Line 30: Line 30:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[127.25 Maintenance Environmental Policies#127.25.2 Hazardous Material Spills|EPG 127.25.2 Hazardous Material Spills]]'''
+
'''[[751.22 P/S Concrete I Girders#Calculation of camber (upward)|EPG 751.22.2.5 Deformations]]'''
  
1/10/19: Guidance has been updated to current practice.
+
4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".
  
'''[[:Category:903 Highway Signing#Guidance for Using Sign Management System (SMS)|Guidance for Using Sign Management System]] and [[903.3 Post-Mounted Signing#903.3.16 Ordering Signs|EPG 903.3.16 Ordering Signs]]'''
+
'''[[106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators|EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators]]'''
  
1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available. 
+
4/11/19: This new Test Method is now available.
  
'''[[236.3 Administration#The District Right of Way Manager|EPG 236.3.7 Right of Way Clearance Certification]]'''
+
'''[[106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)|EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)]]'''
  
1/8/19: Added guidance for the RW clearance process for projects programmed in the STIP with RW funding but that do not require RW to construct the project.  
+
4/10/18: This new Test Method is now available.  
  
'''[[:Category:121 Project Planning, Prioritization and STIP Commitments|EPG 121 Project Planning, Prioritization and STIP Commitments]]'''
+
'''[[236.13 Designing Right of Way Plans#236.13.13 Plan Submittal and Filing|EPG 236.13.13 Plan Submittal and Filing]]'''
  
1/4/19: Guidance has been updated to current practice.  EPG 121.2 The Planning Process and EPG 121.5 Prioritization Factors were both re-written and re-titled as [[121.2 The Planning Framework for Transportation Decision-Making|EPG 121.2 The Planning Framework for Transportation Decision-Making]] and [[121.5 Asset Management|EPG 121.5 Asset Management]], respectively.
+
4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.
  
'''[[910.4 ITS Achitecture#Project ITS Architecture Documentations Requirements|EPG 910.4 ITS Achitecture]]
+
'''Steel Girder Galvanizing Procedure'''
  
1/3/19: New guidance on completing a systems engineering analysis on all ITS projects is now available.
+
3/27/19: Guidance was added in [[751.50 Standard Detailing Notes#(A4a1.8.1) Place|EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures]] and [[751.14 Steel Superstructure #Galvanized nonweathering structural|EPG 751.14.5.8 Protective Coating Requirements]] to clarify steel girder galvanizing procedure.
  
'''Weathering Steel'''
+
'''[[:Category:403 Asphaltic Concrete Pavement#Rice Test|Superpave Rice Testing Frequency]]'''
  
12/28/18: Guidance for the use of weathering steel has been added to [[751.1 Preliminary Design#Weathering steel may be used|EPG 751.1.2.9 Girder Type Selection]].
+
3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.
  
'''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]'''
+
'''[[media:152.pdf|Bonds - What They Are and How They Work]]'''
  
12/28/18: The district now completes an RES at each project development milestone, or at least at the Location/Conceptual state and final design.  
+
3/15/19: This new tutorial is now displayed in [[:Category:152 Contactor Bonding Responsibilities|EPG 152 Contactor Bonding Responsibilities]].
  
'''The “DBE Termination, Substitution or Additional Request” Form'''
+
'''[[910.3 Dynamic Message Signs (DMS)|EPG 910.3 Dynamic Message Signs]]'''
  
12/18/18: Guidance in [[:Category:108 Prosecution and Progress#2. For DBE requests,|EPG 108.1.1 Review and Approval of a Subcontract Request]] and [[:Category:108 Prosecution and Progress#Once a project is awarded,|EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting]] was clarified on the use of this form when a prime contractor proposes to terminate, substitute or add an additional DBE.
+
3/14/19: New types of DMSs are now referenced as a good portion of this article was updated.
  
