User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:18, 5 September 2018 diff hist 0 File:748.7 Figure Example Bridge Profile.pdf Smithk uploaded a new version of File:748.7 Figure Example Bridge Profile.pdf current
- 10:49, 5 September 2018 diff hist 0 File:712 Welder Qualification Test Details.pdf Smithk uploaded a new version of File:712 Welder Qualification Test Details.pdf current
- 13:59, 4 September 2018 diff hist +93 N 127.27 Guidelines for Obtaining Environmental Clearance for Project Specific Locations Smithk moved page 127.27 Guidelines for Obtaining Environmental Clearance for Project Specific Locations to 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities: Per Env'l, updated archaic phrase "project specific loc... current
- 13:59, 4 September 2018 diff hist 0 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities Smithk moved page 127.27 Guidelines for Obtaining Environmental Clearance for Project Specific Locations to 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities: Per Env'l, updated archaic phrase "project specific loc...
- 13:58, 4 September 2018 diff hist -26 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities Per Env'l, updated archaic phrase "project specific locations" to "off-site activities" to line up with FHWA terminology
- 13:11, 4 September 2018 diff hist 0 File:747 Bridge Survey Location Request.docx Smithk uploaded a new version of File:747 Bridge Survey Location Request.docx
- 13:10, 4 September 2018 diff hist 0 File:747 Bridge Survey Location Request.docx Smithk uploaded a new version of File:747 Bridge Survey Location Request.docx
- 15:23, 31 August 2018 diff hist +4 m Main Page
- 12:51, 31 August 2018 diff hist -259 Main Page
- 12:51, 31 August 2018 diff hist +443 m Main Page EPG 751.12.2 and EPG 751.50 H.10
- 12:39, 31 August 2018 diff hist -60 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per BR, revised to allow saw cut joints for conventional-formed barrier curbs.
- 12:38, 31 August 2018 diff hist -250 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, revised to allow saw cut joints for conventional-formed barrier curbs.
- 10:29, 31 August 2018 diff hist +557 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2 Safety Barrier Bridge Curbs (NJ Shape): Per BR, revised to allow saw cut joints for conventional-formed barrier curbs.
- 10:17, 31 August 2018 diff hist 0 File:751.12.2.7.jpg Smithk uploaded a new version of File:751.12.2.7.jpg current
- 13:52, 30 August 2018 diff hist +1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings): Per BR, revised underlining
- 13:28, 29 August 2018 diff hist -1,383 m Category:101 Standard Forms →Right of Way: Per RW, deleted archaic RW forms
- 14:20, 28 August 2018 diff hist -5 m Category:101 Standard Forms →Junkyards: Per OA, updated form link
- 14:20, 28 August 2018 diff hist -17 m 236.17 Junkyards Per OA, updated links to forms
- 13:05, 28 August 2018 diff hist 0 236.16 Outdoor Advertising
- 13:00, 28 August 2018 diff hist 0 m 236.16 Outdoor Advertising Per OA, updated links to forms
- 14:45, 27 August 2018 diff hist -11 m Category:747 Bridge Reports and Layouts →747.2 Bridge Surveys
- 14:36, 27 August 2018 diff hist +1 m Category:747 Bridge Reports and Layouts →747.2 Bridge Surveys
- 14:27, 27 August 2018 diff hist -190 m Category:747 Bridge Reports and Layouts →747.2.2.1 Bridge Survey Report: Per BR, minor deletion of old info related to previous changes to the Bridge Survey Form
- 14:23, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.3.1.3 Additional Information for Bridge Substructure Widening
