User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:47, 7 July 2021 diff hist +4 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: updated link to Project Reviewing Checklist
- 13:46, 7 July 2021 diff hist -86 m Category:124 Quality Control / Quality Assurance (QC/QA) updated link to Project Reviewing Checklist
- 13:45, 7 July 2021 diff hist 0 N File:124.2.4 Project Reviewing Checklist.docx
- 13:45, 7 July 2021 diff hist -43 m Category:101 Standard Forms →Checklist: updated link to Project Reviewing Checklist
- 13:41, 7 July 2021 diff hist +11 m Category:124 Quality Control / Quality Assurance (QC/QA)
- 13:39, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link to Design Progress Checklist
- 13:39, 7 July 2021 diff hist 0 N File:124.2.4 Design Progress Check list.docx current
- 13:38, 7 July 2021 diff hist -45 m Category:101 Standard Forms →Checklist: updated link to Design Progress Check List
- 13:36, 7 July 2021 diff hist -1 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process
- 13:35, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link for Preliminary Plan Review Checklist
- 13:34, 7 July 2021 diff hist 0 N File:124.2.4 Check List for Preliminary Plans.docx current
- 13:31, 7 July 2021 diff hist -40 m Category:101 Standard Forms →Checklist: updated link
- 13:23, 7 July 2021 diff hist -49 m 643.2 Local Utility Adjustments - Public and Private updated D-12 link
- 13:13, 7 July 2021 diff hist -99 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 13:09, 7 July 2021 diff hist -94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 link
- 13:04, 7 July 2021 diff hist 0 N File:D-12 2021.pdf
- 13:04, 7 July 2021 diff hist -49 m Category:101 Standard Forms →Checklist: updated D-12 link
- 14:14, 2 July 2021 diff hist +40 m Category:109 Measurement and Payment →109.12.3.1 Excusable Delays for Unusual Events: inclusive language
- 13:39, 2 July 2021 diff hist -4 m 236.13 Designing Right of Way Plans inclusive language
- 13:36, 2 July 2021 diff hist +11 m 236.13 Designing Right of Way Plans inclusive language
- 13:23, 2 July 2021 diff hist -5 m 236.13 Designing Right of Way Plans
- 13:03, 2 July 2021 diff hist +1 m 238.4 Construction Surveying Inclusive language
- 12:39, 2 July 2021 diff hist +18 m 236.3 Administration inclusive laguage
- 13:06, 1 July 2021 diff hist +130 m Recent Policy Changes in the EPG EPG 1040.4
- 12:59, 1 July 2021 diff hist +94 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.4 Crashworthy End Terminal and Qualified Plastic Guardrail Block
- 14:53, 30 June 2021 diff hist +233 m Recent Policy Changes in the EPG EPG 751.6 and EPG 751.50
- 13:19, 30 June 2021 diff hist +849 m 751.6 General Quantities Per BR, clarified guidance about System I finish field coat
- 11:16, 30 June 2021 diff hist +650 m 751.50 Standard Detailing Notes →A4a. Structural Steel Protective Coatings: Per BR, provided additional options for System I structural steel protective coatings.
- 07:56, 30 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 30 2021.xlsx
- 07:55, 30 June 2021 diff hist 0 N File:751.1.2.18.2 Highway Grade Separation.docx current
- 07:55, 30 June 2021 diff hist +7 m 751.1 Preliminary Design Per BR, updated links to "Highway Grade Separation (Minor Route over Major Route)" and "Request for Final Soundings for Structures Form"
- 07:24, 30 June 2021 diff hist +15 m 748.7 Bridge Deck and Bridge End Drainage →748.7.4 Bridges on a Minor or Low Volume Route: Per BR, minor clarification
- 14:36, 29 June 2021 diff hist 0 N File:751.1.2.19 Guidance Jun 2021.xlsx
- 14:35, 29 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 2021.xlsx
- 14:34, 29 June 2021 diff hist 0 m 751.1 Preliminary Design Per BR, minor updates for "Guidance for Request for Final Soundings for Structures Form" and "Request for Final Soundings for Structures Form"
- 10:46, 29 June 2021 diff hist -2 m 748.7 Bridge Deck and Bridge End Drainage →748.7.3 Bridges on a Major Route
- 10:42, 29 June 2021 diff hist +14 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 10:23, 29 June 2021 diff hist +2 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per BR, minor clarification
- 08:10, 29 June 2021 diff hist -3 m 751.37 Drilled Shafts →Commentary on EPG 751.37.1 General
- 08:09, 29 June 2021 diff hist -28 m 751.38 Spread Footings Per BR, minor clarifications current
- 07:45, 29 June 2021 diff hist -11 m 751.37 Drilled Shafts Per BR, minor clarifications
- 14:59, 28 June 2021 diff hist -65 m 751.36 Driven Piles →751.36.1.5 Geotechnical Redundancy: Per BR, minor clarificaiton
- 14:55, 28 June 2021 diff hist -49 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.1.1 Application: Per BR, minor clarification
- 14:53, 28 June 2021 diff hist -10 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor clarifications
- 14:50, 28 June 2021 diff hist +14 m 751.2 Loads →751.2.2.2 Water Load: Per BR, minor clarification
- 14:43, 28 June 2021 diff hist -51 m 750.7 Non-Hydraulic Considerations →750.7.4.1 Standard Plans: Per BR, minor clarification to accommodate new Std Plan 504.00
- 13:41, 28 June 2021 diff hist +25 m 748.7 Bridge Deck and Bridge End Drainage Per BR, clarified terminology
- 13:39, 28 June 2021 diff hist +30 m 643.4 Railroads updated link
- 13:32, 28 June 2021 diff hist +10 m Category:712 Structural Steel Construction →712.1.4.1.4 Acceptable Field Welding Processes: Per BR, clarified terminology
- 13:28, 28 June 2021 diff hist +7 m Category:503 Bridge Approach Slabs Per BR, clarified terminology