'''[[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]]'''
+
'''Ephemeral Streams'''
  
12/12/18: Guidance regarding submittals of a final RES and the requirement of only 1 RES for some projects has been updated.
+
3/12/19: Guidance in [[750.7 Non-Hydraulic Considerations#750.7.3.1 Embedment Requirements|EPG 750.7.3.1 Embedment Requirements]] was updated with a minor note stating the Corps of Engineers must validate whether a stream is "ephemeral".
  
'''TMA Light Bar'''
+
'''[[236.7 Negotiation#236.7.2.3 Prompt Offer of Just Compensation|EPG 236.7.2.3 Prompt Offer of Just Compensation]]'''
  
12/11/18: Guidance in [[:Category:612 Impact Attenuators#612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting|EPG 612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting]] and [[616.27 Fleet Lighting#616.27.1.1 Fleet Lighting Levels|EPG 616.27.1.1 Fleet Lighting Levels, Level 5]] has been updated to state that the Light Bar may be used and the Emergency Alert lights should be used on the Rear Advanced Warning Truck for striping and sweeping operations. TA-35 MT and TA-35a-d MT were also updated.  
+
3/6/19: Guidance was clarified to allow the minimum offer to be reduced if approved by the Asst. to State Design Engineer – Right of Way.
  
'''[[media:104.7 EngFac SFY 16 to 18.pdf|Engineering Factors Report]]'''
+
'''[[616.16 Law Enforcement Services#616.16.1 Guidelines for Providing Law Enforcement Services|EPG 616.16.1 Guidelines for Providing Law Enforcement Services]]'''
  
12/10/18: The latest version of the Engineering Factors Report, providing SFY 2016 to SFY 2018 info, is now presented in [[104.7 Estimates|EPG 104.7 Estimates]].  
+
3/1/19: Guidelines were clarified to provide a more standardized process.
  
'''[[413.6 Scrub Seal Treatment|EPG 413.6 Scrub Seal Treatment]]'''
+
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
  
12/10/18: Scrub seal treatment guidance is now available.
+
3/1/19: Several ODA policies were updated to current practice, especially in [[236.16 Outdoor Advertising#236.16.22 Monthly Reports|EPG 236.16.22 Monthly Reports]].
  
'''AASHTOWare Project Quick Reference Guides'''
+
'''[[121.5 Asset Management|EPG 121.5 Asset Management]]'''
  
12/10/18: [http://epg.modot.org/index.php/Category:101_Standard_Forms#AASHTOWare_Project_Quick_Reference_Guides_.28QRGs.29 AASHTOWare Project Quick Reference Guides] are now available in EPG 101 Standard Forms.  
+
2/27/19: Guidance has been revised to coordinate with current practice.
  
'''[[127.9 Floodplain Management and the Regulatory Floodway#127.9.2 Process|EPG 127.9.2 Process]]'''
+
'''[[147.3 Job Order Contracting (JOC)#If the option for extending the contract|EPG 147.3.5 Term Extension of Job Order Contracts]]'''
  
12/4/18: Guidance to adhere to CFR 650.111 was added to the bottom of EPG 127.9.2.
+
2/25/19: Guidance about providing a reason for extending the contract has been added.
  
'''[[127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents#127.15.3 Document Age|EPG 127.15.3 Document Age]]'''
+
'''[[806.1 Erosion Control Measures#806.1.7.2 Construction Considerations|EPG 806.1.7.2 Construction Considerations]]'''
  
11/30/18: Re-evaluations are required for all NEPA approvals that are more than 3 years old.
+
2/22/19: Guidance about erosion control for temporary pipe and temporary construction crossings was clarified.
  
'''NEPA Glossary'''
+
'''New QRG'''
  
11/29/18: A new [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.5 NEPA Glossary|glossary of NEPA terms]] is now available in EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents.
+
2/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Adding_Concrete_Mix_Design.doc AWP MA Adding New Concrete Mix Design] QRG is now available.
  