- 14:22, 27 August 2018 diff hist -76 m Category:747 Bridge Reports and Layouts →747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 14:20, 27 August 2018 diff hist +75 m Category:747 Bridge Reports and Layouts →747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 14:17, 27 August 2018 diff hist -131 m Category:747 Bridge Reports and Layouts →747.2.5 Other Miscellaneous Structures
- 13:55, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2.3.6.3 Additional Information for Railroad Crossings
- 13:55, 27 August 2018 diff hist -68 m Category:747 Bridge Reports and Layouts →747.2.3.6.3 Additional Information for Railroad Crossings
- 13:43, 27 August 2018 diff hist +2 m Category:747 Bridge Reports and Layouts →747.2.3.5 Valley/Channel Section Sheets
- 13:32, 27 August 2018 diff hist +2 m Category:747 Bridge Reports and Layouts →747.2.3.4.1 General Information for All Profile Sheets
- 13:32, 27 August 2018 diff hist -51 m Category:747 Bridge Reports and Layouts →747.2.3.4.1 General Information for All Profile Sheets
- 13:30, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2.3.4.1 General Information for All Profile Sheets
- 13:28, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2.3.2.2 Additional Information for Stream Crossings
- 13:26, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2.3.2.1 General Information for All Plan Sheets
- 13:21, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings
- 13:19, 27 August 2018 diff hist -1 m Category:747 Bridge Reports and Layouts →747.2.2.2 Bridge Survey Sheets
- 13:19, 27 August 2018 diff hist +1 m Category:747 Bridge Reports and Layouts →747.2.2.2 Bridge Survey Sheets
- 13:18, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2 Bridge Surveys
- 13:17, 27 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts
- 10:52, 27 August 2018 diff hist +1 m Main Page
- 10:42, 27 August 2018 diff hist +54 m 236.13 Designing Right of Way Plans →236.13.18 Demolition and Removal of Improvements: Per RW, updated broken link and archaic reference
- 09:07, 27 August 2018 diff hist -6 m Main Page
- 09:06, 27 August 2018 diff hist -303 m Main Page EPG 236.3.4.4
- 15:14, 24 August 2018 diff hist 0 N File:236.3.4.4 Advance Aquisition Certification.docx current
- 15:14, 24 August 2018 diff hist +3 m 236.3 Administration
- 15:10, 24 August 2018 diff hist +3,149 m 236.3 Administration →Federally Funded Early Acquisition: Per RW, MAP-21 has been approved for quite some time and MoDOT has been conducting business by those guidelines. We received FHWA's approval to now update the EPG accordingly.
- 14:52, 24 August 2018 diff hist +9 Help Article →Division Contacts
- 14:40, 24 August 2018 diff hist +288 m 620.12 Construction Inspection for Sec 620 →620.12.2.3 Inspection (Sec 620.2.3): Per CM, further revised to accord with Sec 620.40
- 14:25, 24 August 2018 diff hist 0 File:147.3.3.pdf Smithk uploaded a new version of File:147.3.3.pdf current
- 14:24, 24 August 2018 diff hist 0 File:147.3.2 Rte 65.pdf Smithk uploaded a new version of File:147.3.2 Rte 65.pdf current
- 14:22, 24 August 2018 diff hist 0 File:147.3.2.pdf Smithk uploaded a new version of File:147.3.2.pdf current
- 14:21, 24 August 2018 diff hist 0 File:147.3.1.pdf Smithk uploaded a new version of File:147.3.1.pdf current
- 14:19, 24 August 2018 diff hist 0 File:147.3.1 FAQ.pdf Smithk uploaded a new version of File:147.3.1 FAQ.pdf current
- 14:18, 24 August 2018 diff hist 0 File:147.3.1 white paper.pdf Smithk uploaded a new version of File:147.3.1 white paper.pdf current
- 14:16, 24 August 2018 diff hist 0 File:147.3.1 guidelines.pdf Smithk uploaded a new version of File:147.3.1 guidelines.pdf current
- 14:15, 24 August 2018 diff hist 0 File:147.3.1 guidelines.pdf Smithk uploaded a new version of File:147.3.1 guidelines.pdf
