Help
Category:100 GENERAL
From Engineering_Policy_Guide
Revision as of 09:54, 26 January 2022 by
Smithk
(
talk
|
contribs
)
(
diff
)
← Older revision
|
Latest revision
(
diff
) |
Newer revision →
(
diff
)
Jump to navigation
Jump to search
►
101 Standard Forms
▼
102 Bidding Requirements and Conditions
102.1 Construction Inspection Guidance for Sec 102
102.2 Contractor Performance Rating System
▼
103 Award and Execution of Contract
103.1 Bid Opening and Award Process
▼
104 Scope
104.1 Core Team
104.2 Project Scoping
104.3 Timeline
104.4 Completion of Scoping
104.5 Items to be Considered and Addressed
104.6 Project Scoping Checklists
104.7 Scoping Estimates
104.8 Public Involvement in Project Scoping
104.9 Environmental Considerations
104.10 Management Concurrence
104.11 Project Scoping Documentation
104.12 Scope Changes (Scope, Estimate or Fiscal Year)
104.13 Construction Inspection Guidance for Sec 104
▼
105 Control of Work
File:105.19 Digital Signature Example 06-23.jpg
▼
106 Control of Material
►
106.3.2 Material Inspection Test Methods
106.1 Source of Supply and Quality Requirements
106.2 Local Materials Sources
106.3 Samples, Tests and Cited Specifications
106.4 Plant Inspections
106.5 Storage of Materials
106.6 Handling Material
106.7 Unacceptable Material
106.8 Material Furnished by the Commission
106.9 Buy America Requirement
106.10 Missouri Domestic Products Requirement
106.11 Metric Implementation
106.12 Pre-Acceptance Lists (PAL)
106.13 Quality Control/Quality Assurance
106.14 Proprietary Items
106.15 Pipe Shipping Report Form
106.16 Special Designs and Shop Drawings
106.17 New Product Evaluation
106.18 Technician Certification Program
106.19 Materials Acceptance
106.20 Reporting
106.21 Summary of Materials Inspected
106.22 Material Inspection Revisions
106.23 Online Research Publications (Research Publications)
106.24 Purchase Order Items
▼
107 Legal Relations and Responsibility to the Public
File:MODOT Certificate of Insurance Sample 07-23.pdf
►
108 Prosecution and Progress
►
109 Measurement and Payment
►
110 State and Federal Wage Rates and Other Requirements
►
113 Construction Inspection Guidance for Contractor's Claims
▼
121 Project Planning, Prioritization and STIP Commitments
121.1 Public Involvement and Decision-Making
121.2 The Planning Framework for Transportation Decision-Making
121.3 The Statewide Transportation Improvement Program (STIP)
121.4 Quality Assurance / Quality Control for Project Prioritization
121.5 Asset Management
121.6 STIP Amendments
121.7 Program Estimates
►
122 Aviation
►
123 Federal-Aid Highway Program
►
124 Quality Control / Quality Assurance (QC/QA)
►
125 CADD Services
►
126 Location Study and Alternatives Analysis
▼
127 MoDOT and the Environment
127.1 Request for Environmental Services
127.2 Historic Preservation and Cultural Resources
127.3 Community Impact Assessment
127.4 Wetlands and Streams
127.7 Threatened and Endangered Species
127.8 Hazardous and Solid Waste
127.9 Floodplain Management
127.10 Section 4(f) Public Lands
127.11 Farmland Conversion
127.12 Air Quality
127.13 Noise
127.14 National Environmental Policy Act (NEPA) Classification and Documents
127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents
127.16 Wetland and Stream Mitigation
127.17 Wetland and Stream Mitigation Banking
127.18 Job Special Provisions (JSP) and Contract Documents
127.19 Section 404 Clean Water Act for Bridge Demolitions
127.20 Stream Stewardship Trust Fund in-Lieu Fee Mitigation Program
127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties
127.22 Off-Site Borrow, Spoil, and Staging Areas
127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process
127.24 Speleological Findings
127.25 Maintenance Environmental Policies
127.26 Environmental Classification
127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities
127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA)
127.29 Stormwater
►
128 Conceptual Studies
►
129 Public Involvement
▼
130 Value Engineering
130.6 Project Manager’s Guide
130.7 Value Engineering Team Leader Guide
▼
131 Other General Procedures
131.1 Design Exception Process
