 6 and 7.jpg current
- 07:36, 1 June 2016 diff hist 0 N File:751.5.9.2.7.4 steps 1 through 5.jpg current
- 07:35, 1 June 2016 diff hist 0 N File:751.5.9.2.7.3.jpg current
- 07:34, 1 June 2016 diff hist 0 N File:751.5.9.2.7.2 step 7.jpg current
- 07:33, 1 June 2016 diff hist 0 N File:751.5.9.2.7.2 step 6.jpg current
- 07:32, 1 June 2016 diff hist 0 N File:751.5.9.2.7.2 step 1 through 5.jpg current
- 07:31, 1 June 2016 diff hist -1,979 751.5 Structural Detailing Guidelines →751.5.9.2.7 Development and Lap Splices: Per BR, addresses code changes for development and splicing of reinforcement with the 2015 Interim revisions of the AASHTO LRFD Bridge Design Specs
- 15:17, 31 May 2016 diff hist -101 m Main Page EPG 108.16.1
- 15:15, 31 May 2016 diff hist -540 m Category:108 Prosecution and Progress →108.16.1 Critical Dates: Per CM, deleted "Open to Traffic Date", which is now considered confusing and unnecessary.
- 15:09, 31 May 2016 diff hist -150 Main Page EPG 127.2
- 15:05, 31 May 2016 diff hist 0 N File:127.2 staff 2015.pdf