- 13:51, 24 August 2018 diff hist +100 m 236.3 Administration →236.3.7.6 Conditional Right of Way Clearance Certification: Per RW, minor revision to accommodate MAP-21
- 13:49, 24 August 2018 diff hist +264 m 236.3 Administration Per RW, minor revisions to accommodate MA-21
- 11:09, 24 August 2018 diff hist 0 m 236.5 Property Management updated link
- 11:05, 24 August 2018 diff hist +6 m Category:101 Standard Forms →Property Management: Per RW, updated Real Estate Risk Assessment Form
- 11:03, 24 August 2018 diff hist -106 m Category:101 Standard Forms →Property Management: Per RW, updated link to Realty Asset Sale Legal Opinion memo
- 10:58, 24 August 2018 diff hist -6 m 236.3 Administration Per RW, updated link to Categorical Exclusion Review
- 10:56, 24 August 2018 diff hist -2 m Category:101 Standard Forms →Administration: Per RW, updated form link
- 09:56, 24 August 2018 diff hist +3 m 620.12 Construction Inspection for Sec 620 →620.12.2.3 Inspection (Sec 620.2.3)
- 15:22, 23 August 2018 diff hist +4 m 620.12 Construction Inspection for Sec 620 →620.12.2.3 Inspection (Sec 620.2.3)
- 15:21, 23 August 2018 diff hist -38 m 620.12 Construction Inspection for Sec 620 →620.12.2.3 Inspection (Sec 620.2.3)
- 15:19, 23 August 2018 diff hist -1 m 620.12 Construction Inspection for Sec 620 →620.12.2.3 Inspection (Sec 620.2.3): Revised to accord with Sec 620.40
- 12:15, 23 August 2018 diff hist 0 m 643.2 Local Utility Adjustments - Public and Private →643.2.10 Roadway Plans and Job Special Provisions: Per DE, updated D-12
- 14:58, 22 August 2018 diff hist +39 m 127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents →127.15.2 Process: Per Env'l, updated link
- 15:01, 21 August 2018 diff hist 0 File:751.40 Concrete Wearing Surface Slab Edge Repair (Concrete Edge Repair) no 1.gif Smithk uploaded a new version of File:751.40 Concrete Wearing Surface Slab Edge Repair (Concrete Edge Repair) no 1.gif current
- 13:55, 21 August 2018 diff hist 0 m 236.3 Administration
- 13:47, 21 August 2018 diff hist +113 Category:101 Standard Forms →Property Management
- 13:14, 21 August 2018 diff hist +15 m 751.5 Structural Detailing Guidelines →751.5.2.1.4 Section Thru Existing Deck Detail: updated link
- 09:42, 21 August 2018 diff hist -14 m Category:101 Standard Forms →Administration
- 09:28, 21 August 2018 diff hist -32 m Category:101 Standard Forms →Administration
- 09:25, 21 August 2018 diff hist -2 m Category:101 Standard Forms →Description Writing and Titles
- 09:24, 21 August 2018 diff hist +41 m Category:101 Standard Forms →Property Management
- 09:18, 21 August 2018 diff hist +164 m Category:101 Standard Forms →Relocation Assistance Program
- 09:12, 21 August 2018 diff hist 0 m Category:101 Standard Forms →Junkyards
- 09:11, 21 August 2018 diff hist -3,136 m Category:101 Standard Forms →Outdoor Advertising
- 09:10, 21 August 2018 diff hist +35 m 236.16 Outdoor Advertising
- 14:45, 20 August 2018 diff hist 0 m Category:747 Bridge Reports and Layouts →747.2.3.2.1 General Information for All Plan Sheets: updated links
- 09:56, 20 August 2018 diff hist -51 m 237.4 Plan-Profile Sheets →237.4.15 Standard Plans
- 13:15, 17 August 2018 diff hist -94 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant: Per DE, removed personal names associated with titles
- 09:17, 17 August 2018 diff hist 0 File:607 Typical Fencing and Access.pdf Smithk uploaded a new version of File:607 Typical Fencing and Access.pdf current
- 15:05, 16 August 2018 diff hist +86 m Main Page EPG 106.9
- 14:58, 16 August 2018 diff hist +25 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 14:56, 16 August 2018 diff hist +1,895 m 106.9 Buy America Requirement Per CM, additional guidance to clarify when Buy America applies to manufactured items.