131.2 Proprietary Items and Public Interest Findings
131.4 Design Exception Process
131.5 Proprietary Items and Public Interest Findings
▼
132 Safety
132.1 Material Inspection for Safety
132.2 Construction Inspection Guidelines for Safety Precautions
▼
133 Snow and Ice Control
133.1 Materials for Snow and Ice Control
133.2 Equipment for Snow and Ice Control
133.3 Snow and Ice Control Personnel
133.4 Snow and Ice Control Operations
133.5 Operator’s Guide for Anti-Icing
▼
134 Engineering Professional Services
Engineering Professional Services Guidelines
►
135 The Section 106 Process
▼
136 Local Public Agency (LPA) Policy
LPA:136.1 Introduction
LPA:136.2 Certification and Training
LPA:136.3 Federal Aid Basics
LPA:136.4 Consultant Selection and Consultant Contract Management
LPA:136.5 Non-Infrastructure
LPA:136.6 Environmental and Cultural Requirements
LPA:136.7 Design
LPA:136.8 Local Public Agency Land Acquisition
LPA:136.9 Plans, Specs and Estimates (PSE)
LPA:136.10 Advertisement for Bid and Project Award
LPA:136.11 Local Public Agency Construction
LPA:136.12 Figures, Glossary and Other Useful Links
LPA:136.13 LPA Policy Changes
►
137 Construction Inspection Guidance for Records to be Maintained
►
138 Project Development Chronology
►
139 Design - Build
►
140 Encroachments and Items Permitted on MoDOT’s Right of Way
▼
141 Partnership Development
141.1 Cost Share Program
141.2 Missouri Transportation Finance Corporation (MTFC) Loans
141.3 Local Funding Options
141.4 Transportation Improvement Program Amendments
141.5 Dispute Resolution Process
141.6 Acronyms and Definitions
141.7 Transportation Improvement Program Approval
141.8 Sponsorship Programs
►
142 Missouri One Call System
►
143 Practical Design
▼
144 Practical Operations
144.5 Pavement Maintenance
►
145 Transportation Management Systems (TMS)
►
146 Disadvantaged Business Enterprise (DBE)
▼
147 Innovative Contracting
147.1 Alternative Technical Concepts
147.2 Add Alternate Bidding
147.3 Job Order Contracting (JOC)
147.4 Fixed Price Variable Scope (FPVS) Contracting
►
148 Accelerated Bridge Construction (ABC)
►
149 Project Delivery Determination and Initial Risk Assessment
►
150 Quality Management
►
151 Administrative Rule Creation or Modification Process
►
152 Contactor Bonding Responsibilities
▼
153 Agreements and Contracts
153.4 Administrative
153.5 Bridge
153.6 Chief Counsel's Office
153.7 Construction and Materials
153.8 Customer Relations
153.9 Design
153.10 Design – Escrow
153.11 Financial Services
153.12 General Services
153.13 Highway Safety
153.14 Human Resources
153.15 Information Systems
153.16 Maintenance
153.17 Medical Board Employee Benefits
153.18 Motor Carrier Services
153.19 Multimodal
153.20 Right of Way
153.21 Traffic
153.22 Transportation Planning
153.23 Utility
►
170 Maintenance Activity Planning Guidelines
▼
171 Maintenance Policy and Operations
171.1 Administration
171.2 Buildings and Grounds
171.3 Roadway Maintenance
171.4 Shoulders and Approaches
171.5 Drainage
171.6 Roadsides
171.7 Bridge Maintenance
171.8 Snow and Ice Control
171.9 Environmental
171.10 Traffic Control
171.11 Roadside Appurtenances
171.12 Maintenance Policy History
►
172 Maintenance Facility Performance Expectations Environmental Compliance
►
173 Erosion Control for Maintenance Operations
►
174 Maintenance Management System (MMS)
EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding).
Navigation menu
Personal tools
Log in
Namespaces
Category
Discussion
Variants
Views
Read
View source
View history
More
Search
navigation box|Navigation
Main Page
100 General
136 LPA Policy
200 Geometrics
300 Bases
400 Flexible Pavement
500 Rigid Pavement
600 Incidental Construction
700 Structures and Hydraulics
800 Roadside Development
900 Traffic Control
1000 Materials
1100 Maintenance Materials
Quick Reference Guides
Help
Search Options
Search the EPG using Google Search
Contact Us
Report a Broken Link
Other MoDOT Standards
Specifications
Standard Plans
Job Special Provisions
Design Standard Letters
Bid Items
Engineering Policy Revision Request Form
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information