User contributions
Jump to navigation
Jump to search
- 13:05, 19 May 2017 diff hist +10 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.2.2 Loads
- 13:03, 19 May 2017 diff hist 0 N File:751.34.2.2 detached wing.jpg current
- 13:02, 19 May 2017 diff hist 0 N File:751.34.2.2 elevation.jpg current
- 13:02, 19 May 2017 diff hist +55 m 751.34 Concrete Pile Cap Non-Integral End Bents Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:42, 19 May 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.3 part elev 2017.jpg current
- 12:34, 19 May 2017 diff hist 0 N File:751.32.3.2 2017.jpg current
- 12:33, 19 May 2017 diff hist +10 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 15:04, 17 May 2017 diff hist +8 m Main Page
- 15:03, 17 May 2017 diff hist 0 N File:Main Page May 17, 2017.jpg current
- 15:03, 17 May 2017 diff hist -350 m Main Page
- 10:49, 17 May 2017 diff hist +77 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent: Per BR, further clarified girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17
- 10:43, 17 May 2017 diff hist 0 N File:751.22.3.10 part plan skewed 2017.jpg current
- 10:43, 17 May 2017 diff hist +255 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17 revision
- 10:04, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 17 2017.jpg current
- 10:02, 17 May 2017 diff hist +3 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:00, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 2017.jpg current
- 10:00, 17 May 2017 diff hist +4 m 751.11 Bearings →751.11.3 Details: Per BR, further clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders w/ info inadvertently left out by division
- 13:37, 16 May 2017 diff hist 0 N File:134.2.2.2 May 16 2017.docx current
- 13:36, 16 May 2017 diff hist +12 m Category:134 Engineering Professional Services further, minor update of Form 134.2.2.2
- 13:35, 16 May 2017 diff hist +3 m Category:101 Standard Forms minor update of Form 134.2.2.2
- 13:26, 16 May 2017 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.3.6.2 Shear Reinforcement: Per BR, added a common, available wire size that was inadvertently excluded in the original Nov 22, '17 revision.
- 12:12, 16 May 2017 diff hist +3 m 238.3 Route Surveying updated GPS reference station network link
- 12:09, 16 May 2017 diff hist 0 m Category:134 Engineering Professional Services updated GPS Reference Station network link
- 15:22, 12 May 2017 diff hist -2 m Main Page
- 15:01, 12 May 2017 diff hist -7 m Category:101 Standard Forms Per LPA, updated two forms: Submittal to Professioanl Services Committee and the Consultant Rating Form
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.5.1 May 2017.doc current
- 14:59, 12 May 2017 diff hist 0 N File:134.2.2.2 May 2017.docx current
- 14:59, 12 May 2017 diff hist -28 m Category:134 Engineering Professional Services Per LPA, updated two forms, Figs. 134.2.2.2 and 134.2.2.5.1, with minor updates
- 12:56, 12 May 2017 diff hist -137 m Main Page EPG 236.7.2.3
- 12:37, 12 May 2017 diff hist 0 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, increased the minimum offer of prompt offer of just compensation from $300 to $500
- 08:53, 12 May 2017 diff hist -1 m Main Page
- 08:19, 12 May 2017 diff hist 0 N File:616.13.7.1 2017.xlsx current
- 08:19, 12 May 2017 diff hist +10 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Pacing Worksheet
- 09:46, 11 May 2017 diff hist -14 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): updated jsp link
- 08:47, 10 May 2017 diff hist -13 m Main Page EPG 402 and EPG 409
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC MoDOT 2017.pdf current
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC Contractor 2017.pdf current
- 08:29, 10 May 2017 diff hist +10 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the MoDOT/Contractor files were further updated
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat MoDOT.pdf current
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat Contractor.pdf
- 07:32, 10 May 2017 diff hist 0 File:409 FY2018 Contract Seal Coat Guidelines.docx uploaded a new version of "Image:409 FY2018 Contract Seal Coat Guidelines.docx" current
- 07:30, 10 May 2017 diff hist 0 N File:409 FY2018 Contract Seal Coat Guidelines.docx
- 07:30, 10 May 2017 diff hist -1,223 m Category:409 Seal Coat Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC MoDOT.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC Contractor.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 FY2018 Contract Leveling Coat Guidelines.docx current
- 07:19, 10 May 2017 diff hist -1,085 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 14:49, 5 May 2017 diff hist 0 m Main Page
- 14:33, 4 May 2017 diff hist +265 m 171.5 Drainage Added link to Culvert Pipe Replacement video