- 10:39, 16 August 2018 diff hist +7 m 153.21 Traffic Per Commission, minor update of which executive signs for MoDOT for TR14
- 10:11, 16 August 2018 diff hist -82 m Category:105 Control of Work →105.21 Agreement for Shifting State Highway Entrance: Per Commission, link update
- 08:10, 16 August 2018 diff hist 0 m Category:945 Overdimension / Overweight Permits Per MCS, updated link to OD/OW Load Permit Regulations link
- 07:49, 15 August 2018 diff hist 0 File:236.16.2 map.jpg Smithk uploaded a new version of File:236.16.2 map.jpg current
- 07:48, 15 August 2018 diff hist -9 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: Per OA, updated map
- 14:47, 14 August 2018 diff hist -51 m Main Page EPG 231.2
- 13:25, 14 August 2018 diff hist 0 m 231.2 Clear Zones →231.2.1 Introduction
- 13:23, 14 August 2018 diff hist 0 N File:231.2 Preferred Cross Sections.jpg current
- 13:22, 14 August 2018 diff hist 0 N File:231.2 Clear Zone for Non-recoverable.jpg current
- 13:22, 14 August 2018 diff hist 0 N File:231.2 Horizontal Curve Adjustments.jpg current
- 13:18, 14 August 2018 diff hist 0 File:231.2 Clear Zone Distance.docx Smithk uploaded a new version of File:231.2 Clear Zone Distance.docx
- 13:17, 14 August 2018 diff hist 0 N File:231.2 Clear Zone Distance.docx
- 13:17, 14 August 2018 diff hist +139 m 231.2 Clear Zones Per EPS, clarified clear zone guidance
- 10:56, 14 August 2018 diff hist +1 Main Page
- 10:55, 14 August 2018 diff hist -76 m Main Page EPG 756
- 10:23, 14 August 2018 diff hist 0 N File:756 LFD flow chart.pdf
- 10:22, 14 August 2018 diff hist +3 m Category:756 Seismic Design Per BR, updated LFD Bridge Seismic Design Process Flowchart to include, among other changes, new superstructure replacement guidance
- 14:22, 13 August 2018 diff hist -328 m Main Page EPG 231.8
- 12:18, 13 August 2018 diff hist -3,883 231.8 Bridge Width Per BR, revision coordinated with Green Book guidance that clear bridge width shall be the same as the approach roadway for collectors, arterials and freeways.
- 10:06, 13 August 2018 diff hist +10 m 236.8 Relocation Assistance Program Updated references to archaic districts
- 10:04, 13 August 2018 diff hist -1 m 236.6 Appraisal and Appraisal Review →236.6.5.13 Fee Appraiser Performance Evaluation
- 10:02, 13 August 2018 diff hist +20 m 236.1 General Information Updated references to archaic districts
- 10:51, 10 August 2018 diff hist -12 m LPA:136.11 Local Public Agency Construction Updated 23 CFR link
- 10:39, 10 August 2018 diff hist +1 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others: Per Env'l, updated District Hazardous Material Coordinator Contact List (127.25.2.1 contact.docx)
- 10:29, 10 August 2018 diff hist 0 File:127.25.2.1 Contact.docx Smithk uploaded a new version of File:127.25.2.1 Contact.docx
- 12:06, 9 August 2018 diff hist -4,213 m 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs Removed TM-7 info. It will be released in coordination with revisions in Sec 613 later in 2018
- 12:02, 9 August 2018 diff hist -260 m Main Page Removed reference to TM-7. It will be announced later this year to coordinate with Sec 613
- 11:24, 9 August 2018 diff hist +82 m Main Page EPG 106.3.2.7
- 11:19, 9 August 2018 diff hist 0 N File:106.3.2.7.3 scale.jpg current
- 11:19, 9 August 2018 diff hist 0 N File:106.3.2.7.3 plunger.jpg current
- 11:18, 9 August 2018 diff hist 0 N File:106.3.2.7.3 test areas.jpg current
- 11:18, 9 August 2018 diff hist 0 N File:106.3.2.7.1 verification.jpg current
- 11:17, 9 August 2018 diff hist 0 N File:106.3.2.7.1 abrasive.jpg current