'''[[236.16 Outdoor Advertising#236.16.15 Vegetation Removal|EPG 236.16.15 Vegetation Removal]]'''
+
'''[[media:134.2.2.2.docx|Solicitation and Request Letter]]'''
  
11/28/18: Guidance was updated, particularly in [[236.16 Outdoor Advertising#236.16.15.6 Endangered Species Act|EPG 236.16.15.6 Endangered Species Act]] and [[236.16 Outdoor Advertising#236.16.15.8 Mowing and Brush Hogging|EPG 236.16.15.8 Mowing and Brush Hogging]], to be in line with the Endangered Species Act
+
2/13/19: The Solicitation and Request letter has been updated.
  
'''[[141.1 Cost Share Program|EPG 141.1 Cost Share Program]]'''
+
'''[[751.1 Preliminary Design#3. If an existing wearing surface|EPG 751.1 Preliminary Design, Safety Barrier Curb (SBC) and Median Barrier Curb (MBC)]]'''
  
11/20/18: Guidance in EPG 141.1 Cost Share Program has been updated as approved by the Commission. The revisions will impact the program statewide.
+
2/8/19: Revision coordinates guidance with the FHWA requirement for new wearing surfaces.
  
'''[[236.4 Description Writing and Titles#Permanent Sidewalk Easement Clause|Permanent Sidewalk Easement Clause]]'''
+
'''[[147.3 Job Order Contracting (JOC)#147.3.9 Change Order Approvals|EPG 147.3.9 Change Order Approvals]]'''
  
11/19/18: In [[#236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions|EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions]], a permanent sidewalk easement clause is now available for districts' use.
+
1/28/19: EPG 147.3.9 was rewritten and retitled to provide new Change Order guidance for JOCs.
  
'''[[:Category:105 Control of Work#Among subjects to be discussed|EPG 105.9.12 Preconstruction Conference]]'''
+
'''Asphalt Shoulder Surface Mix'''
  
11/15:18: Subjects to be discussed at this conference now include review of the process to request any DBE termination, substitution or addition.
+
1/25/19: Guidance in [[Other Aspects of Pavement Design#For resurfacing projects on roadways with shoulders 4|EPG Shoulder Surface]] was revised so that all shoulders 4 ft. and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.
  
'''[[237.9 Submission of Plans and Supporting Documents#237.9.3.1 Schedule for Submittal|EPG 237.9.3.1 Schedule for Submittal]]'''
+
'''[[413.3 Ultrathin Bonded Asphalt Wearing Surface#413.3.3 Maintenance Surface Treatment|EPG 413.3.3 Maintenance Surface Treatment]]'''
  
11/7/18: Guidance has been added about a required e-mail for re-let or moved projects.
+
1/25/19: The UBAWS Treatment policy was clarified, including the identification of the proper thicknesses for UBAWS types.
  
'''[[:Category:604 Miscellaneous Drainage#Concrete Headwalls, Drop Inlets And Manholes (Sec 604.10)|EPG 604, Construction Requirements (Sec 604.10.3)]]'''
+
'''[[751.22 P/S Concrete I Girders#751.22.3.13 Intermediate Diaphragms|EPG 751.22.3.13 Intermediate Diaphragms]]'''
  
10/30/18: When approached with alternative products on a job as part of a change order or VE, this new guidance states that the RE should initially determine suitability and also consult the Field Office and New Products Coordinator to ensure value, uniformity and tracking.
+
1/11/19: Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.  
  
'''[[media:703.2.8 Placing Diaphragm Concrete.pdf|Placing Diaphragm Concrete]]'''
+
'''[[751.50 Standard Detailing Notes#(A3.5.1) Use when uncoated steel|Standard Detailing Note A3.5.1]]'''
  
10/25/18: In [[:Category:703 Concrete Masonry Construction#A construction joint will normally be provided|EPG 703.2.8 Concrete Placement]], this new presentation explains a MoDOT best practice.
+
1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.
  
