- 17:29, 9 February 2018 diff hist +1 751.1 Preliminary Design →751.1.4.3 MSE Walls: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:26, 9 February 2018 diff hist -1 751.1 Preliminary Design →751.1.2.18 Preliminary Cost Estimate: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:09, 9 February 2018 diff hist 0 1047.9 Laboratory Testing Guidelines for Sec 1047
- 17:09, 9 February 2018 diff hist 0 m 1047.9 Laboratory Testing Guidelines for Sec 1047 1047.6 Laboratory Testing Guidelines for Sec 1047 moved to 1047.9 Laboratory Testing Guidelines for Sec 1047
- 17:09, 9 February 2018 diff hist +63 N 1047.6 Laboratory Testing Guidelines for Sec 1047 1047.6 Laboratory Testing Guidelines for Sec 1047 moved to 1047.9 Laboratory Testing Guidelines for Sec 1047 current
- 17:08, 9 February 2018 diff hist 0 m 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide
- 17:07, 9 February 2018 diff hist 0 m 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide moved to 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide
- 17:07, 9 February 2018 diff hist +67 N 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide moved to 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide current
- 17:04, 9 February 2018 diff hist +2 m Category:1047 Corrugated Polyethylene Culvert Pipe
- 17:03, 9 February 2018 diff hist -7,149 Category:1047 Corrugated Polyethylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 corrugated.jpg current
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 steel.jpg current
- 16:57, 9 February 2018 diff hist +7,754 N 1041.8 Polypropylene Pipe (PP) Pipe Inspection Guide New page: This guide will assist in the inspection of all types and configurations of polypropylene (PP) pipe, couplings and fittings. Answer each question and take the action indicated for the answ... current
- 16:54, 9 February 2018 diff hist +2 m Category:1041 Polypropylene Culvert Pipe
- 16:54, 9 February 2018 diff hist +70 Category:1000 MATERIALS new EPG 1041
- 16:53, 9 February 2018 diff hist +11,527 N Category:1041 Polypropylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:47, 9 February 2018 diff hist +1,402 Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:45, 9 February 2018 diff hist +1,568 750.7 Non-Hydraulic Considerations →750.7.2 Types: Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:43, 9 February 2018 diff hist +3,606 Category:732 Flared End Sections Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:42, 9 February 2018 diff hist +70 Category:700 STRUCTURES AND HYDRAULICS EPG 730 Thermoplastic Pipe Culverts current
- 16:41, 9 February 2018 diff hist +5,499 N Category:730 Thermoplastic Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:39, 9 February 2018 diff hist -2,362 Category:730 Corrugated Polyethylene Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications. current
- 16:37, 9 February 2018 diff hist -1,411 Category:728 Corrugated Polyvinyl Chloride Culvert Pipe EPG 728 was deleted since there is no longer a Sec 728. current
- 16:36, 9 February 2018 diff hist +7,021 N Category:724 Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:33, 9 February 2018 diff hist +57 Category:700 STRUCTURES AND HYDRAULICS
- 16:26, 9 February 2018 diff hist -554 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709,
- 16:23, 9 February 2018 diff hist -71 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A70
- 16:20, 9 February 2018 diff hist +10 751.36 Driven Piles
- 16:18, 9 February 2018 diff hist +939 751.36 Driven Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:14, 9 February 2018 diff hist -28 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) & replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50)
- 16:09, 9 February 2018 diff hist +438 Category:702 Load-Bearing Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:01, 9 February 2018 diff hist -55 237.7 Equipment and Materials List Per Bidding and Contract, revision will now require designers to include the D-15 in the Electronic Deliverables.
- 15:33, 6 February 2018 diff hist +64 m Main Page EPG 108.1.3
- 15:29, 6 February 2018 diff hist 0 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting
- 15:24, 6 February 2018 diff hist +557 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR and CM, expanded and clarified guidance for contractor to fill out Form C-220.
- 14:25, 6 February 2018 diff hist +134 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per ECR, minor clarification
- 09:40, 5 February 2018 diff hist -421 m Main Page
- 09:39, 5 February 2018 diff hist +39 m Main Page
- 09:38, 5 February 2018 diff hist +136 m Main Page EPG 153.1.3.3
- 09:30, 5 February 2018 diff hist +793 m Category:153 Agreements and Contracts →153.1.3.2 Reviewer’s Roles and Responsibilities: Per DE, new guidance to address Agreements initiated by other entities that are not initiated in eAgreements.
- 16:06, 2 February 2018 diff hist -8 m Main Page EPG 129.12
- 16:02, 2 February 2018 diff hist +69 m Category:129 Public Involvement →129.12 Presentation for Location or Design Approval to the Commission: Per DE, clarified that location & design approval is required even if an LPA is administering & paying for improvement
- 15:46, 2 February 2018 diff hist -68 m Main Page EPG Other Aspects of Pavement Design
- 15:43, 2 February 2018 diff hist +123 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections. Now is effective for April 2018.
- 14:44, 2 February 2018 diff hist +227 m Main Page EPG 616.6.89
- 09:40, 2 February 2018 diff hist 0 N File:616.14 WZ Questions 2018.docx current
- 09:39, 2 February 2018 diff hist -12 m 616.14 Work Zone Safety and Mobility Policy Per TS, update to WZ Questions for the Core Team.
- 09:32, 2 February 2018 diff hist +760 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per TS, expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
- 16:04, 1 February 2018 diff hist +196 m Main Page EPG 128.2 and EPG 231.2
- 15:53, 1 February 2018 diff hist -2,294 231.2 Clear Zones →231.2.1 Introduction: Per EPS and CCO, condensed and clarified guidance regarding clear zones and roadside hardware for 1R and 2R projects