- 11:17, 9 August 2018 diff hist 0 N File:106.3.2.7.1 rebound.jpg current
- 11:17, 9 August 2018 diff hist +4,298 m 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs New TM-7 from CM
- 11:15, 9 August 2018 diff hist +105 N 106.3.2.7 TM-7 Smithk moved page 106.3.2.7 TM-7 to 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs: New TM-7 from CM current
- 11:15, 9 August 2018 diff hist 0 m 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs Smithk moved page 106.3.2.7 TM-7 to 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs: New TM-7 from CM
- 14:51, 8 August 2018 diff hist +9 903.6 Warning Signs →Table 903.6.11 Typical Spacing of Chevron Alignment Signs on Horizontal Curves
- 13:45, 7 August 2018 diff hist +524 m Main Page EPG 806, EPG 616.7, EPG 616.23, EPG 612
- 11:21, 7 August 2018 diff hist +3,480 N 806.7 Other Divisions' Activities Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices. current
- 11:16, 7 August 2018 diff hist +2,530 N 806.6 Proper Operation and Maintenance Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
- 11:13, 7 August 2018 diff hist +4,331 N 806.5 Site Inspections and BMP Repair Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
- 11:12, 7 August 2018 diff hist 0 m 806.4 Preactivity Meeting
- 11:11, 7 August 2018 diff hist +1,310 N 806.4 Preactivity Meeting Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
- 11:09, 7 August 2018 diff hist +2,355 N 806.3 Additional Temporary Erosion and Sediment Controls Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices. current
- 11:07, 7 August 2018 diff hist +27,199 N 806.2 Sediment Control Measures Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
- 11:04, 7 August 2018 diff hist 0 File:806.1.11.1 Zone 3.jpg Smithk uploaded a new version of File:806.1.11.1 Zone 3.jpg current
- 11:04, 7 August 2018 diff hist 0 N File:806.1.11.1 Zone 3.jpg
- 11:03, 7 August 2018 diff hist 0 N File:806.1.11.1 Zone 2.jpg current
- 11:03, 7 August 2018 diff hist 0 N File:806.1.11.1 Zone 1.jpg current
- 11:01, 7 August 2018 diff hist +24,738 N 806.1 Erosion Control Measures Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
- 10:59, 7 August 2018 diff hist -80,078 Category:806 Pollution, Erosion and Sediment Control Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices. current
- 10:51, 7 August 2018 diff hist 0 File:616.8.35 MT.pdf Smithk uploaded a new version of File:616.8.35 MT.pdf
- 10:47, 7 August 2018 diff hist -9 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance: Per TS, TA-35 (MT) was updated to include an additional TMA with additional guidance on what operations TA-35 can be used for.
- 10:26, 7 August 2018 diff hist -4,007 616.23 Traffic Control for Field Operations →616.23.2.6.1 Duration of Work: Per TS, clarified guidance on what traffic control devices are needed based on the work duration.
- 10:13, 7 August 2018 diff hist 0 N File:616.7.2.5.jpg current
- 10:13, 7 August 2018 diff hist 0 File:616.7.2.4.jpg Smithk uploaded a new version of File:616.7.2.4.jpg current
- 10:12, 7 August 2018 diff hist 0 N File:616.7.2.4.jpg
- 10:11, 7 August 2018 diff hist 0 File:616.7.2.3.jpg Smithk uploaded a new version of File:616.7.2.3.jpg current
- 10:11, 7 August 2018 diff hist 0 N File:616.7.2.3.jpg
- 10:08, 7 August 2018 diff hist 0 File:616.7.2.1.jpg Smithk uploaded a new version of File:616.7.2.1.jpg current
- 10:07, 7 August 2018 diff hist 0 N File:616.7.2.1.jpg
- 10:05, 7 August 2018 diff hist +917 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) Per TS, clarified guidance on what traffic control devices are needed based on the work duration.