'''[[:Category:626 Rumble Strips|EPG 626 Rumble Strips]]'''
+
'''[[127.25 Maintenance Environmental Policies#127.25.2 Hazardous Material Spills|EPG 127.25.2 Hazardous Material Spills]]'''
  
10/23/18: Clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. The minimum pavement thickness was revised from from 1 3/4" to 1".
+
1/10/19: Guidance has been updated to current practice.
  
'''[[106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs|EPG 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs]]'''
+
'''[[:Category:903 Highway Signing#Guidance for Using Sign Management System (SMS)|Guidance for Using Sign Management System]] and [[903.3 Post-Mounted Signing#903.3.16 Ordering Signs|EPG 903.3.16 Ordering Signs]]'''
  
10/23/18: This new test method corresponds to the spec change in Sec 613 that allows this alternate test method.
+
1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available. 

Revision as of 13:44, 22 April 2019

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

EPG 751.22.2.5 Deformations

4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".

EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators

4/11/19: This new Test Method is now available.

EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)

4/10/18: This new Test Method is now available.

EPG 236.13.13 Plan Submittal and Filing

4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.

Steel Girder Galvanizing Procedure

3/27/19: Guidance was added in EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures and EPG 751.14.5.8 Protective Coating Requirements to clarify steel girder galvanizing procedure.

Superpave Rice Testing Frequency

3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.

Bonds - What They Are and How They Work

3/15/19: This new tutorial is now displayed in EPG 152 Contactor Bonding Responsibilities.

EPG 910.3 Dynamic Message Signs

3/14/19: New types of DMSs are now referenced as a good portion of this article was updated.

Ephemeral Streams

3/12/19: Guidance in EPG 750.7.3.1 Embedment Requirements was updated with a minor note stating the Corps of Engineers must validate whether a stream is "ephemeral".

EPG 236.7.2.3 Prompt Offer of Just Compensation

3/6/19: Guidance was clarified to allow the minimum offer to be reduced if approved by the Asst. to State Design Engineer – Right of Way.

EPG 616.16.1 Guidelines for Providing Law Enforcement Services

3/1/19: Guidelines were clarified to provide a more standardized process.

EPG 236.16 Outdoor Advertising

3/1/19: Several ODA policies were updated to current practice, especially in EPG 236.16.22 Monthly Reports.

EPG 121.5 Asset Management

2/27/19: Guidance has been revised to coordinate with current practice.

EPG 147.3.5 Term Extension of Job Order Contracts

2/25/19: Guidance about providing a reason for extending the contract has been added.

EPG 806.1.7.2 Construction Considerations

2/22/19: Guidance about erosion control for temporary pipe and temporary construction crossings was clarified.

New QRG

2/14/19: The new AWP MA Adding New Concrete Mix Design QRG is now available.

Solicitation and Request Letter

2/13/19: The Solicitation and Request letter has been updated.

EPG 751.1 Preliminary Design, Safety Barrier Curb (SBC) and Median Barrier Curb (MBC)

2/8/19: Revision coordinates guidance with the FHWA requirement for new wearing surfaces.

EPG 147.3.9 Change Order Approvals

1/28/19: EPG 147.3.9 was rewritten and retitled to provide new Change Order guidance for JOCs.

Asphalt Shoulder Surface Mix

1/25/19: Guidance in EPG Shoulder Surface was revised so that all shoulders 4 ft. and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.

EPG 413.3.3 Maintenance Surface Treatment

1/25/19: The UBAWS Treatment policy was clarified, including the identification of the proper thicknesses for UBAWS types.

EPG 751.22.3.13 Intermediate Diaphragms

1/11/19: Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.

Standard Detailing Note A3.5.1

1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.

EPG 127.25.2 Hazardous Material Spills

1/10/19: Guidance has been updated to current practice.

Guidance for Using Sign Management System and EPG 903.3.16 Ordering Signs

1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available.