- 09:53, 7 August 2018 diff hist -44 m Category:612 Impact Attenuators →612.1.5 MoDOT Protective Vehicle/TMA Operator’s Training
- 09:51, 7 August 2018 diff hist +74 N 612.5 Maintenance Planning Guidelines for Impact Attenuators Smithk moved page 612.5 Maintenance Planning Guidelines for Impact Attenuators to 612.4 Maintenance Planning Guidelines for Impact Attenuators: EPG 612.4 Truck-Mounted Attenuator Training has been removed and the former EPG 612.5 is now EPG 612... current
- 09:50, 7 August 2018 diff hist 0 N File:612.2 array.jpg current
- 09:48, 7 August 2018 diff hist +1,171 Category:612 Impact Attenuators Per TS, sand barrel impact attenuator setup will now be based on manufacturer's recommendations instead of std plans. WZ durations have been revised. New guidance clarifies when flashing arrow panel and lights on TMA should be active.
- 11:16, 3 August 2018 diff hist +14 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced "Retroreflectivity Calculation" with "Retroreflectivity Payment Adjustment"
- 13:49, 2 August 2018 diff hist -1 m 751.1 Preliminary Design →751.1.2.20 Soundings (Borings): Per BR, minor grammatical revisions
- 13:21, 2 August 2018 diff hist +94 m 236.13 Designing Right of Way Plans Per RW, updated RW links
- 13:20, 2 August 2018 diff hist +47 m 236.12 Quality Assurance Reviews Per RW, updated RW link
- 13:19, 2 August 2018 diff hist +47 m 236.8 Relocation Assistance Program Per RW, updated RW link
- 13:18, 2 August 2018 diff hist +47 m 236.5 Property Management Per RW, updated RW link
- 13:17, 2 August 2018 diff hist +47 m 236.2 Right of Way Organization and Personnel Per RW, updated RW link
- 13:17, 2 August 2018 diff hist +47 m 236.1 General Information Per RW, updated RW links
- 13:16, 2 August 2018 diff hist +94 m 236.10 Right Of Way Condemnation Per RW, updated RW links
- 13:46, 1 August 2018 diff hist -36 m 320.4 Procedure for Final Sounding Per BR, minor update for "Request for Final Sounding for Structures" Form
- 13:45, 1 August 2018 diff hist -18 m 320.3 Drilling Operations Per BR, minor update for "Request for Final Sounding for Structures" Form
- 13:44, 1 August 2018 diff hist -9 m Category:101 Standard Forms Per BR, minor update for "Request for Final Sounding for Structures" Form
- 13:43, 1 August 2018 diff hist 0 N File:751.1.2.20 Guidance.xlsx
- 13:42, 1 August 2018 diff hist 0 File:751.1.2.20 Request.xlsx Smithk uploaded a new version of File:751.1.2.20 Request.xlsx
- 13:42, 1 August 2018 diff hist 0 N File:751.1.2.20 Request.xlsx
- 13:41, 1 August 2018 diff hist -28 m 751.1 Preliminary Design Per BR, slightly revised the title of "Guidance for Request for Final Soundings for Structures" form. Also, minor update for "Request for Final Sounding for Structures" Form
- 13:51, 31 July 2018 diff hist -206 m 236.12 Quality Assurance Reviews Per RW, updated CFR links
- 14:50, 30 July 2018 diff hist 0 m 751.40 LFD Widening and Repair →751.40.1.2 Steel HP Pile Maintenance and Repair: Per BR, updated link
- 10:48, 26 July 2018 diff hist -33 m 616.14 Work Zone Safety and Mobility Policy deleted photo
- 10:47, 26 July 2018 diff hist -57 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2.3 Short-term Stationary
- 10:18, 26 July 2018 diff hist -27 m 236.16 Outdoor Advertising Per RW, updated link to Performance Bond
- 10:15, 26 July 2018 diff hist 0 N File:236.16 and 941.6.3.6 Performance bond.pdf
- 10:15, 26 July 2018 diff hist +52 m Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: Per TS, added Performance Bond file
- 09:54, 26 July 2018 diff hist -117 m Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: removed link to Performance Bond
- 09:53, 26 July 2018 diff hist +116 m Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: Per TS, added link to Performance Bond
- 08:49, 26 July 2018 diff hist +196 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced JOC Pavement Repair with two forms: JOC Concrete Pavement Repair and JOC Asphalt Pavement Repair. Added a third form (JOC Signal and Lighting Repair)
- 12:55, 25 July 2018 diff hist +118 m Category:101 Standard Forms →Construction and Materials: Per CM, added the 2018 version of the JOC Rail Cable Fence Spreadsheet
- 12:50, 25 July 2018 diff hist +197 m Category:101 Standard Forms →Construction and Materials: Per CM, added two forms (Asphalt Roadway Report Sq. Yards and Final Plans Memo). Updated a third form (Asphalt Roadway Report)
- 08:07, 25 July 2018 diff hist +10 m Main Page EPG 237.14.3.6
- 08:05, 25 July 2018 diff hist +26 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, updated guidance to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures deleted.
- 07:42, 25 July 2018 diff hist 0 File:106.15.2.pdf Smithk uploaded a new version of File:106.15.2.pdf current
- 07:26, 25 July 2018 diff hist 0 File:106.15.1.pdf Smithk uploaded a new version of File:106.15.1.pdf current
- 07:13, 25 July 2018 diff hist +742 m 127.29 Stormwater →127.29.8 MCM 6: Pollution Prevention/Good Housekeeping: Per Env'l, moved EPG 129.13 to EPG 127.29.9
- 07:13, 25 July 2018 diff hist -563 m Category:129 Public Involvement →129.13 Public Involvement for Stormwater: Per Env'l, moved EPG 129.13 to EPG 127.29.9
- 13:19, 24 July 2018 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) updated STIP link
- 12:52, 24 July 2018 diff hist 0 File:756 LRFD flowchart.pdf Smithk uploaded a new version of File:756 LRFD flowchart.pdf
- 10:19, 24 July 2018 diff hist -2 m 751.37 Drilled Shafts →751.37.3 Design for Axial Loading at Strength Limit State: minor correction
- 14:29, 23 July 2018 diff hist 0 N File:Searching the Engineering Policy Guide.docx current
- 14:29, 23 July 2018 diff hist +242 Main Page Added "Searching the Engineering Policy Guide"
- 13:39, 23 July 2018 diff hist 0 File:106.3.2.83.7 elevation.pdf Smithk uploaded a new version of File:106.3.2.83.7 elevation.pdf current
- 13:38, 23 July 2018 diff hist 0 File:106.3.2.83.7 elevation.pdf Smithk uploaded a new version of File:106.3.2.83.7 elevation.pdf
- 13:13, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form 2012.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form 2012.pdf
- 13:12, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form 887.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form 887.pdf current
- 13:11, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form.pdf current
- 11:16, 8 March 2017 diff hist +148 m Main Page EPG 751.22
- 11:11, 8 March 2017 diff hist +522 m 751.22 Prestressed Concrete I Girders →751.22.2.2 Prestressing Strands: Per BR, new guidance to align NU top flange, straight & harped prestressing strands, when possible, in NU prestressed girders to aid fabricating flange blockouts
- 10:27, 8 March 2017 diff hist +96 m Main Page EPG 751.1.2
- 10:26, 8 March 2017 diff hist +79 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: inserted links
- 09:40, 8 March 2017 diff hist +257 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, expanded and clarified bridge approach slabs requirements for Bridge Memo and the Design Layout.
- 08:06, 8 March 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 11:25, 7 March 2017 diff hist +402 m Main Page EPG 751
- 10:37, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.3 Encased Pile Cap Bent
- 10:37, 7 March 2017 diff hist 0 N File:751.32.3.3 part section.jpg current
- 10:37, 7 March 2017 diff hist 0 N File:751.32.3.3 part elev.jpg current
- 10:36, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing
- 10:36, 7 March 2017 diff hist 0 N File:751.32.3.2.1 alternate.jpg current
- 10:35, 7 March 2017 diff hist 0 N File:751.32.3.2.1 steel bearing.jpg current
- 10:35, 7 March 2017 diff hist +5 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 10:34, 7 March 2017 diff hist 0 N File:751.32 circled 7.gif current
- 10:34, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 10:33, 7 March 2017 diff hist 0 N File:751.32.3.2.jpg current
- 10:33, 7 March 2017 diff hist -109 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 09:50, 7 March 2017 diff hist +383 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 09:19, 7 March 2017 diff hist +6 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 09:13, 7 March 2017 diff hist +18 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 08:51, 7 March 2017 diff hist +3,117 m 751.50 Standard Detailing Notes Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 12:03, 6 March 2017 diff hist +660 m 751.6 General Quantities Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 11:57, 6 March 2017 diff hist +50 m 751.5 Structural Detailing Guidelines →751.5.1.3.1 Abbreviations: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 11:54, 6 March 2017 diff hist +3,579 m 751.1 Preliminary Design Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 15:03, 3 March 2017 diff hist -98 m 616.22 Advanced Work Zone Training Per CM and TS, removed references of training courses to coordinate with Sec 616
- 14:24, 3 March 2017 diff hist 0 m Main Page
- 15:43, 2 March 2017 diff hist -3 m 751.10 General Superstructure →751.10.4 Conduit Systems: minor correction
- 13:53, 2 March 2017 diff hist -3 m Main Page
- 14:39, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection Guide.docx current
- 14:38, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection.ppt current
- 14:38, 1 March 2017 diff hist +224 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material Per CM, added links to a PowerPoint, a guide document and checklist for guardrail inspection.
- 12:14, 1 March 2017 diff hist +80 m 751.10 General Superstructure →751.10.4 Conduit Systems: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:11, 1 March 2017 diff hist +18 m 751.8 LRFD Concrete Box Culverts Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:10, 1 March 2017 diff hist +18 m 751.5 Structural Detailing Guidelines →751.5.9.2.7 Length Calculations: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 14:30, 28 February 2017 diff hist +13 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.1 Standard Safety Barrier Curbs used in Missouri: Per BR, corrected TL level for the Type D Std Safety Barrier Curb
- 14:23, 28 February 2017 diff hist 0 N File:Main Page February 28, 2017.jpg current
- 14:22, 28 February 2017 diff hist +34 m Main Page
- 16:23, 27 February 2017 diff hist 0 N File:616.8.50 Feb 27 2017.pdf
- 16:23, 27 February 2017 diff hist +6 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, further clarification of TA 50
- 15:40, 27 February 2017 diff hist 0 m Main Page
- 14:26, 27 February 2017 diff hist +13 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per TS and CM, clarification of placement of the WZ No Phone sign
- 14:22, 27 February 2017 diff hist 0 N File:616.8.50 Feb 2017.pdf current
- 14:22, 27 February 2017 diff hist +8 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, clarification of TA 50
- 13:06, 27 February 2017 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:08, 27 February 2017 diff hist +2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:08, 27 February 2017 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:07, 27 February 2017 diff hist +28 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign: inserted link
- 11:06, 27 February 2017 diff hist +45 m 616.8 Typical Applications (MUTCD 6H) inserted link
- 08:14, 27 February 2017 diff hist +517 m Talk:231.1 Median Width current